LIGO-G020407-00-W Summary of S1 at LIGO Hanford Observatory Fred Raab 9 September 02.

Slides:



Advertisements
Similar presentations
For the Collaboration GWDAW 2005 Status of inspiral search in C6 and C7 Virgo data Frédérique MARION.
Advertisements

Calibration of the gravitational wave signal in the LIGO detectors Gabriela Gonzalez (LSU), Mike Landry (LIGO-LHO), Patrick Sutton (PSU) with the calibration.
E3/E4 Line Noise Investigation LIGO-G Z Sergey Klimenko Soma Mukherjee Bernard Whiting Bob Coldwell August 15, 2001 Outline  LLO line noise (E4.
LIGO-G W Earth Tide Investigations Fred Raab LIGO Hanford Observatory August 15, 2001 PredictionFeedforward 30.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Annual Review 30 April 2001 Caltech.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G W LHO Status Fred Raab 8/5/02. LIGO-G W Raab - LHO Status Both Interferometers Lock Nicely Last 4 days are typical:
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
LIGO-G W Lessons Learned From E7 at LIGO Hanford Observatory Fred Raab Daniel Sigg.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G9900XX-00-M LIGO Status and Plans Barry Barish 5 June 2000 Gravitational Waves: A Challenge to Theoretical Astrophysics Trieste, 5-9 June 2000.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
Future evolution of LHO EPO
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
LIGO-G W Report on LIGO Science Run S4 Fred Raab On behalf of LIGO Scientific Collaboration.
LIGO-G W Where Did the LSC Signals Come From? Fred Raab 27 June 02.
LIGO-G W Commissioning Data on Vibration Isolation & Suspensions Fred Raab 24 October 02.
LIGO-G D Commissioning PAC11, 2001 Daniel Sigg, LIGO Hanford Observatory.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G Z NSF Review LIGO Scientific Collaboration - University of Michigan 1 LSC Participation in Initial LIGO Detector Characterization.
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
LIGO-G Z Peter Shawhan, for the LIGO Scientific Collaboration APS Meeting April 25, 2006 Search for Gravitational Wave Bursts in Data from the.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
LIGO Scientific Collaboration1 LIGO-G Z S5 Report to the LSC Reported by Vern Sandberg LIGO Scientific Collaboration Meeting March 2006,
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
6. Results The accompanying histograms show the empirical PDF of z for each interferometer (H1, H2 at Hanford, WA; L1 at Livingston, LA). The green areas.
Data Quality Vetoes in LIGO S5 Searches for Gravitational Wave Transients Laura Cadonati (MIT) For the LIGO Scientific Collaboration LIGO-G Z.
1 Data quality and veto studies for the S4 burst search: Where do we stand? Alessandra Di Credico Syracuse University LSC Meeting, Ann Arbor (UM) June.
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
LIGO Commissioning Status
Status of GEO600 Benno Willke for the GEO600 team Aspen Meeting Aspen CO, January 2005 LIGO-G Z.
GEO600 Status Update Harald Lück Hannover, April 2005.
LIGO-G DM. Landry – Hanover LSC Meeting, August 18, 2003 LIGO S2 Calibration Michael Landry LIGO Hanford Observatory Representing the calibration.
LSC glitch group report Shourov K. Chatterji for the LSC glitch group LSC/Virgo meeting 2007 October 24 Hannover, Germany LIGO-G Z.
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
May 29, 2006 GWADW, Elba, May 27 - June 21 LIGO-G0200XX-00-M Data Quality Monitoring at LIGO John Zweizig LIGO / Caltech.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Operations Review 26 February 2001 LIGO Hanford Observatory.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
LIGO-G W “Astrowatch” at LIGO Hanford Observatory Fred Raab LIGO Hanford Observatory.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
LIGO-G E S2 Data Quality Investigation John Zweizig Caltech/LIGO.
LIGO-G W Interferometer and modecleaner transients during the E2 run Rauha Rahkola and Ray Frey University of Oregon Rick Savage LIGO Hanford.
Igor Yakushin, December 2004, GWDAW-9 LIGO-G Z Status of the untriggered burst search in S3 LIGO data Igor Yakushin (LIGO Livingston Observatory)
LIGO-G Z Report on E3/E4 Lock Losses K. Riles - University of Michigan 1 Report on E3/E4 Lock Losses David Chin, Dick Gustafson Keith.
LIGO-G Z Report on the S2 RunK. Riles / S. Whitcomb 1 Report on the S2 Run Keith Riles (University of Michigan) Stan Whitcomb (LIGO–Caltech)
Next Generation Low Frequency Control Systems
October 2006, LIGO Hanford Observatory
Reaching the Advanced LIGO Detector Design Sensitivity
Fred Raab, LIGO Hanford Observatory November 8, 2005
Gingin Advisory Committee Meeting 08 Dec 2009
Overview of E10 / S3 Hardware Injections
Report on the S2 Run Keith Riles (University of Michigan)
Hardware Injections in S4
Status of the LIGO Detectors
Status of LIGO Installation and Commissioning
Lock Acquisition Real and Simulated
Virgo Update – LSC meeting
Planning for the S4 Run Keith Riles (University of Michigan)
Improving LIGO’s stability and sensitivity: commissioning examples
Characterisation of the aLIGO monolithic suspensions
Calibration: S2 update, S3 preliminaries
LIGO Scientific Collaboration - University of Michigan
Presentation transcript:

LIGO-G W Summary of S1 at LIGO Hanford Observatory Fred Raab 9 September 02

LIGO-G W Raab - Summary of S1 at LHO2 Clean Science Duty Cycle (segments > 300 seconds) H1 “science” duty cycle ~ 58% H2 “science” duty cycle ~ 73% Longest locked section exceeded 21 hours on H1 Nearly 100 hours of LIGO triple coincidence science data

LIGO-G W Raab - Summary of S1 at LHO3 Arm Powers

LIGO-G W Raab - Summary of S1 at LHO4 Rocky Start H1 had rough time coming into lock for run »All-night marathon delivers locked H1, 1 hour before S1 start, but re-locking was problematical for 1 st week »Alignment did not seem to be an issue, since initial buildups of were typical when it locked, but did not ease difficulty »Once locked, IFO remained locked for very long times H1 noise had large sensitivity to NSPOB »Variations of ~5x, depending on NSPOB »Needed NSPOB ~ for good noise »Lock robustness required NSPOB > 150, so we would take IFO out of science mode for alignment tweak when NSPOB hit 200

LIGO-G W Raab - Summary of S1 at LHO5 Operational Issues Continuous calibration lines at ~ 38, 974 Hz were a challenge »Conlog monitored enabling of AWG channels, but not whether they have amplitude »LineMon was thought to be working, but gave unreliable amplitude info because of a programming bug that was found late in run »AutoCalibration script left amplitude of calibration lines set to zero SensMon was uninterpretable due to problems with calibration corrections Glitch monitors were largely quiet »Data was far less glitchy than E7, but documented monitors were ill-suited to characterizing less glitchy data »Need better pre-filtering before glitch-finding

LIGO-G W Raab - Summary of S1 at LHO6 ZGlitch Summary

LIGO-G W Raab - Summary of S1 at LHO7 Importance of On-line Analysis to Monitor Data Quality Apparently no event-rate discontinuity when “heartbeat” turned on

LIGO-G W Raab - Summary of S1 at LHO8 More Operational Issues CDS instability early in run due to GPS timing errors on H1 »Cured by running with doors open (default state prior to S1) and changes to timing configuration Non-linear steering found in H2:ETMx »Appears that there is instability in controller at certain coil currents Alignment swings observed in H1:MMT3 Some correlation of lock loss with single-bldg seismic transients »Local vibration source? Some lock loss correlation between H1 and H2 »EY seismic transient coincident with H1 lock loss »MY seismic transient coincident with H2 lock loss, 6 seconds later »EY transient coincident with turn-on of site water system well pump

LIGO-G W Raab - Summary of S1 at LHO9 Some Good News: Thermal Noise Observed in 1 st Violins on H2, L1 Almost good enough for tracking calibration.

LIGO-G W Raab - Summary of S1 at LHO10 Up Next… New digital controllers for H2 Software upgrades for H1 Install microseism upgrade Need water-system modifications Find the single-bldg vibration source Investigate noise correlations on ISC tables Improve Noise!