PUMP PROJECT Germania Unit Rate Forecasting Based on Other Waterflood Pilots in the Spraberry Area.

Slides:



Advertisements
Similar presentations
Predicting Future Gas Lift Performance in a Mature Water Flooded Field
Advertisements

Marco R. Thiele and Rod P. Batycky
DL PETROLEUM ENGINEERING AND CONSULTING LIMITED
DOE HORIZONTAL PROJECT
University of Minho School of Engineering Institute for Polymer and Composites Uma Escola a Reinventar o Futuro – Semana da Escola de Engenharia - 24 a.

Data Mining & Oil-Field Modeling Y.Chang. Outline Background Reservoir Simulation Modeling Examples and Projects.
Visit from DONG Energy Åsmund Haugen, Bergen, 9 jan
Runway & Taxiway Markings
DESIGN AND IMPLEMENTATION OF A CO2 FLOOD UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL INJECTION WELLS IN A SHALLOW SHELF CARBONATE APPROACHING.
PUMP PROJECT Germania Unit Rate Forecasting Based on Other Waterflood Pilots in the Spraberry Area.
Pioneer Natural Resources
E. Putra, Y. Fidra and D.S. Schechter
Pioneer Natural Resources
CIPC Application of X-Ray CT for Investigation of CO 2 and WAG Injection in Fractured Reservoirs D. Chakravarthy, V. Muralidharan, E. Putra and.
Putra - 05/21/2003Slide - 1 Tamu NFR Research Group Reservoir Characterization and Simulation Group Experimental Group Reservoir Modeling Group.
Decline Curve Analysis Using Type Curves —
Pioneer Natural Resources
Oil Field Manager ~ Presentation
Lead Black Slide. © 2001 Business & Information Systems 2/e2 Chapter 13 Developing and Managing Information Systems.
Vivek Muralidharan Simulation and imaging experiments of fluid flow through a fracture surface: a new perspective.
Monitoring the Movement of CO 2 at the Upper Spraberry Reservoir Using Well Logs Gokul Lakshman Texas A&M University Pioneer Natural Resources.
T T18-09 Line Plot (by Observation) Purpose Allows the analyst to visually analyze up to 5 time series plots on a single graph data samples by.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
Significant New “Learings” From An Integrated Study Of An Old Field, Foster/South Cowden Field (Grayburg & San Andres), Ector County, Texas DE-FC22-93BC14982.
Chapter 1 RESERVOIR.
Long Term World Oil Supply (A Resource Base/Production Path Analysis)
Office of Project Management Metrics Report Presentation
Optimizing In Fill Well Drilling - Wamsutter Field
Significant New “Learnings” From An Integrated Study Of An Old Field, Foster/South Cowden Field (Grayburg & San Andres), Ector County, Texas. Robert C.
Classification: Internal Status: Draft Low Salinity Waterflooding: Opportunities and Challenges for Field Pilot Tests Dagmar Spangenberg, Peimao Zhang.
© 2001 Business & Information Systems 2/e1 Chapter 13 Developing and Managing Information Systems.
Improved Recovery Demonstration for Williston Basin Carbonates DE-FC22-93BC14984 Luff Exploration Company Mark Sippel, Consulting Engineer.
Reservoir Simulation Study
Stage in Field Development
Base Case Simulation Model
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
Tom Beebe Project Manager
How to read a topographical map
Waterflood Management Case Study - Goal  Change waterflood strategy early in waterflood to maximize recovery: 12 months of waterflood performance Predicted.
CO2-Prophet model based evaluation of CO2-EOR and storage potential
Retrospective Production Optimization Under Uncertainty Using Kernel Clustering Mehrdad Gharib Shirangi and Tapan Mukerji Department of Energy Resources.
PAWNEE RESERVOIR SIMULATION STUDY Pioneer Natural Resources Co. Performed By Gemini Solutions, Inc. January 2001.
Forecasting UK Ratings Numbers Proposed Methodology D. Glen & J. Dowden.
Draw the plan and the elevation of the cylinder, leaving 30mm between views Ø 40.
Date of download: 10/22/2017 Copyright © ASME. All rights reserved.
Chapter 9 Problem Well Analysis.
Mott Community College Budget Update
Decline Curve Analysis Using Type Curves —
CH19: Carbon Sinks and Sources
Pitchfork Field Study Rochak Karki, Dhruba Panta, Tayyab Parvez, Rebecca Podio and Omair Sadiq.
Modeling Natural Fracture Networks in the Context of Flow Simulations: Teapot Dome, Wy Thomas H. Wilson, Department of Geology and Geography, West Virginia.
Problem statement Given: a set of unknown parameters
Comparison of the LL95%CI rule to PE rules with similar behaviour, when the true HR is different from the design HR: %acceptance of maximal relative benefit,
How do we use this information?
Reservoir Simulation FEEDBACK INPUT Geologic Model Time
Siyao Xu Earth, Energy and Environmental Sciences (EEES)
Volume 96, Issue 10, Pages (May 2009)
Proposed informatics pipeline for microbial genomic analysis in the clinical microbiology laboratory. Proposed informatics pipeline for microbial genomic.
Confinement-Dependent Friction in Peptide Bundles
Economic Models By: Ben Quick.
The Use of Electrical Measurements to Investigate Multiphase Flow Channeling During Reservoir Production Stephen Moysey, Env. Eng. & Earth Sciences, Clemson.
Sand face pressure vs. rate (Oman)
Fig. 4 States of the Antarctic Ice Sheet after 10,000 years.
Linearity of the relationships between spectral abundance factors observed when 30 and 120 μg protein were analyzed, as described in research design and.
Update on the Audit of Available Fracture Models for PWRI
Fig. 2 Number of years that would have been required for the observed vertebrate species extinctions in the last 114 years to occur under a background.
Most virus-related pyrosequencing reads found in raw sewage represent previously unknown viruses. Most virus-related pyrosequencing reads found in raw.
SPEGC Northside Study Group “Unconventional Reservoir Horizontal, Multi-Stage Completion Design Optimization” Presented by Stephen Schubarth President.
David L. Bostick, Karunesh Arora, Charles L. Brooks 
Presentation transcript:

PUMP PROJECT Germania Unit Rate Forecasting Based on Other Waterflood Pilots in the Spraberry Area

PUMP PROJECT Objectives To propose the location of new injection wells in the Germania Unit. To forecast the incremental oil recovery due to waterflooding in other waterflood Pilot area. The rate forecast is applied to Germania Unit for economic purpose.

PUMP PROJECT FUTURE WORK (Last Meeting) Improve OFM model to get external data from other Database systems, such as ODBC (Microsoft Access, Dwights and PI). Perform similar tasks for ET O’Daniel Pilot Area Perform reservoir simulation

PUMP PROJECT Coupling between Injector and Producers 1.The coupling is taken based on the production response in the on trend and off trend wells during the waterflood period. 2.This coupling could be used to determine the new location of injection wells.

PUMP PROJECT Germania (Spraberry) Unit Layout 1.The red line indicates a coupling between an injector and producers and rectangular box indicates the well has available production history. 2.WIWs #8, 11, and 15 did not have significant effect on surrounding oil production wells. 3.The production responses obtained from coupling between an injector and producers are parallel to the fracture orientation in NE-SW direction.

PUMP PROJECT

Germania (Spraberry) Unit Layout The green ring fence is taken from the O’Daniel Pilot assuming this unit would behaves similar response. The circle mark indicates the proposed injection wells. From the coupling between injection and production shows that the location of proposed injection wells #408A and 10 should be relocated because they are along old injector path. The wells that have shown good waterflood response in the other Pilots are analyzed to determine the incremental oil recovery during waterflooding. The results are applied to Germania Unit for economic purpose.

PUMP PROJECT Water Injection in The Germania Unit

PUMP PROJECT TOW Production Summary of GSU - 21

PUMP PROJECT Decline Curve Analysis of GSU – 21 (GSU – 27 as an Injector)

PUMP PROJECT Production Summary of The Germania Unit

PUMP PROJECT Decline Curve Analysis in The Germania Unit Based on Current ET O’Daniel Waterflood Pilot

PUMP PROJECT Rate Forecasting based on Incremental Oil from Current ET O’Daniel Waterflood Pilot

PUMP PROJECT Decline Curve Analysis in The Germania Unit Based on Old ET O’Daniel Waterflood

PUMP PROJECT Rate Forecasting based on Incremental Oil from Old ET O’Daniel Waterflood

PUMP PROJECT Infill Well vs. Waterflooding

PUMP PROJECT Cumulative Oil Comparison between Infill Well and Waterflooding Scenarios

PUMP PROJECT Decline Curve Analysis 28 Wells in The E.T O’Daniel Pilot Area

PUMP PROJECT Decline Curve Analysis 28 Wells in The E.T O’Daniel Pilot Area

PUMP PROJECT Incremental Oil Rate 28 Wells in The E.T O’Daniel Pilot Area

PUMP PROJECT Production Summary of The Old ET O’Daniel Waterflood

PUMP PROJECT Decline Curve Analysis Old E.T O’Daniel Performance

PUMP PROJECT Incremental Oil Rate Old E.T O’Daniel

PUMP PROJECT Total Incremental Oil Production Old E.T O’Daniel