Materials Management BUS 3 – 141 Mr. Jess Marino Fall, 2007

Slides:



Advertisements
Similar presentations
Fundamentals of Operations Management BUS 3 – 140 Mr. Jess Marino Spring, 2008.
Advertisements

DPS 304 : Purchasing /Procurement Activities
The Office Procedures and Technology
The Acquisition / Payment Process
Revision A - 23 January 2009 Supply Chain Collaboration via iSupplier Portal & ERS (Evaluated Receipts Settlement)
Copyright Course Technology Chapter 11: Project Procurement Management.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
1 Chapter 3 Organizing The Purchasing Function IDIS 424 Spring 2004.
Purchasing Overview Purchasing Purchasing Activity
Materials Management BUS 3 – 141 Mr. Jess Marino Spring, 2011.
Fundamentals of Operations Management BUS 3 – 140 Mr. Jess Marino Fall, 2007.
Materials Management BUS 3 – 141 Mr. Jess Marino Spring, 2007.
Materials Management BUS 3 – 141 Ensuring Continuous Supply and Optimizing Inventory Levels Feb 11, 2008.
The Purchasing Process
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
Materials Management BUS 3 – 141 Ensuring Continuous Supply and Optimizing Inventory Levels February, 2011.
Supply Chain Management
Purchasing & SCM.
Materials Management BUS 3 – 141 Quality and Specification Leveraging Technical Excellence Week of Aug 31, 2010.
Materials Management BUS 3 – 141 Supplier Relations Week of Apr 23, 2007.
Materials Management BUS 3 – 141 Ensuring Continuous Supply and Optimizing Inventory Levels September, 2011.
Collecting and Reporting Accounting Information Design of an effective AIS begins by considering outputs from the system. Outputs of an AIS include: 1.
Materials Management BUS 3 – 141 Information Systems and Technology Week of Apr 2, 2007.
Introduction to SAP R/3.
Fundamentals of Operations Management BUS 3 – 140 Mr. Jess Marino Fall, 2011.
Accounting Information Systems 9th Edition
Materials and Suppliers – Strategic Procurement Richard Byrom Oracle Applications Consultant Enterprise Resource Planning Seminar – 24 th May 2002 Richard.
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.
5-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Purchasing.
Student Affairs Buying 101 Procurement Methods Students First Topic
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
The Purchasing Function
Supply Management Chapter 7.
Logistics.
Introduction Business Process Fundamentals
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
Materials Management (MM)
Kimball Bullington, Ph.D. - MGMT Materials Management Systems Purchasing Chapter 7.
Acct 316 Acct 316 Acct 316 The Expenditure Cycle: Purchasing and Cash Disbursements 12 UAA – ACCT 316 – Fall 2002 Accounting Information Systems Dr. Fred.
PUBLIC PURCHASING IN FLORIDA ROLES IN THE PURCHASING PROCESS (rev. 05/27/2008)
1 Grants Management (GM) Focus Monthly Accounting Reconciliation Process.
Chapter 20 Strategy in Purchasing and Supply Management.
1 CHAPTER 4 DEVELOPING A BUSINESS PLAN: BUDGETING.
Hall, Accounting Information Systems, 7e ©2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly.
Global Manufacturing and Supply Chain Management
0 Glencoe Accounting Unit 4 Chapter 15 Copyright © by The McGraw-Hill Companies, Inc. All rights reserved. Unit 4 The Accounting Cycle for a Merchandising.
Supply Processes and Technology
Oracle Services Procurement
O BJECTIVES To Explain purchasing and the aim of purchasing function. To find out purchasing stages. To find out purchasing cycle. To identify the responsibilities.
Future Research Leaders Program Module 5 Financial, Resource and Risk Management.
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Purchasing.
Chapter 7 Supply Management. Chapter Objectives Be able to:  Discuss the rise of global sourcing and the important financial and operational performance.
12-1 Anup Kumar Saha The Expenditure Cycle: Purchasing and Cash Disbursements.
12.1 Plan Procurement: Introduction
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 4 Supply Processes and Technology.
Chapter 4 The Revenue Cycle 1.
Intercompany Project Time and Expenses Scenario Overview
PURCHASING AND SUPPLY MANAGEMENT
Industrial Purchasing System A method used by businesses to buy products and/or services. A purchasing system manages the entire acquisition process, from.
Customer Contract Management Scenario Overview
Order-to-Cash (Project-Based Services) Scenario Overview
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Customer Contract Management Scenario Overview
Order-to-Cash (Project-Based Services) Scenario Overview
Accounting Information Systems and Business Processes - Part II
Accounting Information Systems and Business Processes - Part I
Purchasing Overview Purchasing Purchasing Activity
Presentation transcript:

Materials Management BUS 3 – 141 Mr. Jess Marino Fall, 2007

Agenda Introduction Green Sheet review and other administrative items Additional comments on the course Initial Lecture

Introduction

Marino Background Academics Supply Chain Experience Graduate in Production and Operations Management Product of CSU system (San Diego State) Developed and presented several courses as a Management Consultant Supply Chain Experience Over 25 years as a practitioner at all levels of responsibility Leadership in small and large organizations Many different hourly and professional jobs Over eight years as a Management Consultant Certified in Production and Operations Management by the Association for Operations Management (APICS) Exposure to many industries and organizations Have done business in 13 countries throughout the world

Director of Operations Director of Supply Chain Management Positions Held Director of Operations Director of Supply Chain Management Director of Materials Production Control Manager Executive Director of Fulfillment Production Supervisor Buyer Production Controller Material Controller Stockroom Manager Machine Operator Mail Room Clerk Production Expediter Warehouse Clerk

Have conducted Business in 13 Countries, Worldwide SCOTLAND CANADA ENGLAND HOLLAND FRANCE UNITED STATES CHINA TAIWAN MEXICO THAILAND HONG KONG SINGAPORE MALAYSIA

Green Sheet Review

Student Information Sheet NAME MAJOR (and Emphasis) BUS 3 – 140, 141, 142, 143, 144, 145, 146, 147 CURRENT JOB (Company Optional) PREVIOUS SUPPLY CHAIN JOBS / EXPEIRIENCE OTHER

Course Introduction

Highest Level Supply Chain Objective Revenue Utilization of Assets (People, Plant, Equip) Cash Inventory BALANCING keeping Customers completely satisfied and Resources optimally utilized ……. against spending the least amount of Cash and carrying the least amount of Inventory

Highest Level Materials Management Process Identify WHAT Items are Required Calculate HOW MUCH is Required Schedule WHEN they are Received & FROM WHOM At the LOWEST Total COST of Ownership With the Highest QUALITY and Reliability

How this Course supports Supply Chain Objective & Process The Right PRICE Ensure CONTINUOUS SUPPLY Manage critical FINANCIAL levers Balance Sheet by optimizing Cash and Inventory Income Statement by minimizing Cost of ownership The Right SERVICE paying The Right SUPPLIER and The Right PLACE with the The Right TIME at the The Right QUANTITY at the The Right QUALITY with the

Course Overview and Objectives Understanding how an organization determines its materials requirements, including what needs to be purchased, in what quantities, and at what delivery schedule Understanding the significance of cost management and price negotiation, including design, quality, and transportation and logistics considerations Understanding the critical relationship between an organization and its suppliers

Student Learning Objectives for the Course Understand how to calculate requirements Understand the purchasing process and how it fits within the overall Supply Chain process Understand the interaction and leverage between the organization and its suppliers Develop an interest in pursuing a career in Materials Management; enhance capabilities of thse already in the field

Additional Notes on the Course Buying at work vs. Buying at home Pay the least for the most Sometimes it’s Safeway, sometimes Costco, sometimes 7-11 Focus more time and attention on expensive or critical items 10% of Grade based on Participation Issues and observations from students work experience The positions of Buyer and Material Planner Careers in Supply Chain Management

Purchasing Process Overview

Objective How Supply Management supports overall strategy Initial elements the Supply Management Process

How Supply Management Supports Overall Strategy

Supply Strategy Interpreted in Organizational Strategy * Objectives Organizational Objectives Supply Strategy Organizational Strategy * Adapted from Leenders, Johnson, Flynn, and Fearon, Purchasing and Supply Management, Thirteenth Edition, McGraw Hill Irwin

Current Needs Future Needs Current Markets Future Markets Supply Strategy Links Current and Future Markets to Current and Future Needs* Current Needs Future Needs Current Markets Future Markets * Adapted from Leenders, Johnson, Flynn, and Fearon, Purchasing and Supply Management, Thirteenth Edition, McGraw Hill Irwin

Potential Business-Strategy Contribution Areas * Social issues and trends Government regulations and controls Financial planning with suppliers Product liability exposure Economic trends and environment Organizational changes Product or service line Competitive intelligence Technology e-Commerce Investment Mergers/acquisitions/ disinvestment Time-based competition It’s not just about COST! * Adapted from Leenders, Johnson, Flynn, and Fearon, Purchasing and Supply Management, Thirteenth Edition, McGraw Hill Irwin

Tactical Elements of the Supply Management Process

The 9 Elements of the Supply Management Process Mgmt Customer Demand Production Schedule Production Shipping Customer Service Identify Requirements Establish Specifications Assess Suppliers Select Supplier(s) Issue Purchase Order Follow-Up & Expedite Receive & Verify Process Payment Maintain Records

1. Identify Requirements Establish Specifications Identify Suppliers Select Supplier(s) Issue Purchase Order Follow-Up & Expedite Receive & Verify Process Payment Maintain Records Direct and Indirect Material Requisitions MRP Output Impact of Lead Time Other items to consider As availability becomes scarce, Purchasing alerts users Recommending subassemblies instead of components Proposing substitute items, where appropriate

2. Establish Specifications Identify Requirements Establish Specifications Identify Suppliers Select Supplier(s) Issue Purchase Order Follow-Up & Expedite Receive & Verify Process Payment Maintain Records Engineering Drawings and Specifications Samples Requisition Details (electronic or paper) Date originated, Document Number, Dept, Account Number, Signature(s) Complete description of material or service required Quantity and date required Shipping / delivery instructions Authorization to Buy Impact of Lead Time Other items to consider Understanding ultimate purpose (Are they asking for a Mercedes or just a car?) Catalogues and standard items Supplier Input

3. Identify Suppliers History and Geography Request for Quotation Requirements Establish Specifications Identify Suppliers Select Supplier(s) Issue Purchase Order Follow-Up & Expedite Receive & Verify Process Payment Maintain Records History and Geography Request for Quotation Request for Proposal Request for Bid Other items to consider Input from Technical Staff Other

4. Select Suppliers Supply Capability Quality Capacity Reliability Identify Requirements Establish Specifications Identify Suppliers Select Supplier(s) Issue Purchase Order Follow-Up & Expedite Receive & Verify Process Payment Maintain Records Supply Capability Quality Capacity Reliability Many other factors to be covered later in semester

5. Issue Purchase Order Relationship to Material Requisition Identify Requirements Establish Specifications Identify Suppliers Select Supplier(s) Follow-Up & Expedite Receive & Verify Process Payment Maintain Records Relationship to Material Requisition The Requisition provides the information that populates several Purchase Order data fields (see Requisition Details) Ensure Risk Management Acknowledgement Internal Controls Budgets Approvals Recurring Purchase Order Releases Pre-negotiated contracts Other items to consider ALWAYS ensure that the terms and conditions are in WRITING. A Purchase Order is a CONTRACT Continued on next Slide

5. Issue Purchase Order, continued Identify Requirements Establish Specifications Identify Suppliers Select Supplier(s) Follow-Up & Expedite Receive & Verify Process Payment Maintain Records Discrete Orders Pre-negotiated Blanket Pre-negotiated Vendor-Managed Maintenance, Repair, and Operating Supplies (MRO) Bid and Auction Corporate Purchase Card (pCard)

6. Follow-Up and Expedite Identify Requirements Establish Specifications Identify Suppliers Select Supplier(s) Issue Purchase Order Receive & Verify Process Payment Maintain Records ERP Applications assume that scheduled dates will be received on time A Scheduled delivery date needs to be monitored and managed Possible missed dates must be identified in advance and avoided If delays are inevitable, recovery plans must be developed and managed Other items to consider An understanding of the Supplier’s production process, capacity, and constraints is critical to collaborative problem solving Expediting should be on an exception basis. If it is determined that a particular supplier is consistently being expedited, corrective action should be initiated

7. Receive and Verify Receive and Verify Identify Requirements Establish Specifications Identify Suppliers Select Supplier(s) Issue Purchase Order Follow-Up & Expedite Process Payment Maintain Records Relationship to Material Requisition and Purchase Order Key data elements travel throughout Key objectives Confirm receipt of goods Ensure proper physical condition, quantity, documentation Quality parameters met Cross functional activity among Purchasing, Receiving, Materials, and Finance Other items to consider Receiving is technically a “non-value-added” activity. It is designed to ensure that something that should have been done properly actually was. The goal is to ensure quality throughout, and eliminate the need for inspection

8. Process Payment Key Document Flow Identify Requirements Establish Specifications Identify Suppliers Select Supplier(s) Issue Purchase Order Follow-Up & Expedite Receive & Verify Maintain Records Key Document Flow Requisition Purchase Order Packing Slip (Receiving) Invoice Payment Match the data in the Purchase Order, Packing Slip, and Invoice Discrepancies must be reconciled before payment is issued Some level of discrepancies can be ignored (e.g. if +/- 5% or +/- $25) Audits of all Discounts for early payment are often available and should be taken whenever possible Other items to consider Chronic discrepancies from a single Supplier could lead to a change

9. Maintain Records Maintain Records Identify Requirements Establish Specifications Identify Suppliers Select Supplier(s) Issue Purchase Order Follow-Up & Expedite Receive & Verify Process Payments Purchase Orders should be archived for up to 7 years Key Records to be Maintained (from p.77) Purchase Order Log of all PO’s Copies of Purchase Orders Commodity file Supplier history file Outstanding Contracts against which PO’s are placed Other items to consider Can be electronic or paper Paper can be managed by a third party