IDS120h POWER DEPOSITION AND Hg POOL STUDIES Nicholas Souchlas (7/26/2011) 1.

Slides:



Advertisements
Similar presentations
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
Advertisements

SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1. N. Souchlas BNL (Oct. 5, 2010)
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
IDS120j WITH/WITHOUT GAPS SH#4 AZIMUTHAL DPD DISTRIBUTION ANALYSIS Nicholas Souchlas, PBL (3/14/2012) 1.
Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Meson Production at 8 GeV for IDS120h X. Ding, UCLA Target Studies, Dec. 27, 2011.
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
Comparison of Power Depositions Xiaoping Ding UCLA Target Studies Jul. 13, 2010.
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
1Managed by UT-Battelle for the U.S. Department of Energy NF/IDS Hg Vessel Layout 30 Jun 09 Cryostat 2 Front Drain Mercury Vessel Concept Matthew F. Glisson.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
IDS120h: Be WINDOW DETAILED CALCULATION, SHIELDING VESSELS, RESULTS FOR DIFFERENT GLOBAL STEPS Nicholas Souchlas (9/20/2011) 1.
Energy Deposition of 4-MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Meeting, Feb. 9, 2010.
MC/NF TARGET SHIELDING STUDIES. NICHOLAS SOUCHLAS (10/29/2010)‏ 1.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET NICHOLAS SOUCHLAS BNL Nov 30, 2010 ‏ 1.
Energy Deposition of 4MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Mar. 9, 2010 (Update of talk on Feb. 9, 2010)
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
1 Comparison of Power Depositions X. Ding, D. B. Cline, UCLA H. Kirk, J. S. Berg, BNL Collaboration Meeting July 2, 2010.
Comparison of Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Jun. 29, 2010.
Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Apr. 20, 2010.
1 Neutrino Factory Front End (IDS) and Variations David Neuffer November 23, 2010.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3. NICHOLAS SOUCHLAS (10/28/2010)‏
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Background comparison between 20 mrad and 2 mr crossings Takashi Maruyama SLAC Machine-Detector Interface Workshop SLAC January 6-8, 2005.
STUDY II: m1507 vs. m1510 IDS120f: m1507/MCNP vs. M1510/MCNP vs. FLUKA IDS120f vs. IDS20g GEOMETRY IDS90f: B10/B11 SHIELDING RING(S) STUDIES Nicholas Souchlas.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1..
Meson Productions for Target System with GA/HG Jet and IDS120h Configuration X. Ding (Presenter), D. Cline, UCLA H. Kirk, J.S. Berg, BNL Muon Accelerator.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
IDS120j WITHOUT GAPS AND WITH MAXIMUM SIZE GAPS ( aka ''NIGHTMARE'' CASE SCENARIO ) SC#4, SC#7 AZIMUTHAL DPD DISTRIBUTION ANALYSIS. Nicholas Souchlas,
IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL. SIMULATIONS FOR 60%W+40%He SHIELDING (P12 'POINT') WITH STST SHIELDING VESSELS EFFECTS OF Be WINDOW WATER.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET. (From STUDY II to IDS120f geometries) NICHOLAS SOUCHLAS (BNL)‏ ‏ 1.
Shifting the Position of Focal Point of Proton Beam Relative to Intersection Point with Fixed Emittance for IDS120h Configuration X. Ding, UCLA Target.
DEPOSITED POWER STUDIES FOR THE MC/NF TARGET STATION. Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012) 1 DEPOSITED POWER STUDIES FOR THE MC/NF TARGET.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
IDS120j WITH GAPS SC#3 AZIMUTHAL DPD DISTRIBUTION ANALYSIS WITH MAX GAPS SC#3, SC#4 AZIMUTHAL DPD DISTRIBUTION ANALYSIS, DP AND SC TOTAL DP WITH VARYING.
IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL. SIMULATIONS FOR 60%W+40%He SHIELDING (P12 'POINT') WITH STST SHIELDING VESSELS. BP#1(STST/W), SH#1, BeWindow,SC#8.
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
Beam Dump for Carbon Target with IDS120h Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies Jan. 24, /24/14.
Meson Production of Carbon Target at 3 GeV X. Ding, UCLA Target Studies 17/18/13.
Carbon Target Design and Optimization for an Intense Muon Source X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Winter Collaboration.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
IDS120j WITHOUT RESISTIVE MAGNETS ( 20 cm GAPS AND 15.8 g/cc W BEADS ) AZIMUTHAL DPD DISTRIBUTION STUDIES FOR: BP#1, SH#1, SHVS#1/LFL, SC#1+SC#2, BeWind.
Multiprocessing/MARS15(2012)/Princeton Cluster (IDS120j w/t Resistive Magnets: New Hg Module) X. Ding UCLA (4/11/2013)
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
IDS120i GEOMETRY. SIMULATIONS FOR 60%W+40%He SHIELDING WITH STST SHIELDING VESSELS. Hg vs. Ga DEPOSITED POWER DISTRIBUTION. (using Ding's optimized parameters)
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BEAM PIPE BEYOND FIRST CRYOSTAT ( 20 cm GAPS AND 15.8 g/cc W BEADS ) Nicholas Souchlas, PBL.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
BNL solenoid capture workshop: magnet challenges are not trivial Summarized by Tengming Shen
SHIELDING STUDIES FOR IDS80 (NO IRON PLUG/YOKE), ADDING SHIELDING IN 75 TO 80 cm (WC/H 2 O, B, Cd). NICHOLAS SOUCHLAS (BNL) Dec. 14, 2010‏ ‏ 1.
Further SR Studies for the Electron Polarimeter M. Sullivan for the JLEIC Collaboration Meeting Oct. 5-7, 2016.
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
IDS120h: PROTON P0-P14 TRAJECTORY FOOTPRINT
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE
1 Nicholas Souchlas, PBL (11/15/2011)
1 Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012)
MERIT Beam Collimator Design
Presentation transcript:

IDS120h POWER DEPOSITION AND Hg POOL STUDIES Nicholas Souchlas (7/26/2011) 1

Power deposition for IDS120h for different cases of Hg pool: mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING: 60%WC+40%H 2 O >4 MW proton beam, Np=100,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. 2

IDS120g and IDS120h geometries. IDS120h IDS120g with water cooling rings around RS coils SC#1 NOW THE BIGGEST COIL EXTENDED FURTER UPSTREAM RS FURTER AWAY FROM Hg POOL GAP, JET AND PROTON BEAM 3

ENERGY DEPOSITED IN SC SOLENOIDS (SC#), SHIELDING (SH#). P12 OPTIMIZED POINT, POOL WALL CASES x=+/-6,30, 40 cm ENERGY DEPOSITED IN RESISTIVE COILS (RS#), BEAM PIPE (BP#). 4 SC~ SAME DP SH#2 ~ 200 kW DECREASE IN DP (BLUE AREA) SH#4~ SMALL INCREASE IN DP (YELLOW AREA) RS, BP~ SAME DP

HIGHLIGHTS : Power Deposited: SC#1: 0.46 kW, SC#2-SC#6: <0.029 kW SC#1-19: kW Hg POOL~200 kW DP INCRERASE POSSIBLE DECREASE OF IR FOR SC#3-7: IR SC#3-7:(120,110,100,90,80)---->(90,80,70,60,50) 5 IDS120h:ENERGY DEPOSITED IN OTHER PARTS AND TOTALS. HIGHLIGHTS : Power Deposited: SC#1: 0.46 kW, SC#2-SC#6: <0.029 kW SC#1-19: kW POSSIBLE DECREASE OF IR FOR SC#3-7: IR SC#3-7:(120,110,100,90,80)---->(90,80,70,60,50)

IDS120h:PROTONS 3D TRAJECTORY FROM Z=-300 cm USING P12 OPTIMIZED INITIAL POINT WITH POOL WALLS AT x=+/-40 cm, POOL GAP WALLS AT x=+/-6 cm FOR -15<y<0 cm AND AT x=+/-30 cm FOR -25<y<-15 cm INITIAL (x,y,z,cx,cy,cz)=( , , , , , ) FINAL (x,y,z,cx,cy,cz)=( , , 550.0, , , ) 6 FOR POOL WALLS AT x=+/- 40 cm PROTONS STOPPED BY THE z=550 cm POOL WALL FOR POOL WALLS AT x=+/- 30 cm PROTONS STOPPED BY THE x=-30 cm POOL WALL

7 IDS120h:PROTONS TRAJECTORY FROM Z=-300 cm YZ PROJECTION LENGTH OF STRAIGHT LINE: FOR x=+/-30 cm~ 280 cm~19 IL FOR x=+/-40 cm~ 350 cm~23 IL FREE Hg POOL SURFACE y=-25 cm

8 IDS120h:PROTONS TRAJECTORY FROM Z=-300 cm XZ PROJECTION

IDS120h:PROTONS TRAJECTORY FROM Z=-300 cm XY PROJECTION 9 Dot is at z = cm

FOR FREE POOL SURFACE AT y=-25 cm AND x=+/-30 cm #IL>19 x=+/-40 cm #IL>23 FOR FREE POOL SURFACE AT y=-20 cm AND x=+/-25 cm #IL>15 x=+/-35 cm #IL>24 POINTS P0, P13,P14 ARE STOPPED BY THE x=-40 cm WALL. POINTS P10,P11,P12 ARE STOPPED BY THE z=550 cm WALL. POINTS P1-P9 HIT THE z2 WALL WITH: z2=-10-15y, -45<y<-25, THIS IS THE INCLINED WALL TO THE RIGHT OF THE Hg POOL. LEAST FAVORABLE POINTS P6,P7 MOST FAVORABLE POINTS P12, P13 FOR POINT P12: 10 FOR x=+/-40 cm POOL WALLS