U.S. Department of the Interior U.S. Geological Survey LDCM Ground System Update Jim Nelson U.S. Geological Survey – LDCM Ground System Manager August.

Slides:



Advertisements
Similar presentations
U.S. Department of the Interior U.S. Geological Survey Agency Report, WGISS #24 October 19, 2007 Lyndon R. Oleson U.S. Geological Survey Center for Earth.
Advertisements

Landsat Data Continuity Mission (LDCM) USGS Project Status Report January 6, 2009 Dave Hair USGS LDCM Project Manager
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
Landsat Data Continuity Mission (LDCM) USGS Project Status Report
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 Laser Ranging (LR)-Lunar Reconnaissance Orbiter (LRO) Data Flow and Scheduling.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
02/07/2001 EOSDIS Core System (ECS) COTS Lessons Learned Steve Fox
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
NASA Goddard Space Flight Center Direct Readout Laboratory NPP/JPSS HRD/LRD Status Patrick Coronado NASA Goddard Space Flight Center directreadout.sci.gsfc.nasa.gov/ipopp.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
Solution Overview for NIPDEC- CDAP July 15, 2005.
Server Virtualization: Navy Network Operations Centers
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
U.S. Department of the Interior U.S. Geological Survey Landsat Program Update October 2005 Presented By: U.S. Geological Survey, Center for EROS Sioux.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
Persistent Digital Archives and Library System (PeDALS) SC Department of Archives and History.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
June 2004 SIW-4 - IP in Space Implementation Guide 1 Handbook for Using IP Protocols for Space Missions James Rash - NASA/GSFC Keith Hogie, Ed Criscuolo,
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
THEMIS FDMO Review Management Topics − 1 October 5, 2004 Management Topics Manfred Bester.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
Supernova/Acceleration Probe (SNAP) Mission/Science Operations Irene Bibyk Tim Rykowski Bob Schweiss June 28, 2001.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
1 U.S. Department of the Interior U.S. Geological Survey June 22, 2009 Landsat Data Gap Readiness Plan Briefing to Landsat Science Team Rochester, New.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
NOAA Science Week – Kansas City, MO. 30 April 2012 Non Export-Controlled Information GOES-R – System Validation and User Readiness Planning Stephen D.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Request for Service (RFS) Process and Metrics Update June 24, 2008.
KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member Mr. David Hancock, Science Software Development.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
LANCE Processing at the AMSR-E SIPS Presented by Kathryn Regner Information Technology and Systems Center at the University of Alabama in Huntsville Joint.
First Flight: Successful Use of a High Rate LDPC Code With High Data Rate in a Restricted Band H. Garon, V. Sank, W. Fong NASA/GSFC Spring Technical Meeting,
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
March 2004 At A Glance ITPS is a flexible and complete trending and plotting solution which provides user access to an entire mission full-resolution spacecraft.
SPDF Science Advisory Group - September 29-30, 2005 Page 12/24/2016 9:09:48 PM Services of the Space Physics Data Facility (SPDF) / Sun-Earth Connection.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
NOAA Transition to New Direct Readout Systems for JPSS Presented to CGMS-44 Working Group 1, agenda item 3.2.
JSOC Status at SDO PSR-1 January 21-22, 2009 GSFC
I&T&C Organization Chart
Software and Systems Integration
GLAST Large Area Telescope:
Current SOC-Ground System Integration Schedule (Jan )
SDO Flight Dynamics Subsystem
Launch and On-orbit Checkout
Outline CLASS - Introduction GOES-R Data Products Baseline Option 2
Integration & Test Instrument Operations Coordination
Presentation transcript:

U.S. Department of the Interior U.S. Geological Survey LDCM Ground System Update Jim Nelson U.S. Geological Survey – LDCM Ground System Manager August 16, 2011

U.S. Department of the Interior 2 LST Summer 2011 – Sioux Falls, SD Agenda  USGS and GS/Ops Organization  GS Operational Architecture  GS Schedule  GS Development Progress  GS I&T Progress  End to End Science Data Testing  Mission Operations Progress

U.S. Department of the Interior 3 LST Summer 2011 – Sioux Falls, SD USGS LDCM Project Organization

U.S. Department of the Interior 4 LST Summer 2011 – Sioux Falls, SD Integrated NASA/USGS GS/Ops Team

U.S. Department of the Interior 5 LST Summer 2011 – Sioux Falls, SD GS Operational Architecture

U.S. Department of the Interior 6 LST Summer 2011 – Sioux Falls, SD Ground System Development Approach ElementCapabilityAgency / Developer Approach Mission Ops CenterServes as control center for mission operations performed by the FOT Hosts the MOE, CAPE, and other operations tools NASA / MOMSMinor mods to HSM MOC, GSFC B3/14 Mission Ops ElementPerforms command encryption and commanding, RT telemetry monitoring, mission planning and scheduling, monitoring and analysis, flight dynamics, and onboard memory management and mission data accounting NASA / The Hammers Co., Inc. COTS customization Collection Activity Planning Element Generates instrument image collection schedules based on science priorities USGS / SGTGOTS customization Ground Network Element Performs S-band communication for S/C commanding and HK telemetry receipt Receives S/C mission data via X-band Routes HK telemetry to MOC and mission data to the DPAS USGS / SGT, NOAA, KSAT Modification of existing stations Data Processing and Archive System Performs mission data ingest, product generation, and image assessment Provides storage and archive services Provides web interface for data discovery, product selection and ordering, and product distribution USGS / SGTCustomization of heritage systems NASA institutional services (SN, NEN, NISN, FDF) Performs S-band communication for S/C commanding and HK telemetry receipt Provides network connectivity across GS Supports post-launch FD NASAExisting systems and services acquired through PSLA

U.S. Department of the Interior 7 LST Summer 2011 – Sioux Falls, SD Ground System Schedule

U.S. Department of the Interior 8 LST Summer 2011 – Sioux Falls, SD MOC Progress  MOE Status  MOE Build 4.0 site verification testing is underway (last major delivery) Adding software patches to support ground system and mission-level testing as well as address issues found during development  MOE Build delivered and installation underway in MOC  MOE team developing/delivering emergency patches to resolve problems identified in testing as needed  Backup MOE will be integrated into the backup MOC (BMOC) in the fall of 2011  Launch Support Room (LSR) equipment was delivered in May  CAPE Status  Build 2.2 delivered; install in the MOC planned for next week (last major delivery)  Build 3.0 in work (upgrades to modeling and schedule engine)  MOC Integration Status  S/OS delivery and installation in the MOC completed  Network connections between MOC and stations complete  Establishing connectivity and interfaces with Launch Site  BMOC facility in place (shared location with L5/L7 MOC)  LSR facility being prepared for integration in the fall of 2011

U.S. Department of the Interior 9 LST Summer 2011 – Sioux Falls, SD GNE / RF Progress  DCRS completed and installed at all stations (last major release)  LGS (Sioux Falls, SD)  Operational  SvalSat (Svalbard, Norway)  All station and GNE testing complete  Station accepted June 2011  GLC (Fairbanks, Alaska)  Integration and unit test complete  Lingering issues with NOAA acceptance of station due to building move  Level 3 testing with the MOC has been delayed until November, following MRT 1  RF compat test planned for September 2011  Verification of S-band and X-band RF interfaces with the spacecraft  Will be using ground station RF equipment in the NASA Compatibility Test Van (CTV) at Orbital facility GLC receivers only remaining equipment to integrate into the CTV

U.S. Department of the Interior 10 LST Summer 2011 – Sioux Falls, SD DPAS Progress  DPAS B1.0 (safeguard mission data)  Complete and installed in operations environment  DPAS B2.0 (generate L1 data)  Data format based on simulation test using spacecraft engineering model hardware  All subsystems delivered and installed in DPAS test environment User Portal R2.0 (browse and quality band generation) Image Assessment Subsystem (IAS) R1.0 (L1 product generation, image cal/val) Ingest R2.0 (L0Ra generation, BPF generation) Subsetter R2.0 (L0Rp data generation, user interface) Inventory R2.1 (inventory for mission data, L0R, and L1 data) MDS R1.0 (metrics gathering and reporting for volume, latency, and throughput) Storage & Archive R2.1 (permanent archive of mission data, internal/online caches for L0/L1)  DPAS B2.0 TRR scheduled for August 22 nd  DPAS B2.0 on schedule for September 2011 delivery to GS testing  DPAS B3.0 (full production)  Adds LPGS to the DPAS and IC interfaces to the User Portal  Data format includes TIRS data format updates and final ancillary data definition  Delivery to GS testing in late May 2012  DPAS B4.0 (post-launch closeout release)  Final release of DPAS for capabilities not required for launch or commissioning  Delivery to GS testing in January 2013

U.S. Department of the Interior 11 LST Summer 2011 – Sioux Falls, SD First L1T Out of DPAS

U.S. Department of the Interior 12 LST Summer 2011 – Sioux Falls, SD End-to-End Science Data Testing

U.S. Department of the Interior 13 LST Summer 2011 – Sioux Falls, SD Ground Readiness Test (GRT) Status GRT#DateDescriptionConfiguration GRT 17-9/10TLM/CMD (S-band) 1) MOC with LSIMSS 2) MOC to EROS station CTP across NISN interface GRT /10 Planning, Scheduling and Mission Data Management (MDM) 1) MOC with LSIMSS 2/3) MOC with remote access to Orbital hotbench and integrated X-band demodulator. 4) MOC with LGS GRT 33/11Maneuvers and Special Events MOC with softbench/FSW 4.0 GRT 4a5/11Safeguard Mission Data DPAS, GNE/DCRS NCT-S6/11Repeat GRT 1&2 portions for GLC MOC to SGS station CTP across NISN GRT 6a8/11MOC & Station Capstone/Clean-up MOC with S/OS (no TIRS simulator) 1, LGS 2 GRT 4b11/11DPAS Level 1 Processing DPAS, MOC, GNE/DCRS NCT-G11/11Repeat GRT 1&2 portions for GLC MOC to GLC station CTP across NISN GRT 52/12Contingency Operations MOC and bMOC failovers, rescheduling of contacts GRT 6b3/12MOC & Station Capstone/Clean-up MOC with full S/OS 1 AVT3/12Science Algorithm Verification DPAS and Cal/Val Toolkit GRT 4c6/12DPAS Capstone DPAS, MOC, GNE/DCRS 1 TIRS Sim to be integrated at MOC in winter 2011, GS testing will be completed then. 2 GRT 6a testing run in conjunction with MRT 1 dry run, but will delay MOC-station testing until after MRT 1 complete in progress future

U.S. Department of the Interior 14 LST Summer 2011 – Sioux Falls, SD GS/Ops Testing Schedule

U.S. Department of the Interior 15 LST Summer 2011 – Sioux Falls, SD Technical Performance Measures  Ground System performance is monitored through a set of TPMs  TPMs are monitored on a regular basis TPMRequirementPerformanceMargin LGN Contact Time 98 min/day133 min/day +36% Ingest and Processing Throughput 400 scenes/day890 scenes/day +123% Distribution Capacity Years scenes/day4,700 scenes/day +276% Distribution Capacity Years scenes/day4,725 scenes/day +35% End to End Latency 85% in 48 hrs85% in 12 hrs +75% Receiver Implementation Loss 3 dB2.3 dB +23%

U.S. Department of the Interior 16 LST Summer 2011 – Sioux Falls, SD Mission Operations Progress  Completed execution of MRT 0.5 on July 8  Final of the mission readiness interface tests (MRT 0.x)  Primary and Secondary Objectives met over a period of 12 hours  Full court press for MRT 1  Multiple TIMs held with the NASA/USGS/Orbital operations teams to iron out objectives  Dry runs each week for the next three weeks  Progress monitored with daily standups and weekly tag-ups with project  Procedure development closely coordinated with Orbital  MOC Day In The Life (DITL) preparations for use in GRT 6 and MRT 1  Also provides a routine, automated method of exercising the ground system prior to tests with spacecraft  FDS product generation now live  Getting other products, particularly mission data management, to work with the S/OS  Mission Simulations planning ongoing  Testing with simulators (S/OS & softbench) that can’t be performed on the spacecraft  Day in the life scenarios, operator training and certification  MOS plan in draft  Launch & Activation Timeline  Timeline updates with L&EO sequences defined in Spacecraft User’s Guide  Timeline Tool in procurement cycle

U.S. Department of the Interior 17 LST Summer 2011 – Sioux Falls, SD Summary and Next Steps  Ground System development is on track  Entering Observatory I&T and mission readiness test phase  RF compat testing in September 2011  GRT 6a/MRT 1 in August/September 2011  MOSs begin in Winter 2011  Focus turning to mission data testing and L1 production  DPAS B2.0/GRT 4b provides L1 processing capability  End to end image data testing using a combination of tests with flight hardware and simulators