6.2.5.1 Summarizing baseline results Nokia Networks 3GPP TSG RAN WG1 Meeting #81R1-153603 Fukuoka, Japan, 25 th – 29 th May 2015 Agenda Item: 6.2.5.1.

Slides:



Advertisements
Similar presentations
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.
Advertisements

Way forward for LTE DL 4Rx AP SI on RF
© NOKIAProduced as informative material for 3GPP RAN WG1 meeting No. 2 Downlink Shared Channel - DSCH DSCH associated with a dedicated channel (DCH) Downlink.
WF on PBCH Coverage Enhancement
3GPP TSG RAN WG 4 Meeting #1 Howard Benn Convenor Tdoc TSG R4#1(99)018.
R.G. Cole - AT&T Labs1rperfmon BOF Active Probes for Performance Monitoring (APPM) Draft: posted to DISMAN WG list Authors: Cole, R., Kalbfleisch, C. and.
Way forward on eIMTA signaling to support up to 32 component carriers
WF on DL LBT Scheme for DRS
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
WF on specification-based enhancements on CSI-RS and CSI feedback
Research Activities of IMT-2020 (5G) Promotion Group
Tiziana Ferrari Overview of INFN-GRID WP5: Network 1
GSC-19 Meeting, July 2015, Geneva 3GPP and The Road to 5G Erik Guttman, 3GPP SA Chairman, Consultant to Samsung Electronics Co., Ltd. Document No:GSC-19_302.
WF on BS MMSE-IRC receiver
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
WF on CQI Table for eMTC ZTE, Sony, Nokia, Ericsson, Samsung… R GPP TSG RAN WG1 #83 Anaheim, USA, 15th – 22nd November, 2015 Agenda item
R4-15XXXX Way forward on coexistence evaluation methodology for NB-IOT in-band and guard band operation Qualcomm, Huawei, Nokia Networks, ZTE, Intel, Ericsson,
WF on Support of EBF/FD-MIMO Features in TM9
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 © 3GPP 2015 RP-15xxxx What Tuomo and his team achieved 1 3GPP TSG RAN Meeting #70 Sitges,
1 Harmonization Meeting on 3GPP HSDPA and 3GPP2 1xEV-DV Work New-Jersey Nov 2001 HSDPA - Simulation Assumptions in 3GPP TSG RAN WG1 Chairman Antti.
WF on MCOT and CWS for LBT priority classes
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
Proposal for NB-IoT single-tone only UE
R1/S4 meeting, Paris France AMR Mode Command Transmission Options Antti Toskala 3GPP TSG RAN WG1 Chairman Nokia Networks.
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
Overview of open issues in
Summary of SLS for RRM NTT DOCOMO
CT WG6 status report to TSG CT #75
ETSI–3GPP NGN ACTIVITIES
ETSI–3GPP NGN ACTIVITIES
3GPP TSG-RAN WG4 Meeting #84bis
Wayforward on Rel-15 NR Study Items
WF on NPUSCH scrambling for Rel-14 NB-IoT
RACH configuration ZTE, Sanechips R1-171xxxx
Way forward on UE EIS Spherical Coverage and Beam Correspondence
TSG-RAN Workshop on Radio mobility MOB
WF on spherical coverage in FR2
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on SS Block Index Reporting through RACH Procedure
Way forward on cell identification in NR
3GPP TSG RAN Meeting #67 Shanghai, China, 9 – 12 March, 2015
WF on beam reporting CATT, Intel R1-17xxxxx
WF on CSI timing offset for PUSCH
Summary of Power Save Calibration Results
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on NAICS Receiver Terminology
Vodafone, Agilent, Anite, Azimuth, Bluetest, [Intel], ETS-Lindgren
Motorola Mobility, Lenovo, …
WF on scenarios and evaluation assumptions for flexible duplex
Evaluation Model for LTE-Advanced
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Data Exchange.
Way Forward on Coexistence Evaluation Methodologies for LAA
WF on LTE-NR DC with UL coexistence
Summary of Offline Discussion on RMSI CORESET Configuration (Part 2)
Hire Toyota Innova in Delhi for Outstation Tour
Location Based Services support
.
WF on Phase discontinuity issue in intra-band EN-DC with 1-PA
3GPP Liaison Report Date: Authors: May 2008 May 2008
3GPP Liaison Report Date: Authors: May 2012 May 2012
SAMPLE COST ROLL-UP Sample OVERALL COST ROLL-UP
ETSI–3GPP NGN ACTIVITIES
3GPP Liaison Report Date: Authors: January 2013
January 2015 Opening Report
January 2015 Opening Report
Hans (Hyungsoo) Kim KT corp.
Presentation transcript:

Summarizing baseline results Nokia Networks 3GPP TSG RAN WG1 Meeting #81R Fukuoka, Japan, 25 th – 29 th May 2015 Agenda Item:

Summary of simulation results The simulation results for the implementation based enhancement schemes are available in [Ref-1] [Ref-1]: excel sheet for baseline results

Observations-1 Implementation based enhancement schemes have been evaluated for different (M, N, P, Q) TXRU configurations. Results for the following cases are available – (M, N, P, Q) = …,… – FTP and full-buffer traffic – Category-1, 2, 3 and 4 – Results for scenarios 1-6

Observations-2 Note that the implementation of the different schemes depend in part on – TXRU virtualization – TXRU virtualization architecture – CSI-RS to TXRU mapping – Wrapping methodology used – Reference: [Tdoc-1],[Tdoc-2],… [Tdoc-1]: R [Tdoc-2]: R [Tdoc-3]: R