Inventory Models Production Lot Size Models. PRODUCTION LOT SIZE MODELS In a production lot size model, we are a manufacturer, trying to determine how.

Slides:



Advertisements
Similar presentations
Statistical Inventory control models I
Advertisements

Module C6 Other EOQ Type Models.
Inventory Modeling Concepts
Inventory Models Planned Shortage Models. PLANNED SHORTAGE MODEL Assumes no customers will be lost because of stockouts Instantaneous reordering –This.
Inventory Management for Independent Demand Chapter 12, Part 2.
Inventory Control Chapter 17 2.
INVENTORY MODELING Service Levels. DETERMINING A REORDER POINT, r* (With Safety Stock) Suppose lead time is 8 working days The company operates 260 days.
DOM 511 Inventory Control 2.
3/7: Inventory Planning & Control
IES 303 Chapter 15: Inventory Management Supplement E
Inventory Control IME 451, Lecture 3.
Chapter 11, Part A Inventory Models: Deterministic Demand
1 Inventory Models. 2 Overview of Inventory Issues Proper control of inventory is crucial to the success of an enterprise. Typical inventory problems.
Inventory models Nur Aini Masruroh. Outline  Introduction  Deterministic model  Probabilistic model.
Chapter 9 Inventory Management.
Inventory Control Models
FOR INDEPENDENT DEMAND
Inventory Models Quantity Discount Models. TYPES OF QUANTITY DISCOUNT MODELS Quantity Discount Models are of two types –All Units Discounts Above a certain.
1 Material Management Class Note # 3-A ( In review ) ~ Inventory control, analysis, and management ~ Prof. Yuan-Shyi Peter Chiu Feb
Lecture 5 Project Management Chapter 17.
Operations Management Inventory Management Chapter 12 - Part 2
Inventory Models Planned Shortage Models. PLANNED SHORTAGE MODEL Assumes no customers will be lost because of stockouts Instantaneous reordering –This.
Inventory Management Ross L. Fink.
Production Lot Size Models
INVENTORY MODELING Items in inventory in a store Items waiting to be shipped Employees in a firm Computer information in computer files Etc.
© 2003 Anita Lee-Post Inventory management Part 3 By Anita Lee-Post.
Module C5 Reorder Point/Service Levels. DETERMINING A REORDER POINT, r* (Without Safety Stock) Suppose lead time is 8 working days The company operates.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 12 Inventory Management.
Operations Management
INVENTORY MODELING Basic Concepts. INVENTORY MODELING What is inventory? Items in inventory in a store Manufactured items waiting to be shipped Employees.
Inventory Management for Independent Demand
Chapter 12: Inventory Control Models
OPSM 301 Operations Management Class 15: Inventory Management EOQ Model Koç University Zeynep Aksin
1 Inventory Control: Part 2 - Lot-Size Inventories.
___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Inventory Models EOQ Model with.
BA 301 Operations Management Spring 2003 Inventory Management Chapter 12 Continued.
EOQ Model Cost Curves Q* D 2 D Co EOQ, Q* = Ch
Inventory Management.
13-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
12 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Importance of Inventory One of the most expensive assets of many companies Can be 50%
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
1 Inventory Theory The Management of Idle Resources A quantity of commodity held for some time to satisfy some future demand.
Inventory Inventory is the stock of goods, commodities or other economic resources that are stored for the smooth and efficient running of a business.
Inventory Stock of items held to meet future demand
Economic Order Quantity The economic order quantity (EOQ) is the fixed order quantity (Q) that minimizes the total annual costs of placing orders and holding.
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Inventory Control Model
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 19 1.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
CDAE Class 26 Dec. 5 Last class: 5. Inventory analysis and applications Today: Problem set 5 5. Inventory analysis and applications Quiz 7 Class.
Global SCM Optimize monthly inventory level of central warehouse, consider previous month demand SONG YUN HO Term paper progress.
 1. PURCHASE COST.  2. CAPITAL COST.  3. ORDERING COST.  4. INVENTORY CARRING COST.  5. SHORTAGE COST.
Lecture 26 Order Quantities (Revisited)
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 18 1.
The Economic Production Quantity (EPQ) Model
A quick introduction.  What is it?  Why maintain inventory?  Why minimize inventory?
Chapter 17 Inventory Control
Week 14 September 7, 2005 Learning Objectives:
REORDER QUANTITY METHODS AND EOQ
PENGENDALIAN PERSEDIAAN (Bagian 2)
Inventory Stock of items held to meet future demand
Example ( In terms of Percentage)
How much to purchase? How much to produce?
BUSI 104 Operations Management
Lecture 23 Order Quantities
EOQ Model 2/26/2016.
Key Inventory Terms Lead time: Holding (carrying) costs:
EOQ for Production not Order (EPQ)
EOQ Inventory Management
Inventory Stock of items held to meet future demand
Presentation transcript:

Inventory Models Production Lot Size Models

PRODUCTION LOT SIZE MODELS In a production lot size model, we are a manufacturer, trying to determine how much to produce (the production lot size) during each production run. Like the EOQ model with Q = the production lot size except: –We are producing at a rate P/yr. that is greater than the demand rate of D/yr. Otherwise run process continuously and sell items as fast as they are produced –Inventory does not “jump” to Q but builds up to a value I MAX that is reached when production is ceased

What is the maximum inventory and the average inventory per cycle? Length of a production run = Q/P During a production run –Amount Produced = Q –Amount Demanded = D(Q/P) I MAX = Q - D(Q/P) = (1-D/P)Q Average inventory = I MAX /2 = ((1-D/P)/2)Q

PRODUCTION LOT SIZE -- TOTAL ANNUAL COST Q = The production lot size C O = Set-up cost rather than order cost =$/setup Number of Set-ups per year = D/Q Average Inventory = ((1-D/P)/2)Q Instantaneous set-up time/infinite time horizon TC(Q) = C O (D/Q) + C h ((1-D/P)/2)Q + CD

OPTIMAL PRODUCTION LOT SIZE, Q* TC(Q) = C O (D/Q) + C h ((1-D/P)/2)Q + CD

EXAMPLE-- Farah Cosmetics Production Capacity 1000 tubes/hr. Daily Demand 1680 tubes Production cost $0.50/tube (C = 0.50) Set-up cost $150 per set-up (C O = 150) Holding Cost rate: 40% (C h =.4(.50) =.20) Since demand is 1680 per day and the production rate is 1000 per hour: –D = 1680(365) = 613,200 –P = 1000(24)(365) = 8,760,000

OPTIMAL PRODUCTION LOT SIZE

TOTAL ANNUAL COST TOTAL ANNUAL COST = TC(Q) = TV(Q) + CD TV(Q) TV(Q) = C O (D/Q) + C h ((1-D/P)/2)Q = (150)(613,200/31,449) +.2((1-(613,200/8,760,000))(31,449)/2) = $5,850 TC(Q) TC(Q) = TV(Q) + CD = $312,450 5, (613,200) = $312,450

OTHER QUANTITES Length of a Production runLength of a Production run = Q*/P = 31,449/8,760,000 =.00359yrs. =.00359(365) 1.31 days = 1.31 days Length of a Production cycleLength of a Production cycle = Q*/D = days 31,449/613,200 = yrs. = (365) = days # of Production runs/yr.19.5# of Production runs/yr. = D/Q* = 19.5 I MAX 29,248I MAX = (1-(613,200/8,760,000))(31,449) = 29,248

REORDER (SETUP) POINT ANALYSIS The reorder point (actually the setup point) and safety stock determination are not affected by the calculation of Q*. It is found in the same way as before: –r* = LD + SS if demand is constant over lead time –r* is found using service levels if demand varies during lead time

Using the Template Production Lot Size Worksheet Enter Parameters Optimal Values

Review Production Lot Size Models find the amount to produce per production run P > D, else optimal solution is to run machine continuously Same as EOQ except I MAX = Q(1-D/P) Length of a production run = Q*/P Length of the production cycle = Q*/D Reorder (setup) point analysis is not affected. Use of template