Lec 22, Ch.18, pp.503-512: Capacity & LOS (Objectives) Understand how critical lane groups and the sum of critical lane v/s rations are determined Learn.

Slides:



Advertisements
Similar presentations
Chapter 20: Basic principles of intersection signalization
Advertisements

Travel Time Estimation on Arterial Streets By Heng Wang, Transportation Analyst Houston-Galveston Area Council Dr. Antoine G Hobeika, Professor Virginia.
Special Topics: Overlaps By Michael P. Dixon, Ph.D.
Hcm 2010: roundabouts praveen edara, ph.d., p.e., PTOE
Chapter 18 of Business Dynamics
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
Lec 16, Ch16, pp : Intersection delay (Objectives)
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
Chapter 21: Fundamentals of Signal Timing and Design: Pretimed Signals
Vehicle Flow.
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
1Chapter 9-4e Chapter 9. Volume Studies & Characteristics Understand that measured volumes may not be true demands if not careful in data collection and.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Final Exam Tuesday, December 9 2:30 – 4:20 pm 121 Raitt Hall Open book
REVISION. Sample Question The sample questions for this year. Describe briefly the classic transport model, explaining the four stages of the model. [10]
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
INTRODUCTION TO TRANSPORT Lecture 4 Introduction to Transport Lecture 4: Signal Timing.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
Basic Principles of Intersection Signalisation
Lecture #6 Chapter 16: Principles of Intersection Signalization.
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
Unsignalized Intersections CTC-340. Hmwk At end of powerpoint.
Lec13, Ch.6, pp : Gap acceptance and Queuing Theory (Objectives)
Lec 15, Ch.8, pp : Signal Timing (Objective)
Chapter 241 Chapter 25: Analysis of Arterial Performance Know how arterial LOS is defined Be able to determine arterial classes Know how to determine arterial.
Introduction to Transport
PASSER II SOFTWARE.
Signals. Laneage Coding Examples.
Lecture #7 Chapter 16: Principles of Intersection Signalization (cont.)
Lec 19, Ch.17, pp : Sample simple timing problems (Objectives) Master the steps of simple signal timing through 4 sample problems in the textbook.
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Lecture #15 Actuated Signals: Chapter 19. Objectives Understand the benefits of actuated signals Understand the basic parameters Application in a coordinated.
Analyses of Unsignalized Intersections
Lec 20, Ch.18, pp : Analysis of signalized intersections, HCM (Objectives) Understand the conceptual framework for the HCM 2000 method Understand.
Chapter 17: Basic principles of intersection signalization (objectives) Chapter objectives: By the end of this chapter the student will be able to: Explain.
Lecture #11 Signal Coordination: Chapter 22. Objectives Factors affecting coordination Basic theory of signal coordination Application to arterial progression.
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
Signalized Intersections
Transportation Engineering
Transportation Engineering
Transportation Engineering
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
Intersection Control/ Signal Timing for Different Color Indications
CEE 320 Fall 2008 Course Logistics HW7 due today (9 total) Midterm next Friday (Wednesday review) Signalized Intersections (Chapter 7 of text) Last material.
Chapter 21. Analysis of Signalized Intersections
Coordinated Operations, notes from the field Edward Fok Resource Center Operations Technical Service Team 2005 TRB Annual Meeting.
Detailed Intersection Modelling Based on Analysis of the Interaction of Conflicting Traffic Movements Edwin Hull, Billy Kwok September 2011.
Chapter 20: Actuated Signal Control and Detection
Signal Warrants. Slide 2 Signal Warrants  r2/part4/part4c.htm r2/part4/part4c.htm.
TRB Signal Timing Best Practices Workshop 2005 Isolated Actuation, plus The Dilemma Zone Dilemma Rick Denney Iteris.
Introduction to Transport
Vehicle Flow. Homework Ch 3 # 1,4, 7, 15 Vehicle Flow How do vehicles operate in the system –capacity –speed –headway –density.
Traffic Signal Timing Design Part I. Slide 2 Steps in Designing a Traffic Signal Timing Plan (1/2) 1. Determine lane configurations and lane volumes 2.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
Queueing System Provide a mean to estimate important measures of Highway Performance Travel time Speed Affects Roadway Design Required left-turn bay length.
Problem 4: Okeechobee Road Stopped Control Analysis.
CEE 764 – Fall 2010 Topic 6 Delay and Offset Delay and Offset.
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
1 CEE 8207 Summer 2013 L#6 Queue. 2 Queueing System Provide a mean to estimate important measures of Highway Performance  Travel time  Speed Affects.
INTERSECTION MODEL COMPONENTS TTE 6815 K. Courage.
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
2a. Fully actuated signal - Improved T intersection
Signalized Intersections
Signalized Intersections
Highway capacity and Level of Service Analysis
Signal Timing: Putting it All Together
1. Sketch the flow profile diagram and the cumulative vehicle diagram
Transportation Engineering Calculating Signal Delay February 23, 2011
Signal Design CTC-340.
Presentation transcript:

Lec 22, Ch.18, pp : Capacity & LOS (Objectives) Understand how critical lane groups and the sum of critical lane v/s rations are determined Learn how to modify signal timing based on v/s ratios Know the components of delays modes for standard cases Know how delays for protected plus permitted phasing from exclusive LT lane groups are estimated

What we discuss in class today… Steps for determining critical lane groups and the sum of critical lane v/s ratios Method to determine lane group capacities and v/c ratios Method to modify signal timing based on v/s rations Delay models for standard cases Delay models for protected plus permitted phasing from exclusive LT lane groups Issues relating to the analysis of actuated signals

HCM-way of determining lane groups and the sum of critical lane group v/s ratios In a simple signal timing method, critical lane groups were determined by comparing adjusted per lane flows in each lane group using a ring diagram. In the 2000 HCM, per-lane flows cannot be compared because we have lane group flows. So, we use v/s ratios to determine critical lane groups. Once the v/s is computed (the outcomes of Module 2 and 3 of the 2000 HCM), v/s is used to determine critical lane groups and a ring diagram is again used.

Example of finding critical lane groups using v/s ratios (p.504) t L takes place.

Example of finding critical lane groups using v/s ratios (p.504) – cont. This indicates the proportion of real time that must be devoted to effective green. In this case 90% of the cycle. Conversely, 1 – 0.9 = 0.1 is available for lost times. Hence in this example, In general,Webster model,

Determining lane group capacities and v/c ratios Determining lane group capacities and v/c ratios is straight forward. Capacity for lane group i : v/c ratio for lane group i, X: The critical v/c ratio for the intersection can be found using Equation 18-4 in page 470: Note that

Modifying signal timing based on v/s ratios After v/s ratios are computed, we may need to make adjustments – either reallocation of green time, modifying cycle length, or modifying the intersection layout. For the first two cases, v/s rations can be used to reduce the amount of trial-and-error computations. First, we solve Eq for C: When Xc = 1.0, it is like C equation for simple signal timing. Suppose sum(v/s) = 0.9, and we desire to achieve X c = What would be the cycle length to achieve this for the problem in Figure 18-18? X c = 0.95 cannot be achieved in this case. C = 171 sec is too long.

Modifying signal timing based on v/s ratios (cont) C needs to be contained within the common cycle lengths. Typically C = 120 sec is the maximum cycle length accepted. Hence, Where, g i = C – L. With sum(v/s) = 0.90 and C = 120 sec, Xc = is the minimum that can be achieved. Once C is determined, we can compute new effective greens,then new actual greens for the next trial-and-error analysis.

LOS module This is the last step—estimating average individual stopped delays for each lane group. 1. Delay models for standard cases (for permitted or protected or compound phasing phasing from a shared lane group): (Eq. F16.1, p )

LOS module (cont) 2. Delay models for protected plus permitted phasing from exclusive LT lane groups “it should be noted that compound phasing is not generally used when more than one exclusive lane is present.”  What this confusing statement wants to say is “when double exclusive LT lanes exist, compound phasing is not used. Protected LT phase is always used for double exclusive LT arrangement for safety.” The effect of compound phasing applies only to the uniform delay component. It is adjusted to reflect varying arrival and departure patterns. Five different cases may arise as you see in the next slide.

Case 1 Case 2 Case 3 Leading LT phaseLagging LT phase Case 4 Case 5 Protected Permitted

Determining the case q a = approach flow rate, vph Total approach volumes during r + g Capacity (max service flow during g)

Uniform delay formulas rg qaqa spsp Total arrival volume during a cycle (because we are computing average control delay per vehicle) QaQa q a g s p g Note that this g and g u do not have to be their interval values. Simply, they are the time needed to clear the queues. Area = total delay (veh.sec) d 1 = [0.5/

A close look at the delay for Case 1 Note that the delay computed from this diagram is approach delay. Divide it by 1.3 to get stopped delay. tctc A B A Area = (1/2)rQ a B To find the area of B, we need to find t c. s p *t c = Q a + q a *t c t c = Q a /(s p – q a ) Area = (1/2)Q a *Q a /(s p – q a ) = (1/2)Q a 2 /(s p – q a ) Hence, 0.38r Q a Hence, 0.38Q a 2 /(s p – q a )

Numerical example for multiple time periods See page in Appendix F Use the overhead projector…