Trebuchet Design Project ENGR-5 Fall 2003 Professors Gary M. Litton and Michael Golanbari Matt Ritchie Hoan Cai Rong Srey Thienan Nguyentan.

Slides:



Advertisements
Similar presentations
BY: PATRICK LE ACE SHAIKH TREY BROWN DEVIN JUSTICE Going up?
Advertisements

ROBOT DYNAMICS. MOTORS supply the FORCE that the robot needs to move Rotational Force is called TORQUE The motor needs to supply force to wheels arms.
EDGE™ Copyright © 2007 Rochester Institute of Technology All rights reserved.. Design, Fabrication, and Testing of a Novel, Automated, Remotely Operated.
The Trebuchet Design Project By: Nick Hansen, Thomas Smith, Matt Borges & Emily Byers University of the Pacific School of Engineering.
University of the Pacific1 PFADS Project Team P.O.C. Gavin Saito Miguel Perez Michael Bruch December 5, 2002 University of the Pacific Introduction to.
1 PFADS Design Project Team Whitey Ryan Sellman Jason Marks Toby Taylor University of the Pacific 3601 Pacific Ave. Stockton, CA
21st Century Pacific Students Construct A Great Launcher of Siege Assembled by: See Yang Hans Roelle Nicole Solari Rim Madani (Thursday 4-6) December 04,
1 TREDS The Hard Boilers: Chris Chapman Megan Kalend See Vang ENGR 5 University of the Pacific.
The Pacific Launchers1 Parabolic Food Aid Delivery System (PFADS) The Pacific Launchers Ryan Liu & Michael Nguyen University of the Pacific ENGR 5 December.
Team D.A.N.K. TREDS Design November 29, Pacific Ave. Stockton, CA Travis Damaso Scott Akers Zachary Kimura Nick Nelson.
Parabolic Hacky Sack Launch Mechanism Kristin Hans Khalid Al Mehairi Mark Quijano Jonathan Koehler The Bamboo Launchers School of Engineering University.
Team CRAB PFAD Design Presentation Alriel Gali Lab University of the Pacific - School of Engineering and Computer Science 3601 Pacific Ave.
Our Trebuchet Group: Adrian Hernandez, Randolph Noriega, Kristen Michaelis, and Shaan Barn Lab: Thurs 6-8pm.
Natasha Hyare Ryan Benson Casey Carlin
Computer Guided Trebuchet Seth Katz Matt Leese. Overview  Trebuchet is a medieval siege weapon Throws a projectile by utilizing a counterweighted arm.
Hacky Sack Launch Mechanism By: Zachary Cowherd Wen Luu Keiichi McGuire.
By: Alexandro Perez Greg Desrosiers Laura Berg Tara Hodgetts.
University of the Pacific 1 Parabolic Food Aid Delivery System Mishari Al-Nahedh Chia Lee Lisa Mak December 5, 2002 Engineering 5 Section 6 University.
Group 3 Heavy Lift Cargo Plane
Trebuchet Design Project Presentation Team H.E.D. Huy Nguyen | Edward Lau | Daniel Vizcaino Lab Section Tuesday 4-6 PM.
TEAM FTP LAB 5 Project PFADS n Kyle Harris n Sang Huynh n Bhupinder Shergill n Eric Stolp.
DarkStar Catapult Michael Whitehead Vince Wong DarkStar Catapult ENGR 5 November 19, 2002.
Parabolic Food Aid Delivery System Manjaneeq Allison King Bader Asadallah University of the Pacific Stockton, CA 12/5/2002.
Team F.T.P. Bhubinder Shergill Kyle Harris Sang Huynh Eric Stolp ENGR. 5 LAB 5.
Trebuchet Team Members: Linda Hib, Charlene Obille, Hanh Phan, James Santos Lab: Thursday University of the Pacific School of Engineering and Computer.
Team JADS 1 The PFADS Competition Team JADS Sean McNary John Yoshimura ENGR 5 - Lab 5.
T r e b u c h e t By Jonathan Ching, Isaiah Lilly Karen Quach, Brain Westrick Lab: Wednesday 6-8 p.m.
Team JADS1 The PFADS Competition Team JADS David Rosenberry Adam Yee ENGR 5 - Lab 5.
The Creation of Hera “The Treb Tigers” Stacy Costello & Jennifer Shore oh, and the dudes too: Travis Ford & Kevin Petros University of the Pacific Engineering.
Solid Modeling Overview ENGR 1182 SolidWorks 01. Solid Modeling Simple Parts  Solid modeling uses simple steps in a computer program to create 3D rendering.
Trajectory ‘08 Dennis Papesh
W IND –2– H 2 O MECH 4010: Design I Group 12: Jeffrey Allen Daniel Barker Andrew Hildebrand Supervised by: Dr. Alex Kalamkarov Client: Dr. Graham Gagnon.
Spaghetti Bridges The Pasta Sensations! Take a look at some designs…….
World’s Tallest Tower Case Study #1 Northern Highlands Regional High School Applied Technology Department Real World Engineering List Design/Build Engineering.
Science Olympiad Summer Institute 1 Presented by Dennis Papesh
Work IN, Work OUT The Work/Energy Principle. Kinetic Energy KE depends on mass and velocity Work done on an object will change KE.
Trebuchet Basics Fritz R. Fiedler. Basic Sling Trebuchet.
Team E.B.4.H. Lil Woody. Team Members Remy Devoe Jordan Sprouse Jeff Dix Ryan Beeler.
TREBUCHET Report Grading. Trebuchet The report will included the following information: (1) a word processed document, size 12 font, doubled spaced, (2)
ENGR 211 Bridge Design Project
Levers A lever is a rigid bar that pivots (rotates) about a fixed point. Levers are used to change the magnitude, direction, or speed of forces that act.
TREBUCHET Report Grading. Trebuchet The report will included the following information: (1) a word processed document, size 12 font, doubled spaced, (2)
By: Jason Anna, Cody Beatty, Mark Brumbaugh, Dave Clapper, Trevor Helsley, Ben Zurilla.
Lisgar Trebuchet Contest ● Introduction ● History ● Physics ● Rules ● Plan ● Summary.
P.F.A.D.T.A.S.T.I.C. Parabolic Food Aid Delivery Team And Statistical Thaumaturgies Incorporating Calculus.
Roller Coaster Overview ENGR1182.  As part of the project in ENGR , your team will: Innovate, Design, Build, Document, Test a model roller coaster.
CONFIDENTIAL PRIVATE INFORMATION
FINAL PRESENTATION Western Michigan University Advisors:
Tech/ME 140: Unit 5 Lecture Mechanism Design: Introduction to Mechanisms, Synthesis Using Graphical Approach. Motion Analysis and Simulation: Animation.
Kyle Harris Sang Huynh Bhupinder Shergill Eric Stolp
Roller Coaster Overview
Stick Together & Civil Structures
MULTI TASK TREBUCHETS IT’S ALL ABOUT ENERGY!.
A Comparison of the Fire Performance of Prestressed Concrete Double T-beams using Design Provisions and SAFIR By: Nickolas Hatinger.
Welcome to engr 2301 ENGINEERING STATICS Your Instructor:
Fluid Power Challenge Suggested Workshop Lessons
Trebuchet Basics Fritz R. Fiedler.
Senior Project Portfolio Preparation
Motion and Energy Motion.
Sling’N Shoot Designed and made by: The members of USA Sling Shot Enterprise Austin Ford, Christian Waksmunski, and Will Conroy D-16 EF 152 Spring 2017,
Protective Crane Design
Stationary Balance Training Bicycle - P08001
The Liftanator By, Sam, Michael, And Mark.
Science Olympiad Summer Institute
MECH 3550 : Simulation & Visualization
Man Vs Pulley.
Ben Davis Matthew Golden Ronak Patel Trey Field
Gravity Vehicle San Diego Regional.
Presentation transcript:

Trebuchet Design Project ENGR-5 Fall 2003 Professors Gary M. Litton and Michael Golanbari Matt Ritchie Hoan Cai Rong Srey Thienan Nguyentan

Overview  Problem Definition & Objectives Problem Definition & Objectives  Constraints and Criteria Constraints and Criteria  Calculations and Graphs Calculations and Graphs  Preliminary Design & Dimensions Preliminary Design & Dimensions  Analysis & Refinements Analysis & Refinements  Final Design Final Design  Competition Results Competition Results  Possible Improvements Possible Improvements  Conclusions Conclusions

Problem Definition & Objectives  Build a trebuchet that will hurl a Hacky Sack.  Distance, accuracy, and trebuchet weight will be incorporated into the final performance design score.  Other design elements (e.g., aesthetics, safety, written report and oral presentation quality) will be judged and combined with the performance score to determine the overall project grade.  Research the history and design features of the trebuchet, develop a design using a comprehensive computer analysis program, build a prototype and optimize it.  Score = flight distance (m) - centerline offset distance (m) - 3 * mass (kg)  Two firings permitted. Only the best hurl will count.

Constraints & Criteria  When fully assembled with the swing arm in a horizontal position, the entire trebuchet must fit within a 4 x 3 x 2.5 foot container.  There is no weight restriction, only a penalty.  The sole energy source shall be a provided 12-lb lead ball.  No other operator contact or intervention will be permitted once the trebuchet is aligned and loaded.  The trebuchet will be activated with the operator 10 ft from the side.  Trebuchet must be fully designed and constructed only by members of the team.  No Hazardous Materials may be used.  Testing of the trebuchet shall only be conducted on Hand Hall Lawn, Brookside Field, Zuckerman Field, or the sunken field during daylight hours.  Only Hacky Sacks may be hurled at any time.

Initial Calculations & Graphs

Preliminary Design and Dimensions We used WinTrebStar for our virtual simulations L1 = 1 foot. L2 = 2.9 feet L3 = 3 feet L4 =.5 feet L5 = 2.5 feet

Analysis and Refinements  Shortened sling  Refined sling release  Changed remote release mechanism  Moved pivot hole on the swing arm in order to optimize arm ratio.

Final Design

Final Design (continued) L1 = 1 foot. L2 = 2.9 feet L3 = 2.4 feet L4 =.2 feet L5 = 2.5 feet

Competition Results Distance: meters Offset:.61 meters Weight: 5.35 kilograms Final Score: -6.2

Possible Improvements  Use a bearing for the swing arm to rotate on. (Reduce friction)  Spend more time and effort on the release mechanism and sling release.  Use less wood on the base. (Reduce weight)

Conclusions  More time should be spent on the design and improvement of the sling than on anything else.  The release mechanism is very important. (Ours failed)  The point reduction for weight was crucial.  It’s good to go first on competition day. (It was pretty cold)