Utilities Working on the Network Health & Safety Requirements.

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 3 – CDM co-ordinator Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Session 9 – Summary & Where Next? Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 8 – Worker engagement & communication Version: September 07.
Managing the Health and Safety of Contractors
Construction (Design and Management) Regulations 2007
Construction (Design and Management) Regulations (NI) 2007 A Client’s Perspective Pat Hannaway CMIOSH MCIWEM MIWO I.Eng.
Guidance Note Work Health & Safety Obligations for Independent Contractors March 2015.
CDM 2015 Key Changes and Duty-Holder Responsibilities
SESSION 2 Key points Module 4 covers consultation requirements under the WHS Act and relies on participants having completed Modules 1 – 3 of this course.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
Independent Contractor Management Program Guide
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
Contractors CDM Compliance Kit CDM Contractors CDM Compliance Kit PRODUCT OVERVIEW.
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
The Rail Safety Summit  2015 RAIL SAFETY SUMMIT 2015.
UK’s CDM Regulations 2007 and its Applications in Singapore
HEALTH AND SAFETY AT WORK ACT (HASWA). What does it do ? HASWA is there to secure the health and safety of people at work. HASWA is there to secure the.
The most precious commodity in your organisation?
Risk Assessment – An Essential Standard
CDM - The Role of The Principal Contractor By John Johnston AIIRSM Health and Safety for Beginners
Occupational Health, Safety & Environment Training OHS Responsibilities and Duty of Care.
Chapter 1.5 Health and Safety at Work Act 1974 (HASAWA)
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Hansen – Managing Safely 1 The Construction (Health, Safety, and Welfare) Regulations 1996 Mark Mallen Health And Safety Manager Fenlock Hansen Ltd.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Overview Version: September 07.
CDM 2015 – HSE’s PERSPECTIVE Health and Safety Executive
NEBOSH LEVEL 6 NATIONAL DIPLOMA MODULE A: MANAGEMENT OF HS LESSON 9 : CRIMINAL LAW Part One: HASAWA 1974.
Roles and Responsibilities
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
9 SEPTEMBER 2015 – KATHERINE MORRIS AND LUCY BOCHENEK Is it possible to comply with the safety aspects of the Petroleum & Gas (Production & Safety) Act.
Health and Safety Policy
Health and Safety Executive Health and Safety Executive CDM 2015 & information a view from HSE Louise Brearey Head of Operations HSE London & South-East.
Health and Safety At Work Etc. Act 1974 J Health and Safety Policy Statement J. C. Pomfret Construction.
Risk Management and PINs Why risk management is so important Why HSRs should be “qualified” to issue PINs 1 Training & Safety Consultants.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
HEALTH & SAFETY AT WORK etc ACT 1974 LEVELS OF DUTY/LEGAL TERMS “It is the duty”:- Absolute - it must/shall/will be done Summers Vs Frost (1955) “Practicable”:-
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
Health and Safety Everyone’s responsibility
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
IOSH Midlands South Branch Legal Update 30 September 2015 Andrew Litchfield – Wragge Lawrence Graham & Co LLP.
Legal duties of employer and employees Health & Safety legislation has recently grown. Initially it was introduced in response to accidents that involved.
CDM 2015 Simon Longbottom 20 May Progress Significant culture change over last years Long-term downward trend fatals/major injuries Greater.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Health and Safety Induction for Managers. Introduction This induction supplements the Health and Safety Induction for Staff and should be viewed by all.
CDM Construction Design and Management
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Lone Working – Good Practice Marie Foster Early Years Safeguarding Officer.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
Desk Based Preconstruction – Planning
Maintaining Safety Standards
Project Risk Management Case Study Commercial Construction
Employee rights and responsibilities
Maintaining Safety Standards
Temporary Works Co-ordination
Design Risk Management Spotlight on CDM 2015
People Responsible For Health and Safety
CDM 2015 COSG Update.
The Construction (Design and Management) Regulations 2015
OHS–Occupational Health & Safety
Prevention through planning, control and monitoring Harold Chinogurei
Ray Filip BEng (Hons), MSc, DIC, CEng, FICE Temporary Works Consultant 31 years temporary works experience: Concor Construction (Africa) John Laing.
Effective Construction Safety Management
Presentation transcript:

Utilities Working on the Network Health & Safety Requirements

Key Legislation & Guidance  New Road & Street Works Act 1991  EToN 6 – Technical Specification on Notification and Advanced Planning  Health & Safety at Work etc. Act 1974  CDM Regulations 2015

Notification Process  All utilities companies working on the network have a duty to notify planned works  This is done electronically  Most works are subject to the standard notice periods – major works requiring 90 days notice are unusual  Even emergency works require notice  Utilities work will need to be accommodated with other routine maintenance work and on major projects

Notification Periods - NRSWA Works Category MinimumNoticePeriods Section 54Section 55Section 57 Major3 months10 days Standard10 days Minor3 days Urgent2 hours Emergency2 hours

Process for Stand Alone Utilities Work  Road space is booked with Highways England and permission given for the work to be undertaken on the network  Relevant Service Providers and DBFO companies are advised of works booked  Highways England are not the client  If there are health and safety concerns with any works being undertaken this can be escalated to the Utility Company directly OR via the Service Provider or DBFO Company as they have an overarching duty of care to manage, monitor and co-ordinate health and safety on the network

Standard Process Involving Utilities in NDD and Major Projects Schemes  During pre-construction phase for maintenance, improvement works or major projects any service clashes are identified by the PD  PC contacts Utilities to advise & informs Highways England  Highways England instructs Utilities to carry out enabling works  Highways England are the client and must discharge client duties  However, the PC retains a duty of care to plan, manage, monitor and co-ordinate health and safety on site

What are Highways England’s client responsibilities?  Standard design and client responsibilities:  Duty holders appointed – Principal Contractor and Principal Designer  Adequate time and resources allocated  Adequate H&S arrangements in place  Information provided to duty holders  Confident that the PC and PD can carry out their duties  Welfare arrangements organised

Key Safety Points Operationally  Site induction and site rules adhered to  RAMS in place and implemented  Appropriate traffic management  Service avoidance  Safe excavations  Safe plant and people interface  Utilities works co-ordinated with other road construction activities where relevant  If you are visiting site and you see something you are concerned about you have a duty to follow it up and ask questions – H&S Business Partners are available to support you, just get hold of your local contact

H&S Business Partner Actions  Review of all accidents, high potential near misses, service strikes etc. involving utilities to ensure that lessons are learnt  Engagement with supply chain partners and associated local utilities to improve safety arrangements  Rolling out Raising the Bar documents within NDD works as well as Major Projects to support Aiming for Zero  Increased focus on safety audits by Highways England H&S Business Partners  Supporting Project Sponsors locally to resolve any safety issues

Useful Raising the Bar Documents  R t B 1 – Plant & Equipment  R t B 2 – Traffic Management Entry and Exit  R t B 3 – Man Machine Interface  R t B 9 – Service Avoidance  R t B 10 – Communication of Risks  R t B 13 – Excavation Protection – Access and Egress  R t B 23 – Site Inductions  Link to Raising the Bar:  road-schemes-raising-the-bar-initiative road-schemes-raising-the-bar-initiative

When it goes wrong … A31/A34/M40  Following an inspection by the HSE the PC received a Notification of Contravention (a formal letter) for failure to comply with CDM Regulations – Duties of PC  A Supervisor for Morrison Utilities Ltd was seen in an excavation whilst an excavator bucket operated in front of him to remove made up ground. The excavation did not have any supports and had not been battered back.  The system of work was inherently unsafe – the trench was liable to collapse and the bucket of the excavator was liable to strike the Supervisor.  Further work on this excavation was ceased.

Photograph Detailing Contravention

Duties of Principal Contractors  All PCs MUST plan, manage and monitor the construction phase in a way which ensures so far as is reasonably practicable, it is carried out without risks to health or safety  This duty extends to supervising the activities of contractors  In this instance the Supervisor from Morrison Utilities agreed with the Inspector on site that he had no need to enter the unsupported trench – he could have used a piece of timber to measure the depth of the excavation without entering it  After this incident the excavator being used was fitted with mirrors and a warning beacon  Fortunately for the PC no statutory notices were served but remember HSE interventions are now charged for at £124 per hour!

All Inspectors and Sites are Different  A contractor working on the A61 near Barnsley was served with a Prohibition Notice following an HSE inspection  Workers were observed working in an unsupported trench of over 1 m where there was a risk of collapse  Again CDM Regulations were contravened and listed on the notice  Plus the Inspector sited failures under the Health & Safety at Work Act section 3 (1) duties to other persons not in the contractors direct employment  A charge for HSE’s time was also issued – a Fee for Intervention Notice

Summary  Highways England as an exemplar client needs to be sure that utilities companies are operating safely on the network  Utilities are experts in their own technical spheres but clearly there have been some serious safety issues experienced in the last 6 months primarily with unsafe excavations and plant operation  Closer focus on safe arrangements with utilities is needed and lessons learned shared across the organisation  Excavations should only be entered where they are supported and where there is an absolute requirement to enter them  Plant operation in close proximity to people needs to be minimised and controlled where it is unavoidable by having a Safe System of Work. This might include the use of signallers, ensuring a level of competency training, improved crew communication, mirrors, proximity sensors etc.  For further guidance contact your H&S Business Partner