Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.

Slides:



Advertisements
Similar presentations
1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
Advertisements

NGAO Systems Engineering Status Team Meeting #3 (Video) R. Dekany 13 December 2006.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
W. M. Keck Observatory’s Next Generation Adaptive Optics Preliminary Design & Path Forward Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
Low order wavefront sensor trade study Richard Clare NGAO meeting #4 January
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Trying to connect WBSs with people and phases Relevant questions to my work: How the realistic NGAO strategies will/should affect the work in progress?
Observing Operations Concept Document Elizabeth McGrath NGAO PD Team Meeting #6 March 19, 2009.
1 Laser Guide Star Wavefront Sensor Mini-Review 6/15/2015Richard Dekany 12/07/2009.
Functional Requirements Status and Plans Christopher Neyman W. M. Keck Observatory Viswa Velur California Institute of Technology Keck NGAO Team Meeting.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
NGAO Photometric Accuracy Budget Strategy Richard Dekany.
NGAO Instrumentation Cost Drivers and Cost Savings September 2008 Sean Adkins.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO interface control documents: Christopher Neyman W. M. Keck Observatory Keck NGAO PD phase Meeting #6 March 19, 2007 Videoconference.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
Don Gavel: Keck NGAO meeting April 25, Keck NGAO Project Replan: AO and Laser Systems Donald Gavel NGAO Team Meeting 6 April 25, 2007.
Agenda (Fri., June 7) 8:00AO UI Demonstration 9:00Introductions to AO team 9:05AOWG Chair Selection 9:15Review Agenda (make changes?) 9:20Review Planned.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #10) Sept 17 th, 2007.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory Viswa Velur California Institute of Technology Keck.
NGAO High-Contrast Performance Budget (WBS aka Companion Sensitivity) Initial WFE budget and status report NGAO Team meeting #4, WMKO Kamuela.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Trying to connect WBSs with people and phases Relevant questions to my work: How the re 8 -planning will affect the work in progress? Priorities to capture.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Telescope Errors for NGAO Christopher Neyman & Ralf Flicker W. M. Keck Observatory Keck NGAO Team Meeting #4 January 22, 2007 Hualalai Conference Room,
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
MCAO Adaptive Optics Module Mechanical Design Eric James.
C. Executive Summary Phil Hinz Principal Investigator.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
The Active Optics System S. Thomas and the AO team.
VLT Laser Guide Star Facility Recovery DBO - ESO Status Overview – CfAO meeting 26 March 2007 ESO: E. Allaert, C. Araujo, G.Avila, D.Bonaccini Calia, E.Brunetto,
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Keck Precision Adaptive Optics Authors: Christopher Neyman 1, Richard Dekany 2, Mitchell Troy 3 and Peter Wizinowich 1. 1 W.M. Keck Observatory, 2 California.
Introduction of RAVEN Subaru Future Instrument Workshop Shin Oya (Subaru Telescope) Mitaka Adaptive Optics Lab Subaru Telescope Astronomical.
Laser(s) for Keck Observatory’s Next Generation AO (NGAO) System
Launch and On-orbit Checkout
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Trade Study Report: Fixed vs. Variable LGS Asterism
HMI Top Level Requirements
Calibration Plan Chris Neyman W. M. Keck Observatory April 20, 2010.
Presentation transcript:

Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck NGAO Team Meeting #11 November 5, 2007 Videoconference

2 Outline Introduction Acquisition PSF camera Atmospheric monitor AO calibration, diagnostics, and metrology

3 AO operational tools Acquisition: cameras to boresight science, TTFA, and LGS sources Diagnostics: –Group of task related to AO quality assurance (QA) –All seek to answer the question: Is the data good –Assumptions: temperature, humidity, cleanliness, status These functions are part of AO enclosure and bench AO non real-time software –Assumptions: AO telemetry data Part of AO real-time software Overall team plans to: –Focus on requirements and interfaces –Detailed design in subsequent phases

4 Acquisition camera Lead, Team: Chris Neyman Status: –Conceptual design of the acquisition cameras including consideration of the location and optical interface –Neyman finished sensitivity (photon) budget for the acquisition cameras –Favor IR detector for LOWFS/deployable IFU –Separate LGS acquisition Integrate with LGS WFS in expedient way To do: –Finalize acquisition processing steps (flow chart level) Need to coordinate with operations teams (David LeMignant) –Finalize optical/mechanical interfaces

5 PSF Monitor Camera Lead, Team: Mathew Britton Status: –Draft requirements –Identified preferred location for camera –First cut at sensitivity and sky coverage: no show stoppers To do: –Focus on analysis of feasibility of technique –Delay other conceptual design work –Assumption, it is a small risk to add camera to design later –More of Mathew’s hours in November

6 Atmospheric Profiler Lead, Team: Mathew Britton Status: –Draft requirements assuming current MASS/DIMM acceptable To do: –Verify expected performance is sufficient –More of Mathew’s hours in November

7 Proposed AO diagnostic systems Integrated with AO ( ) –Radiometric calibration of instrument and AO focal planes –Astrometric calibration source –Point source simulator (NGS+LGS) –Turbulence simulator –Alignment and registration aides –Metrology Instrument and AO flexures, drifts, vibrations –“Observers” for parts of AO system Example: high speed interferometer looking at first DM

8 Diagnostics, Calibration, Metrology Lead, Team: Chris Neyman Status: Documented requirements for radiometric calibration sources, AO point source simulators, and atmospheric phase screens To Do: –Outline needed accuracy from wavefront error budget –Complete interfaces with AO non RTC and RTC control systems