40m TAC, 10/13/05 1 Report to the 40m Technical Advisory Committee October 13, 2005 The 40m Team Ben Abbott, Rana Adhikari, Dan Busby, Jay Heefner, Osamu.

Slides:



Advertisements
Similar presentations
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) HOMODYNE AND HETERODYNE READOUT OF A SIGNAL- RECYCLED GRAVITATIONAL WAVE DETECTOR.
Advertisements

Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
Spring LSC 2001 LIGO-G W E2 Amplitude Calibration of the Hanford Recombined 2km IFO Michael Landry, LIGO Hanford Observatory Luca Matone, Benoit.
Marcus Ng Mentor: Alan Weinstein Co-mentor: Robert Ward
LIGO NSF review, 11/10/05 1 AdLIGO Optical configuration and control Nov 10, 2005 Alan Weinstein for AdLIGO Interferometer Sensing and Control (ISC) and.
LIGO NSF review, 11/10/05 1 AdLIGO Optical configuration and control Nov 10, 2005 Alan Weinstein for AdLIGO Interferometer Sensing and Control (ISC) and.
Optical Springs at the 40m 1 QND Workshop, Hannover Dec 14, 2005 Robert Ward for the 40m Team Osamu Miyakawa, Rana Adhikari, Matthew Evans, Benjamin Abbott,
Caltech 40m Current Issues University of Florida Kentaro Somiya.
Jan 29, 2007 LIGO Excomm, G R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.
40m TAC, 10/13/05 1 Report to the 40m Technical Advisory Committee February 9, 2006 The 40m Team Ben Abbott, Rana Adhikari, Dan Busby, Jay Heefner, Osamu.
LIGO- G05XXXX-00-R 40m meeting, May Experimental update from the 40m team 40m TAC meeting May 13, 2005 O. Miyakawa, Caltech and the 40m collaboration.
40m TAC, 10/13/05 1 Lock acquisition procedure towards detuned RSE Start with no DOFs controlled, all optics aligned. Re-align each 1.5 hours. ITMy ITMx.
40m Modeling and Experiment 1 Modeling the 40m QND Workshop, Hannover Dec 15, 2005 Robert Ward Seiji Kawamura, Osamu Miyakawa, Hiro Yamamoto, Matthew Evans,
Koji Arai – LIGO Laboratory / Caltech LIGO-G v1.
Jan 29, 2007 LIGO Excomm, G R 1 Status and Future of the Caltech 40m Lab Jan 29, 2007 the 40m team: Rana Adhikari, Ben Abbott, Rich Abbott, Rolf.
Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut.
40m Laboratory Progress Report LSC meeting at LIGO Hanford Observatory
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
LIGO- G R 40m Progress, LSC meeting, Aug m Laboratory Upgrade Progress Report Osamu Miyakawa, Caltech 40m Technical Advisory Committee.
LIGO-G R Aspen Current Status of the 40m Detuned RSE Prototype Seiji Kawamura 2004 Aspen Winter Conference on Gravitational Waves Gravitational.
Interferometer Control Matt Evans …talk mostly taken from…
Stefan Hild October 2007 LSC-Virgo meeting Hannover Interferometers with detuned arm cavaties.
LIGO- G R 40m Progress, LSC meeting, 3/031 40m Laboratory Upgrade Progress Report Osamu Miyakawa, Caltech 40m Technical Advisory Committee LIGO-G R.
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
Squeezed light and GEO600 Simon Chelkowski LSC Meeting, Hannover.
LIGO- G R Telecon on June, Mach-Zender interferometer to eliminate sidebands of sidebands for Advanced LIGO Osamu Miyakawa, Caltech.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 DC Readout Experiment at the Caltech 40m Laboratory Robert Ward Caltech Amaldi 7 July 14.
LIGO- G R Sensing and control, SPIE conference, June Sensing and control of the Advanced LIGO optical configuration SPIE conference at.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
LSC-March  LIGO End to End simulation  Lock acquisition design »How to increase the threshold velocity under realistic condition »Hanford 2k simulation.
LIGO- G R Aspen winter conference, January Toward the Advanced LIGO optical configuration investigated in 40meter prototype Aspen winter.
Robert Ward NAOJ seminar, March 1, The Caltech 40m Prototype Detuned RSE Interferometer Robert Ward NAOJ seminar March 1, 2006 Osamu Miyakawa, Rana.
LIGO- G R LIGO seminar, November Optical spring and optical resonance in the 40m Detuned RSE interferometer LIGO seminar November 1, 2005.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
LIGO- G R 40m Progress, LSC meeting, 8/021 40m Laboratory Upgrade Progress Report Dennis Ugolini, Caltech 40m Technical Advisory Committee LIGO-G R.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G R DC Detection at the 40m Lab Plans for DC Readout Experiment at the 40m Lab Alan Weinstein for the 40m Lab July 19, 2005 Ben Abbott, Rana.
Advanced LIGO Simulation, 6/1/06 Elba G E 1 ✦ LIGO I experience ✦ FP cavity : LIGO I vs AdvLIGO ✦ Simulation tools ✦ Time domain model Advanced.
LIGO- G R 40mAdvLIGO R&D program, 10/8/ Meter Lab program for AdvLIGO R&D Alan Weinstein, Caltech AdvLIGO R&D Technical Review, 10/8/02.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
LIGO- G R LSC meeting at LSU, August Caltech 40m Lab Update LSC meeting at LSU Aug 16, 2006 Robert Ward, Caltech and the 40m team: Rana.
Aligning Advanced Detectors L. Barsotti, M. Evans, P. Fritschel LIGO/MIT Understanding Detector Performance and Ground-Based Detector Designs LIGO-G
LIGO- G R 40m weekly meeting, Jan 05, Explore demodulation phase for DDM on 40m RSE prototype Osamu Miyakawa, Caltech LIGO-G R.
Jan 17th 2006Ward Candicacy1 Length Sensing and Control for an Advanced Gravitational Wave Detector Robert Ward PhD Candidacy Caltech, 17 Jan 2006.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
LIGO- G Z LSC meeting at Baton Rouge, March Caltech 40m Lab Update LSC Meeting Baton Rouge Mar 21, 2007 Robert Ward, Caltech and the 40m.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
LIGO- G R 40m/AdLIGO, LSC, August Issues in sensing and control of the 40m and Advanced LIGO optical configuration LSC meeting, August.
LIGO-G R DC Detection at the 40m Lab DC Detection Experiment at the 40m Lab Robert Ward for the 40m Lab to the AIC group Livingston LSC meeting.
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 Prototyping for eLIGO: Power Recycled Fabry Perot Michelson DARM RF ITMy ITMx BS PRM SRM.
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer. at the Caltech 40m interferometer. Yoichi Aso*, Rana Adhikari,
Main Interferometer Subsystem
Time domain simulation for a FP cavity with AdLIGO parameters on E2E
Main Interferometer Subsystem
Main Interferometer Subsystem
Demonstration of lock acquisition and optical response on
Time domain simulation for a FP cavity with AdLIGO parameters on E2E
Yoichi Aso on behalf of the LCGT ISC Group
Homodyne readout of an interferometer with Signal Recycling
Current Status of the 40m Detuned RSE Prototype
40m Laboratory Upgrade Progress Report
Effect of sideband of sideband on 40m and Advanced LIGO
Advanced LIGO optical configuration investigated in 40meter prototype
Estimation of each loop shot noise limit for AdLIGO
Progress report from 40m team for the Advanced LIGO
40m TAC Update October 2006 The 40m Team 11 April 2019 G I.
Presentation transcript:

40m TAC, 10/13/05 1 Report to the 40m Technical Advisory Committee October 13, 2005 The 40m Team Ben Abbott, Rana Adhikari, Dan Busby, Jay Heefner, Osamu Miyakawa, Mike Smith, Bob Taylor, Monica Varvella, Steve Vass, Rob Ward, Alan Weinstein with lots of help from: Matt Evans, Helena Armandula, Rolf Bork, Alex Ivanov, SURF students, etc…

40m TAC, 10/13/05 2 Status as of October 2005  Slides 3 through 11: presented at August LSC meeting, included for your review, skip for now.  Status of lock acquisition (Rob, Osamu, Matt, Rana)  e2e simulation (Monica)  DC readout (Smith, AJW, all)  Proposal for squeezing-enhanced gravitational wave interferometer at the 40m (Nergis)

40m TAC, 10/13/05 3 Caltech 40 meter prototype interferometer Objectives  Develop lock acquisition procedure of detuned Resonant Sideband Extraction (RSE) interferometer, as close as possible to AdLIGO optical design BS PRM SRM X arm Dark port Bright port Y arm  Characterize noise mechanisms  Verify optical spring and optical resonance  Develop DC readout scheme  Extrapolate to AdLIGO via simulation

40m TAC, 10/13/05 4 AdLIGO signal extraction scheme  Arm cavity signals are extracted from beat between carrier and f 1 or f 2.  Central part (Michelson, PRC, SRC) signals are extracted from beat between f 1 and f 2, not including arm cavity information. f1f1 -f 1 f2f2 -f 2 Carrier (Resonant on arms) Single demodulation Arm information Double demodulation Central part information  Mach-Zehnder installed to eliminate sidebands of sidebands.  Only + f 2 is resonant on SRC.  Unbalanced sidebands of +/-f 2 due to detuned SRC produce good error signal for Central part. ETMy ETMx ITMy ITMx BS PRM SRM 4km f2f2 f1f1

40m TAC, 10/13/ DOF for length control : L  =( L x  L y ) / 2 : L  = L x  L y : l  =( l x  l y ) / 2 =2.257m : l  = l x  l y = 0.451m : l s =( l sx  l sy ) / 2 =2.15m PortDem. Freq. LL LL ll ll l s SPf1f E-9-1.2E-3-1.3E-6-2.3E-6 APf2f2 -4.8E-911.2E-81.3E-3-1.7E-8 SP f1  f2f1  f2 -1.7E-3-3.0E E-2-1.0E-1 AP f1  f2f1  f2 -6.2E-41.5E-37.5E-117.1E-2 PO f1  f2f1  f2 3.6E-32.7E-34.6E-1-2.3E-21 Signal Extraction Matrix (in-lock) Common of arms Differential of arms Power recycling cavity Michelson Signal recycling cavity Laser ETMy ETMx ITMy ITMx BS PRM SRM SP AP PO lxlx lyly l sx l sy L x =38.55m Finesse=1235 L y =38.55m Finesse=1235 Phase Modulation f 1 =33MHz f 2 =166MHz T =7% G PR =14.5

40m TAC, 10/13/05 6 Differences between AdvLIGO and 40m prototype  100 times shorter cavity length  Arm cavity finesse at 40m chosen to be = to AdvLIGO ( = 1235 ) »Storage time is x100 shorter.  Control RF sidebands are 33/166 MHz instead of 9/180 MHz »Due to shorter PRC length, less signal separation.  LIGO-I 10-watt laser, negligible thermal effects »180W laser will be used in AdvLIGO.  Noisier seismic environment in town, smaller stack »~1x10 -6 m at 1Hz.  LIGO-I single pendulum suspensions are used »AdvLIGO will use triple (MC, BS, PRM, SRM) and quad (ITMs, ETMs) suspensions.

40m TAC, 10/13/05 7 DRMI lock using double demodulation with unbalanced sideband by detuned cavity August 2004  DRMI locked with carrier resonance (like GEO configuration) November 2004  DRMI locked with sideband resonance (Carrier is anti resonant preparing for RSE.) Carrier 33MHz Unbalanced 166MHz Belongs to next carrier Belongs to next carrier Carrier 33MHz 166MHz ITMy ITMx BS PRM SRM OSA DDM PD Typical lock acquisition time : ~10sec Longest lock : 2.5hour

40m TAC, 10/13/05 8 Lock acquisition procedure towards detuned RSE ITMy ITMx BS PRM SRM ETMx ETMy Shutter Carrier 33MHz 166MHz DRMI using DDM Off-resonant arms using DC lock (POX/TrX), (POY/TrY) SP166/PRC, AP166/PRC (POX/TrX) + (POY/TrY), (POX/TrX) – (POY/TrY) (TrX + TrY), (TrX – TrY) / (TrX + TrY) Ideas for arm control signal RSE Done In progress Done

40m TAC, 10/13/05 9 All 5 degrees of freedom under controlled with DC offset on L + loop Both arms locked with DRMI  Lock acquisition time ~1 min  Lasts ~ 20 min  Can be switched to common/differential control L- : AP166 with no offset L+ : Trx+Try with DC offset Yarm lock Xarm lock Arm power Error signal Ideal lock point Offset lock Have started trying to reduce offset from L+ loop But…

40m TAC, 10/13/05 10 Progress in last 6 months  For the last 6 months, we have been able to control all 5DOF, but with CARM offset.  Reducing the CARM offset has been made difficult by technical noise sources. We have spent last 6months reducing them; »suspension noise, vented to reduce couplings in ITMX »improved diagonalization of all suspensions »improved frequency noise with common mode servo »automation of alignment and lock acquisition procedures »improved DC signals and improved RF signals for lock acquisition.  We can now routinely lock all 5 DOFs in a few minutes at night.

40m TAC, 10/13/05 11 RSE peak! Optical gain of L- loop DARM_IN1/DARM_OUT divided by pendulum transfer function No offset on L- loop ~60pm offset on L+ loop Phase includes time delay of the digital system. Optical resonance of detuned RSE can be seen around the design RSE peak of 4kHz. Q of this peak is about 7. Effectively the same as Full RSE with GPR=1.4 with 1W input laser. Model was calculated by Thomas’s tool. We will be looking for optical spring peak. Design RSE peak ~ 4kHz

40m TAC, 10/13/05 12 Lock acquisition procedure towards detuned RSE Start with no DOFs controlled, all optics aligned. Re-align each 1.5 hours. ITMy ITMx BS PRM SRM SP DDM 13m MC 33MHz 166MHz SP33 SP166 AP DDM AP166 PO DDM

40m TAC, 10/13/05 13 Lock acquisition procedure towards detuned RSE DRMI + 2arms with offset ITMy ITMx BS PRM SRM SP DDM 13m MC 33MHz 166MHz SP33 SP166 AP DDM AP166 PO DDM Average wait : 1 minute (at night, with tickler) T =7% I Q 1/sqrt(TrY) 1/sqrt(TrX)

40m TAC, 10/13/05 14 Lock acquisition procedure towards detuned RSE Scripto-matic: ITMy ITMx BS PRM SRM SP DDM 13m MC 33MHz 166MHz SP33 SP166 AP DDM AP166 To DARM PO DDM AP166 / (TrX+TrY) CARM DARM + + Short DOFs -> DDM DARM -> RF signal CARM -> DC signal 1/sqrt(TrX)+ 1/sqrt( TrY) Discretionary: CARM -> Digital CM_MCL servo

40m TAC, 10/13/05 15 Lock acquisition procedure towards detuned RSE Reduce CARM offset: Go to higher ARM power, switch on AC-coupled analog CM_AO servo, using REFL DC as error signal. Locks somewhat stable at 85% of maximum power. ITMy ITMx BS PRM SRM SP DDM 13m MC 33MHz 166MHz SP33 SP166 AP DDM AP166 To DARM REFL DARM PO DDM AP166 / (TrX+TrY) G PR =5 Up next: RF control of CARM: REFL166 (POX/POY 33 ?)

40m TAC, 10/13/05 16 Ready for Transition to RF CARM

40m TAC, 10/13/05 17 Progress in last 2 months  Use CARM DC signal to creep closer to full arm resonance (signal goes away at resonance) »combined PRC and arm gain as high as 60, 85% of the way to peak, corresponding to offset of 8 pm, assuming arm losses of 200ppm (inferred).  Progress due largely to improvements in loop filtering, to obtain more gain and reduce noise  Significant improvements in automation of lock procedures.  All DOFs diagonalized: 3x3 (SRC/PRC/MICH) + 2x2 (DARM/CARM)  Lock is lost because of large frequency noise (presumably).  Effort to reduce frequency noise using CM servo »digital CM servo to MC works well »analog servo using DC signal seems to work, RF under development »frequency noise may be coming from in-vac PZTs. Not beam jitter noise.  Much effort to reduce other noise sources »better diagonalization of MC suspensions, core optics suspensions »continual battle with 60 Hz harmonics

40m TAC, 10/13/05 18 Development of e2e simulation: 4Om/AdvLIGO package  Monica Varvella (visitor from LAL/Orsay) has developed a 4Om/AdvLIGO package with a DRFPMI optical plant, and is developing the control plant with help from Matt Evans and Hiro Yamamoto  Tests include a careful comparison with Twiddle, as well as comparison of error signal sweeps between simulation and 40m data.  Can be used to extract the velocity of the mirrors in the 40m under controlled circumstances: lock all degrees of freedom, CARM offset, and then HOLD the CARM servo and watch error signal as mirrors sweep through arm resonance.

40m TAC, 10/13/05 19 Error signal sweeps at m/s for the 40m IFO obtained in E2E framework and compared with TWIDDLE predictions Example: AP 166 MHz TWIDDLE and E2E comparison e2e SIMULATION:4Om/AdvLIGO package TWIDDLE E2E

40m TAC, 10/13/05 20 e2e SIMULATION: 4Om/AdvLIGO package Comparison between real data (black) and e2e simulated data (red) of the transmitted light for both the arms (full IFO): the mirror velocities used in E2E simulation are the values obtained fitting the real data Real data have been used to estimate relative mirror velocity for both the arms: V xarm = (0.35 ± 0.13) μm/s V yarm = (0.26 ± 0.13) μm/s E2E real data Tr X Tr Y

40m TAC, 10/13/05 21 e2e SIMULATION: 4Om/AdvLIGO package Comparison between real data, e2e simulated data and the theoretical prediction V(t) of the SP error 166 MHz The τ and the velocity v is the value obtained fitting real data τ = 0.7 ms v = 0.26 μm/s V(t) ~ exp(t/τ) sin( a t 2 ) with a = (k v) / (2 T)

40m TAC, 10/13/05 22 DC Readout at the 40m  DC Readout eliminates several sources of technical noise (mainly due to the RF sidebands): –Oscillator phase noise –Effects of unstable recycling cavity. –The arm-filtered carrier light will serve as a heavily stabilized local oscillator. –Perfect spatial overlap of LO and GW signal at PD.  DC Readout has the potential for QND measurements, without major modifications to the IFO.  We may not be able to see shot noise at low frequency, given our noise environment. We may not even see any noise improvements, but we might!  The most important thing we will learn is : How to do it »How to lock it? »How best to control the DARM offset? »What are the unforeseen noise sources associated with an in-vacuum OMC? »How do we make a good in-vac photodiode? What unforeseen noise sources are associated with it?

40m TAC, 10/13/05 23 DC readout equipment  Most in-vac optics and opto-mechanics have been ordered »Most mirror mounts and mirrors »Output mode-matching telescope with picomotor focus »two Piezo-Jena steering mirrors »but NOT the PZT drivers. Jay Heefner has committed to designing these (also maybe needed at sites for RBS system). Design based on IO PZTs. Need strain gauge readback.  OMC design from Mike Smith »4-mirror design »super-mirrors with REO coatings coming from LIGO Lab spares  DC PD assembly and electronics under design (Abbott, Adhikari)  OMC control, DC PD readout, and monitoring electro-optics and readout, under design (Heefner), mostly using existing infrastructure and equipment.  Alignment on bench, in air, and in vacuum seem feasible.

40m TAC, 10/13/05 24 Output Optical Train Mike Smith SRM 1 st PZT steering mirror 2 nd PZT steering mirror gets a little tight around IMMT OOCIOC BSC

40m TAC, 10/13/05 25 Output Optic Chamber Mike Smith from SRM to AS RF beamline (roughly 1/3 of AS power) also a convenient path for autocollimator beam, for initial alignment in air to OMCR beamline to OMCT beamline from PSL to IMC IMCR, IMCT, and SP beamlines 2 nd PZT steering mirror PZT steering mirrors and their controls are duplicates of a pair that we have already installed and commissioned for steering from IMC to main IFO (in-vac); controls are fully implemented in the ASC system (by Rolf). Similar systems can be used for “LIGO I.V”. Piezosystem Jena PSH 5/2 SG-V, PZT tilting mirror mount with strain gauge, and associated drivers and power supplies Existing in-vac seismically isolated optical table (OOC) Mike Smith has designed a compact, monolithic MMT, similar to our input MMT, using spherical mirrors. 4-mirror monolithic OMC. Pair of DC PDs with in-vac electronics on monolithic base.

40m TAC, 10/13/05 26 OMC, four mirror design Mike Smith Mirrors mounted mechanically, on 3 points (no glue) curved mirror: off-the-shelf CVI laser mirror with ROC = 1 m ± 0.5% Fixed spacer should be rigid, vented, offset from table  OMC length signal:  Dither-lock? >> Should be simple; we’ll try this first.  PDH reflection? >> There’s only one sideband, but it will still work.  Servo:  Will proceed with a simple servo, using a signal generator and a lock-in amp.  Feedback filters can easily be analog or digital.  Can use a modified PMC servo board for analog.  Can use spare ADC/DAC channels in our front end IO processor for digital.  PZT actuation From MMT to DCPD PZT mirror SS fixed spacer ~ 20 cm reflected beam mechanical clamps (no glue)

40m TAC, 10/13/05 27 OMC design in SolidWorks  Small number of pieces  HV compatible »a bit of glue on the PZT mirror  Mirrors mounted mechanically, on silver washers (no glue)  ALGOR FEA: lowest mech resonance at ~770 Hz  Construct out of well-damped material, to minimize effect of resonances »Brass? Copper? »Or just stick with aluminum?  All high-quality (REO super- polished and coated) mirrors available from LIGO lab spares (well, the 4 th HR mirror, 0 o incidence, may need to come from Newport) Mike Smith

40m TAC, 10/13/05 28 In-vac DC photodiodes Three views of an in-vacuum DC PD assembly, showing a 50% beamsplitter, two photodiodes, a beam-dump, and a vacuum can to hold electronics. The base will not be made of marble. Electronics under design (Abbott, Adhikari) Ben Abbott