Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.

Slides:



Advertisements
Similar presentations
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Advertisements

The Use of Small Coolers for Hydrogen and Helium Liquefaction
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
Proposal for Convection Absorber Test with Hydrogen at Fermilab Barry Norris Representing colleagues in BD/Cryogenics February 21, 2003.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MTA Cryostat & cooling loop design Christine Darve Fermilab/Beams Division/ Cryogenic Department/ Engineering and Design Group Preparation of the Mucool/MICE.
Cryogenic Facility for Mucool at Linac MUCOOL – MICE meeting Barry Norris, Engineer, Beams Division/Cryogenic Dept. Fermilab phone:
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Mucool Test Area Cryostat & cooling-loop design Christine Darve Fermilab/Beams Division/ Cryogenic Department/ Engineering and Design Group MuCool / MICE.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
Hall D Target System Review J. FochtmanSeptember 28,2011 Preliminary Design Work.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
LH2 Safety Issues for MICE 1.O2/LH2 separation 2.No Ignition sources near LH2 3.Adequate ventilation 4.Affects: Windows: absorbers and vacuum Primary and.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
Overview of the ESS Linac Cryogenic Distribution System
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
S A Griffiths CM42 June 2015 Electrical & Control.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
NPDG Liquid Hydrogen Target: Design and Safety Features
2 K Coldbox Safety and ESH
IT-4189 Supply and installation of a cryogenic distribution system
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
Teleconference ACS – FREIA 31st October 2017
(vertical cryostat, Gersemi)
Cryostat design Mechanical design: Thermal screens: Specifications:
2K Cold Box Process Design
Mathew C. Wright October 2016
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Status of Hydrogen System Development
SNS PPU Cryomodule Instrumentation
Schematic diagram of the cryogenic system
UPPSALA UNIVERSITY_GERSEMI PROJECT
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02

Content Process and Instrumentation Diagram  Gas Shed  Experimental Hall  Absorber cryostat Design  Cryostat  Safety requirements  HX He/LH2 Pump test  Description  Preliminary Results

Process and Instrumentation Diagram

Gas Shed Equipment: Gas H2 bottle Gas N2 bottle O2 adsorber Vacuum pump Flam. Gas detector ODH detector Pneumatic air supply sys.Instrumentation: Flowmeter Transducer Pressure Reg. Valve Safety Valve Manual Valve Excess flow Valve Pneumatic Valve Electrical Valve Check Valve Pressure Indicator Pressure Transducer

Experimental Hall Equipment: Roughing Vacuum pump Turbo Molecular pump Gas He Supply/Return Gas N2 Supply/Return Liq. N2 Supply/Return Vaporizer Flam. Gas detector ODH detector Pneumatic air supply sys.Instrumentation: Temperature Transducer Pressure Transducer and Indicator Flowmeter Indicator Heater Safety Valve Temperature Controlled Valve Pressure Reg. Valve Manual Valve Pneumatic Valve Electrical Valve Check Valve

Absorber Vacuum Vessel Equipment: Absorber He/H2 Heat Exchanger LH2 pump AC motor LH2 buffer Vacuum pump Thermal shield Pneumatic air supply sys.Instrumentation: Temperature Transducer Pressure Transducer Pressure Indicator Diff. Pressure Transducer Heater Safety Valve Manual Valve Pneumatic Valve Electrical Valve Check Valve

LH2 Absorber Cryostat design The Cryostat is defined as the containment vessel. Vacuum volume around the absorber: safety+reduce the heat load to be extracted by the cryoloop. Maximum Allowable Working Pressure =25 psid Absorber cryostat design: Absorber cryostat design: LH2 absorber in the 5 T Lab-G magnet bore Safety devices for the LH2 cryo-loop Provide LH2 cooling within the admissible pressure drop limit imposed by the pump LH2 circulation provided by pump Heat exchange with the helium to ensure a temperature gradient in the LH2 less than 3 degrees Connect the helium refrigeration Insertion in the Linac Test Area 5 Tesla lab-G magnet

LH2 Absorber Cryostat design LH2 absorber windows and manifold Shape of the 30 cm and 24 cm windows for the 2nd containment vessel

LH2 Absorber Cryostat design

The parallel plate is only indicative – The 3 parallel plates and controlled valve will permit to vent outside the experimental hall, and will be located at the end of the relief piping providing a volume equal to 1300 liters (52x25).

LH2 Absorber Cryostat design The parallel plate is only indicative – The 3 parallel plates and controlled valve will permit to vent outside the experimental hall, and will be located at the end of the relief piping providing a volume equal to 1300 liters (52x25). The LH2 supply is not shown. It will be a bayonet connection located here

LH2 Absorber Cryostat design The LH2 supply is not shown. It will be a bayonet connection located here

LH2 Absorber Cryostat design

Pump test - Overview Heater ImpellersPump and its housing Water Pump test set-up at E4R

Pump test – Preliminary results Preliminary conclusion Equivalent mass-flow in both forward and reverse mode No significant influence on pump efficient, for a DT of 22 K

Conclusions PID: To be finalized after Reviews  Internal Review by end August  General Review to plan Design:  Final Designs after Reviews  Final detail drawings by end of November 2002 (or after reviews) Water pump test:  More test to validate the results  Correlation with LH2  Error analysis  Correlation with measurement of DT during experiment