IACT 901 Module 12 1 Planning, People SITACS University of Wollongong IACT 901 2004.

Slides:



Advertisements
Similar presentations
DEPARTMENT OBJECTIVES 1. To Identify and deploy information technology to meet business objective at CKPL. 2.To Provide support to users for systems usage.
Advertisements

Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
14.1 © 2007 by Prentice Hall 14 Chapter Project Management: Establishing the Business Value of Systems and Managing Change.
INDUSTRIAL & SYSTEMS ENGINEERING
Redesigning the Organization with Information System
Software Evolution Managing the processes of software system change
Dr Kettani, Spring 2002 Software Engineering IIFrom Sommerville, 6th edition Software change l Managing the processes of software system change.
Managing the Information Technology Resource Jerry N. Luftman
Chapter 12 Strategies for Managing the Technology Infrastructure.
CSEM01 SE Evolution & Management Anne Comer Helen Edwards
IT Planning.
Principles of Information Systems, Seventh Edition2 An organization’s TPS must support the routine, day-to- day activities that occur in the normal course.
15 1 Chapter 15 Database Administration Database Systems: Design, Implementation, and Management, Seventh Edition, Rob and Coronel.
Software evolution.
Human Resource Management: Gaining a Competitive Advantage
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Enterprise Systems Organizations are finding benefits from using information systems to coordinate activities and decisions spanning multiple functional.
For use with Human Resource Management in South Africa 4e by Grobler, Wärnich et al ISBN: © 2010 Cengage Learning CHAPTER 2 Human Resources.
Introduction to Systems Analysis and Design
Managing Projects
Chapter 19 OPERATIONS AND VALUE CHAIN MANAGEMENT © 2003 Pearson Education Canada Inc.19.1.
1 Chapter 9 E-commerce portal design strategy. Learning objectives  At the end of the chapter, the students would learn  The need to design e-commerce.
PHASE 3: SYSTEMS DESIGN Chapter 8 System Architecture.
1.Database plan 2.Information systems plan 3.Technology plan 4.Business strategy plan 5.Enterprise analysis Which of the following serves as a road map.
Introduction to Information System Development.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Organizing Information Technology Resources
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 14 Enterprise Resource Planning Systems.
Module 2.1 Finance and Administration Cabinet Organizational Changes and Agency Impact March
Strategic Role – Approach
Test Organization and Management
Laudon & Laudon: Canadian Edition
Software evolution. Objectives l To explain why change is inevitable if software systems are to remain useful l To discuss software maintenance and maintenance.
Software change  Managing the processes of software system change.
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 27Slide 1 Software change l Managing the processes of software system change.
16-1 Introduction Human resource management practices can help companies gain a competitive advantage. Virtually every HR function in top companies is.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
PROJECT 123 Business Case March 30, Page 1 Authors: Saltlane Table of Contents Executive Summary Background Scope Approach Resource Requirements.
Database Administration
Chapter 2  2000 by Prentice Hall. 2-1 How Businesses Use Information Systems Uma Gupta Introduction to Information Systems.
Information: Policy, Strategy and Systems Module Overview
Strategically Managing the HRM Function McGraw-Hill/Irwin ©2012 The McGraw-Hill Companies, All Rights Reserved.
The CSO’s IT Strategy – using the GSBPM to support good governance MSIS 2010 – Daejeon April 2010 Joe Treacy Central Statistics Office.
Manag ing Software Change CIS 376 Bruce R. Maxim UM-Dearborn.
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
Chapter 5 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the OWASP License. The OWASP.
The Value Driven Approach
Chapter 3 Strategic Information Systems Planning.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
INTRODUCTION TO MANAGEMENT INFORMATION SYSTEM. INTRODUCTION Now a day, there are many companies, which depend on their computers for their day-to-day.
CHAPTER 2 TYPES OF BUSINESS INFORMATION SYSTEM. INTRODUCTION Information System support business operations by processing data related to business operation.
Database Systems. Role and Advantages of the DBMS Improved data sharing Improved data security Better data integration Minimized data inconsistency Improved.
PowerPoint Presentation by Charlie Cook The University of West Alabama Business Essentials Ronald J. Ebert Ricky W. Griffin The Business of Managing 22.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 21 Slide 1 Software evolution.
The CSO’s IT Strategy and the GSBPM IT Directors Group October 2010 Joe Treacy Central Statistics Office Ireland.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
Enterprise Resource Planning (ERP) The need for integrated information in business.
GRC: Aligning Policy, Risk and Compliance
Purchasing Cards. What is a Purchasing Card? It is a type of commercial credit card, used by organizations for payment of goods and services. This tool.
Module 1: Overview of Information System in Organizations
10.3 Managing strategic implementation
Strategic Training.
Management Functions Administration
Chapter 12 Implementing strategy through organization
Chapter 12 Implementing strategy through organization
Database Administration
Enterprise Resource Planning Systems
Presentation transcript:

IACT 901 Module 12 1 Planning, People SITACS University of Wollongong IACT

IACT 901 Module 12 2 Objectives Understand why it is essential to implement necessary management tools and operational processes, procedures, organisation work flow and service levels to maintain the more complex environment.

IACT 901 Module 12 3 Planning IS was originally the saviour of all corporate administrative problems due to automated payroll systems and ledger processing on the mainframe PCs changed this and users implemented their own solutions on the desktop PC users could support their requirements in a more timely and less costly manner

IACT 901 Module 12 4 Client/Server Technology By using client/server technology more power was at the local level. Local departmental business issues were easily supported. Mainframes were replaced with client/server technology. Failure not the fault of the technology, but lack of mission-critical systems.

IACT 901 Module 12 5 Mission Critical Systems Mission critical means a set of standards, guidelines, processes, procedures and management policies based on budget, planning and overhead. Team involvement, communication and planning with IS and end-users.

IACT 901 Module 12 6 Scenario of Your Business IS architecture cannot be developed without understanding the corporate or industry economics and business strategy. – Are you driven by sales or manufacturing? – Is beating your competitors or innovating faster the key to your success? – How easily can your products/services be imitated? – How many competitors do you have now and expect in 5 years time?

IACT 901 Module 12 7 Consider Changes on IS If a division was sold, how fast could you separate your IS system? How fast could you merge systems if a new division was acquired. Are you likely to be reorganised, open or close a new facility? How many new products/services do you intend to introduce this year/future? Are there re-engineering initiatives starting or under- way?

IACT 901 Module 12 8 Flexibility The answer to the previous change questions has to be ‘flexibility’. Many data systems are made complex and are often faulty by being too expensive on staff, hardware or software.

IACT 901 Module 12 9 People Once you have planned you need to consider the people affected by the changes you’re bringing about.

IACT 901 Module People Areas to Consider Organisation Staffing Roles and responsibilities Mentoring Training/transitioning Human resources Metrics Cultural differences

IACT 901 Module Organisational Design Division of Labor - Ford motor company and the assembly line. Participative management - performance driven by motivation and not division of functions. Divisional corporation - DuPont - large organisation divided into divisions to control and organise business activities.

IACT 901 Module IS Design The organisation as it changes must reflect those changes in its IS group. The challenge is to view the organisation as a series of processes and translate them into accepted business norms. THEN you need to allow data movement across organisational borders.

IACT 901 Module Cross Functional Teams A business process as all tasks and sub- processes wherever they may exist, that result in the creation of a service or product. It is the total process that creates the product and prepares it for sale which is important. The IS group needs to evaluate its contribution to the process and restructure as required.

IACT 901 Module IS Ready for Change 1. Draw a map - analyse the organisation’s business processes. – Diagram the process flow. – Map data and applications that support those tasks. – Map IS resources needed to support business processes. Result is a cross-functional IS team.

IACT 901 Module IS Ready for Change 2. Find the process owner. – The process lasts forever, the project ends. – The IS process owner manages the technical issues and the IS area manager manages the people. – IS process owner and IS area manager prepare performance reviews jointly. Results are the bottom line.

IACT 901 Module IS Ready for Change 3. Develop processes (policies) for getting tasks completed on time. – You need a fully functional request/problem report project management system. – Internal IS group processes need to be developed to get work done.

IACT 901 Module Correct IS Design The right organisational design for an IS group is one that parallels the organisation. If the organisation is vertical then the IS should be vertical. Formal hierarchy are still required for most organisation. Using IT within the IS group and throughout the organisation can start to eliminate the borders within the organisation.

IACT 901 Module The Organisation Structured for Success Technical change + resources and time for implementation = learning + economic benefits to the firm + benefits to the worker. The balance between technology, resources and time and the benefits that the combination of these ingredients can generate will result in a successful transformation.

IACT 901 Module Organisational Issues 1. All IT purchased are important and must be managed in a consistent manner. 2. Staff, must be treated the same, regardless of the technology platform they work on. 3. A merger of legacy and client/server staffs is a restructure and will take time. 4. Culture is the single most important issue to manage during the transformation.

IACT 901 Module Global Infrastructure Think globally and work locally. Adapt, don’t build something new. Use a set of governance policies to allow de- centralised staff to play a role in the development of the enterprise’s IS standards.

IACT 901 Module Staffing Staffing should be based on the organisational structure and doing more with less. Standardardise and invest in tools and provide the right staffing to meet needs. Key areas are: systems administration, networking, database administration and production control.

IACT 901 Module Production Control Most important. – Once production is defined a group must be accountable for delivery and ownership of the production environment. – Production control resides within the technical support group in the data centre organisation or the infrastructure support group.

IACT 901 Module Mentoring Specialised hand-holding and guidance in building a flexible infrastructure. Helps people learn and overcome biases. Mentoring takes time.

IACT 901 Module Training IS must invest and provide training for staff. Training must be in place to move forward. Train old staff as they understand the business.

IACT 901 Module Metrics Track every class taken, seminar attended, projects completed, books read, assignments completed….. It’s essential.

IACT 901 Module The Leader Is the leader a hands-on person or work through a network of management layers. The closer the leader is to the action, the better chance the IS organisation has of unifying. When a CIO is knowledgeable of day-to-day issues, it allows him/her to lead when staff deviates from the goal.

IACT 901 Module Manageable Serviceable Reliable Available Problem Mgmt Change Mgmt Asset Mgmt System and Network Security Version Release Mgmt, Software Distribution, Perform. Monitoring Job Scheduling Network Mgmt, User Security Access, Event Monitoring, Console Mgmt, Disk Mgmt, Data (Storage) Mgmt, Disaster Recovery

IACT 901 Module 12 28