Max V Min V 1/e * (Max V – Min V) RF pickup signal (200 ps/pt averaged over 100 pts), 7.5 µs beam τTime (µs) Pickup voltage (V)

Slides:



Advertisements
Similar presentations
Is the shape below a function? Explain. Find the domain and range.
Advertisements

Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
Radar Principles and Systems Part I
Radar Principles and Systems Part I
Update on TERA C-band high gradient test A.D
RF Synchronization, control and stability Takuya Natsui.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Math – Getting Information from the Graph of a Function 1.
Hydrogen Recombination Time (µs) RF Envelope (V) Here So We get Calculated from # of protons per bunch Calculated from energy loss (voltage drop) in the.
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Study of MgB 2 Thin Films on Nb by Pulse Laser Deposition S.Mitsunobu, S.Inagaki, H.Nakanishi, M.Wake and M.Fukutomi* KEK,NIMR*
THE TOP LINAC PROJECT ISS-ENEA Project to demonstrate operability of a compact proton linac in a medium size hospital HIGH POWER RF TESTS OF THE FIRST.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
ECE 662 – Microwave Electronics
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
RF Tutorial G Burt. TM 010 Monopole Mode E H Beam Z 0 =377 Ohms.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Cold Tuner test overview S1-Global at KEK 5-9 July 2010.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
MP - HIPPI General meeting, Abingdon October 28-30, Side Coupled Linac Design at CERN Side Coupled Linac Design at CERN M. Pasini, Abingdon September.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Other Utilities of ALBA LLRF
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
GDE meeting Beijing (Mar.27, 2010) 1 DRFS LLRF system configuration Shin MICHIZONO KEK LLRF lack layout for DRFS DRFS cavity grouping HLRF requirements.
Basic of muon ionization cooling K. Yonehara 8/29/11HPRF cavity physics seminar - I, K. Yonehara1.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
Measurement of 400 MeV Proton Beam Intensity and Transmission Through Collimator of HPRF Cavity at Fermilab MuCool Test Area M. R. Jana 1, M. Chung 1,
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
CERN LHC RF Power Systems
Latest Results on Beam Loaded Experiments at FLASH/TTF Shilun Pei October 27,
Welcome to the RFQ Meeting
Dark current measurement at PITZ
The ISIS Dual Harmonic Upgrade
Outlook of future studies to reach maximum gradient and current
Chapter E –Transistors and H-Bridges
PSB rf manipulations PSB cavities
Upcoming longitudinal MDs
> 50 dB ≤ 500 MHz Non-intercepting beam position measurement
Proposal for IEEE802.11g Receiver Maximum Input Level in OFDM Mode
LHC (SSC) Byung Yunn CASA.
Fabrication of KEK-ATF2 Q-BPM
LCLS Commissioning Parameters
Beam dynamics requirements after LS2
FAIR pLinac RFQ Meeting pLinac RF Power Sources
Explanation of the Basic Principles and Goals
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
JLEIC electron injection demo
The 9th Collaboration Meeting
JLEIC electron injection demo
LCLS Commissioning Parameters
CEPC SRF Parameters (100 km Main Ring)
Used PEP-II 476 MHz Cavities for MEIC Collider Rings
Summary of the maximum SCRF voltage in XFEL
Number Summaries and Box Plots.
Update on transient beam loading at injection
Presentation transcript:

Max V Min V 1/e * (Max V – Min V) RF pickup signal (200 ps/pt averaged over 100 pts), 7.5 µs beam τTime (µs) Pickup voltage (V)

Ratio of minimum pickup voltage to maximum pickup voltage (arb. Units) Beam “tuning” 20 MV/m Reduced intensity 30 MV/m Reduced intensity 10 MV/m Reduced intensity 20 MV/m longer pulse length, full intensity 800 psi H psi H 2 20 MV/m reduced intensity 30 MV/m reduced intensity + freq. mod. 10 MV/m reduced intensity 20 MV/m reduced intensity Pulse number Voltage in the cavity with beam

July 25 th, 14:43:23, 800 psi H2, 27.8 MV/m, full beam intensity E E+11 VoltageCurrentChargeProtons

July 25 th, 15:12:38, 800 psi H2, 20 MV/m, reduced beam intensity E E+10 VoltageCurrentChargeProtons

July 25 th, 800 psi H2, 20 MV/m, reduced beam intensity Before RF “problem” After RF “problem” Min pickup V / max pickup V (arb. units) Pulse number

July 25 th, 15:51:47, 800 psi H2, 30 MV/m, reduced beam intensity VoltageCurrentChargeProtons E E+10

July 25 th, 800 psi H2, 30 MV/m, reduced beam intensity Min pickup V / max pickup V (arb. units) Pulse number

July 25 th, 16:06:08, 800 psi H2, 10 MV/m, reduced beam intensity VoltageCurrentChargeProtons E E+10

July 25 th, 800 psi H2, 10 MV/m, reduced beam intensity Min pickup V / max pickup V (arb. units) Pulse number

July 25 th, 16:18:59, 800 psi H2, 20 MV/m, full beam intensity, longer RF pulse E E+11 VoltageCurrentChargeProtons

July 25 th, 16:25:18, 800 psi H2, 20 MV/m, full beam intensity, longer beam length &RF pulse E E+11 VoltageCurrentChargeProtons

Min pickup V / max pickup V (arb. units) Pulse number July 25 th, 800 psi H2, 20 MV/m, full beam intensity, longer beam length &RF pulse

July 25 th, 16:41:04, 950 psi H2, 20 MV/m, full beam intensity VoltageCurrentChargeProtons E E+11

July 25 th, 16:45:16, 950 psi H2, 20 MV/m, reduced beam intensity VoltageCurrentChargeProtons E E+10

July 25 th, 950 psi H2, 20 MV/m, reduced beam intensity Min pickup V / max pickup V (arb. units) Pulse number

July 25 th, 16:54:44, 950 psi H2, 30 MV/m, reduced beam intensity VoltageCurrentChargeProtons E E+10

July 25 th, 950 psi H2, 30 MV/m, reduced beam intensity, frequency modulation Min pickup V / max pickup V (arb. units) Pulse number

July 25 th, 17:11:32, 950 psi H2, 10 MV/m, reduced beam intensity VoltageCurrentChargeProtons E E+10

July 25 th, 17:11:32, 950 psi H2, 10 MV/m, reduced beam intensity Min pickup V / max pickup V (arb. units) Pulse number