DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.

Slides:



Advertisements
Similar presentations
XFEL 2004 at SLAC m. ferianis Synchronization and phase monitoring: recent results at ELETTRA Synchronization experiment using light sources currently.
Advertisements

Femtosecond Pump / Probe Operation and Plans at the LCLS
Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Bunch Length Measurements at the Swiss Light Source (SLS) Linac at the PSI using Electro-Optical Sampling A.Winter, Aachen University and DESY Miniworkshop.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
RF Synchronisation Issues
Measurements with laser at MPP and updates on RF synchronization Reported by Heiko Damerau (CERN) Measurements jointly with J. Moody, P. Muggli (MPP),
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
WP06_AntennaIF. WP06_AntennaIF 3 principal modules switch amplifier (= ATA ‘PAM’) –includes attenuators (0-60 dB), power detector, and bias tee for the.
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
RF Synchronization, control and stability Takuya Natsui.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
SJD/JJAdvisory - Sept Fiber Phase Stability Status Steven Durand & Jim Jackson September 8, 2003 National Radio Astronomy Observatory a facility.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Analysis of Phase Noise in a fiber-optic link
1 Business Telecommunications Data and Computer Communications Chapter 4 Transmission Media.
S. Manz 1*, A. Casandruc 1, D. Zhang 1, J. Hirscht 1, S. Bayesteh 3, S. Keskin 1, J. Nicholls 4, T. Gehrke 3, F. Mayet 3, M. Hachmann 3, M. Felber 2, S.
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Volker Schlott SV84, LL-RF Workshop, CERN, October 11 th, 2005 Femto-Second Stable Timing and Synchronization Systems Volker Schlott, PSI Motivation –
Crystals Oscillators Real-Time-Clocks Filters Precision Timing Magnetics Engineered Solutions Crystals Oscillators Real-Time-Clocks Filters.
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
The PITZ Timing System Frank Tonisch DESY - Zeuthen.
G J Hirst Central Laser Facility Status of the CTF3 Photoinjector Laser at CCLRC Central Laser Facility G J Hirst, M Divall, G Kurdi, W L Martin, I O Musgrave,
Lasers and RF-Timing Franz X. Kaertner
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Frank Ludwig, DESY Content : 1 Stability requirements for phase and amplitude for the XFEL 2 Next LLRF system for optimized detector operation 3 Limitations.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
1/19/2006Frank Lenkszus Advanced Photon Source 1 ILC Timing Frank Lenkszus Controls Group Advanced Photon Source Argonne National Lab.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
SSR1 Cryomodule Development for PXIE - Alignment T. Nicol Decenber 6, 2011.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
AWAKE synchronization with SPS Andy Butterworth, Thomas Bohl (BE/RF) Thanks to: Urs Wehrle (BE/RF), Ioan Kozsar, Jean-Claude Bau (BE/CO)
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
LLRF Stability Improvements for the Operation of SACLA T. Ohshima*, H. Maesaka, S. Matsubara, Y. Otake RIKEN, SPring-8 center LLRF workshop 2015, Shanghai,
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
April 12 | Comparison of Sophisticated Synthesizer Concepts and Modern Step Attenuator Implementations | 2 Comparison of Sophisticated Synthesizer Concepts.
LLRF 15 Daresbury Andrew Moss ASTeC, STFC Daresbury Laboratory.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Sub-10 fs RF Regulation at REGAE Matthias Hoffmann for the LLRF team Low Level Radio Frequency Workshop 2015 Shanghai,
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
Status of SPARC synchronization system and possible upgrades
LCLS_II High Rep Rate Operation and Femtosecond Timing
ESS Phase Reference Signal Distribution
ILC Phase Reference Distribution R&D
Methods of transfer of ultra-stable frequencies to radio telescope
Timing and synchronization at SPARC
WP02 PRR: Master Oscillator and RF Reference Distribution
EuCARD2 proposal LLRF Optimization at FLASH
Terry Cotter LO/IF Group Leader
LCLS Drive Laser Timing Stability Measurements
LCLS RF Stability Requirements
CLIC Feasibility Demonstration at CTF3
Operational Experience with LCLS RF systems
Breakout Session SC3 – Undulator
Presentation transcript:

DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg

DESY MHF-p 2 RF System Requirements System Length200 m (VUV_FEL); 3 km (XFEL) RF Phase Noise (within macropulse – 1 ms) 0.05 o RMS (at 1.3 GHz)  ~0.1 ps RF Phase Noise (during 100 ms time) 0.15 o RMS (at 1.3 GHz)  ~0.3 ps RF Phase Stability (short term <1 minute) <0.5 o (at 1.3 GHz)  ~1 ps RF Phase Stability (long term) <5 o (at 1.3 GHz)  ~10 ps RF frequency range 1 MHz – 2.8 GHz

DESY MHF-p 3 System components Ultra high stable master oscillator RF distribution system (length at VUV-FEL about. 200 m) Temperature stabilized coaxial cables Local 1.3 GHz/2.856 GHz frequency generation Fiber optic and coaxial system to monitor and correct long term phase drifts

DESY MHF-p 4 Frequencies to be distributed the exact frequencies are multiples or divisions of the MHz reference frequency 1 MHz (timing of complete machine) 9 MHz (master reference frequency) 13.5 MHz (Laser “new”) 27 MHz(Laser “old”) 54 MHz(Laser for future use) 81 MHz(distribution frequency) 108 MHz(Streak camera [near RF Gun; Experimental Hall]) 1300 MHz(reference frequency for the linear collider) 1517 MHz(reference frequency for beam position monitors) 2856 MHz(“LOLA” = transverse deflecting cavity for bunch measurements)

DESY MHF-p 5 Block diagramme of MO (low level part)

DESY MHF-p 6 Phase noise requirements for the 1.3 GHz reference frequency

DESY MHF-p 7 Phase noise performance of a 27 MHz crystal oscillator

DESY MHF-p 8 Phase noise performance of a 81 MHz crystal oscillator Phase noise is better above  400 Hz from carrier!

DESY MHF-p 9 MO front panel (low level part)

DESY MHF-p 10 Layout of the Reference frequency distribution system for TTF2

DESY MHF-p 11 The problem of long coaxial distribution links: Attenuation of coaxial cable vs frequency

DESY MHF-p 12 Phase stability of coaxial cable vs. Temperature ½ ´´ cable

DESY MHF-p 13 Phase stability of coaxial cable vs. Temperature 7/8 ´´ cable

DESY MHF-p 14 Advantages and disadvantages of coaxial cables Coaxial cables for distribution: - high attenuation (e.g. 1.3GHz A / 100m = 8dB) - physical dimensions - require temperature stabilization - can cause ground loops and pick up EMI Fiber Optics for monitoring : - require active temperature stabilization - the system components are more expensive in comparison to coaxial line system components - high amplitude noise of a FO link Solution: A combination of both technologies will be implemented and studied at TTF2.

DESY MHF-p 15 Fiber optic distribution scheme

DESY MHF-p 16 First results of fiber optic stabilization