Study Overview & Status

Slides:



Advertisements
Similar presentations
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Advertisements

Future Circular Collider (FCC) Study
1 Future Circular Collider Study Michael Benedikt CERN, 26 th May 2014 Future Circular Collider (FCC) Study - Status Michael Benedikt.
A key quality attribute of a Future Circular Collider - Availability performance (RAMS) P. Sollander, Thanks to A. Apollonio, J. Gutleber, M. Lamont, P.
FCC Horizon 2020 Design Study Proposal Daniel Schulte for the FCC team Preparatory Collaboration Board Meeting, September 2014.
Future Circular Collider Frank Zimmermann for the FCC collaboration Future Research Infrastructures – Challenges and Opportunities Varenna, 9 July 2015.
R. Aleksan Saclay Avril 14, 2015 Informations générales CECP Prochain RV.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
Round-table: Discussion on Future Machines. With the discovery of the Higgs Boson Self-consistent model (SM) accounting for all Particle Physics phenomena.
The FCC Magnet Program: Challenges and Opportunities for HTS
1 Future Circular Collider Study Michael Benedikt CLIC Workshop 2014 Future Circular Collider Study Overview.
Future Circular Collider
Understand the Present to Master the Future Johannes Gutleber Future Circular Collider.
General news LCD monthly meeting Oct 28 th 2013 L. Linssen, CLICdp/LCD monthly meeting, 28 Oct
Future Accelerators at the High Energy Frontier
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
FCC Accelerator Studies Daniel Schulte for the FCC team LCWS 214, Belgrade October 2014.
FCC Study Status & Summary of FCC Week 2015
Patrick Janot News and Organization  Major events since last coordination meeting (30 April 2014) u 7 th FCC-ee (TLEP) Physics Workshop (19-21 June 2014)
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Work.
330 registered participants Closing remarks. 2 Future Circular Collider Study FCC Kick-Off 2014 Discussion of all FCC aspects Refine scope of the study.
WelcomeWelcome CSEM – CERN Day 23 rd May 2013 CSEM – CERN Day 23 rd May 2013 to Accelerating Science and Innovation to Accelerating Science and Innovation.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
Future Circular Collider
1 H2020 FCC DS proposal Michael Benedikt ESGARD Meeting 24 March 2014 Future Circular Collider (FCC) study H2020 DS proposal PRELIMINARY Michael Benedikt.
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
1 FCC News Frank Zimmermann LHeC-CG, 2 October 2015 FCC status F. Zimmermann on behalf of the FCC Collaboration LHeC Coordination Group 2 October 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN Report R-D Heuer ECFA, November Scientific Strategy Implementation of all four European Strategy high priority items Implementation of a diverse.
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
1 Future Circular Collider Study Frank Zimmermann FCC-ee Physics Meeting 3 February 2015 Future Circular Collider (FCC) Study Scope & Collaboration M.
1 Future Circular Colliders Michael Benedikt 2015 Higgs Hunting, Orsay Future Circular Colliders M. Benedikt gratefully acknowledging input from FCC global.
CERN-US Relations and the LHC Program Rüdiger Voss Head of International Relations, CERN USLUA Annual Meeting, Argonne| November 12-14, 2014.
Future Circular Colliders (FCC) (and other relevant one) FCC study page :
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Summary.
Salam, NTU Singapore, Peter Jenni (Freiburg and CERN) LHC, Higgs and Beyond (part II - ATLAS) 1 Dijet mass of 8.8 TeV The future of particle.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
1 Future Circular Collider Study Frank Zimmermann FCC-ee Physics Meeting 3 February 2015 status of FCC-hh/FCC-ee machine studies M. Benedikt, D. Schulte,
1 Future Circular Collider Study Michael Benedikt Wigner Institute Budapest, 7 June 2016 Future Circular Collider Study FCC PS SPS LHC.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
R. Aleksan Saclay May 11, Réunion Générale FCC 2016 à Rome  avril  > 450 personnes (des demandes d’inscription ont dû être refusées)  Collaboration.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
1 Future Circular Collider Study Michael Benedikt 2 nd FCC Week, Rome, April 2016 Future Circular Collider Study Status and Parameter Update
Future Circular Collider Study
FCC-ee Interaction Region design
LHeC Coordination Meeting, 9 June 2017
1st FCC Infrastructure & Operation meeting
FCC Kick-Off 2014 Future Circular Collider (FCC) study: kick-off meeting & recent progress Frank Zimmermann BE/ABP 22 May 2014 thanks.
FCC summary report March 2015 Washington.
Future Circular Collider
Overview of Future pp Collider Plans
Welcome to CERN Volker Mertens CERN Technology Department.
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
Forming a Gender Equality Group
Future Collider Projects at CERN
Olivier Napoly, coordinator CEA/Irfu
Presentation transcript:

Study Overview & Status Michael Benedikt CERN March 23rd, 2015

Topics Motivation, Goal and Scope Parameters, Technologies EuroCirCol Study Organisation Outlook

Motivation European Strategy for Particle Physics 2013: “…to propose an ambitious post-LHC accelerator project….., CERN should undertake design studies for accelerator projects in a global context,…with emphasis on proton-proton and electron-positron high-energy frontier machines..…” US P5 recommendation 2014: ”….A very high-energy proton-proton collider is the most powerful tool for direct discovery of new particles and interactions under any scenario of physics results that can be acquired in the P5 time window….”

Goal of FCC Study Conceptual Design Report By end 2018 In time for next European Strategy Update

Scope: Accelerator & Infrastructure FCC-hh: 100 TeV pp collider as long-term goal  defines infrastructure needs FCC-ee: e+e- collider, potential intermediate step FCC-he: integration aspects of pe collisions Push key technologies in dedicated R&D programmes e.g. 16 Tesla magnets for 100 TeV pp in 100 km SRF technologies and RF power sources Tunnel infrastructure in Geneva area, linked to CERN accelerator complex Site-specific, requested by European strategy

Scope: Physics & Experiments Elaborate and document - Physics opportunities - Discovery potentials Experiment concepts for hh, ee and he Machine Detector Interface studies Concepts for worldwide data services Overall cost model Cost scenarios for collider options Including infrastructure and injectors Implementation and governance models

CERN Circular Colliders + FCC 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 20 years Constr. Physics LEP Design Proto Construction Physics LHC Design Construction Physics HL-LHC Design Future Collider Physics Construction Proto

Study time line towards CDR 2014 2015 2016 2017 2018 Q1 Q2 Q3 Q4 Study plan, scope definition Explore options “weak interaction” conceptual study of baseline “strong interact.” FCC Week 2015: work towards baseline FCC Week 17 & Review Cost model, LHC results  study re-scoping? FCC Week 2016 Progress review Elaboration, consolidation FCC Week 2018  contents of CDR Report CDR ready

conceptual study of baseline “strong interact.” Focus on Study-Phase 2 2014 2015 2016 2017 2018 Q1 Q2 Q3 Q4 FCC Week 2015: work towards baseline conceptual study of baseline “strong interact.” FCC Week 2016 Progress review Converge on solid and agreed baseline scenarios Launch technology R&D at international level Assure coherence between study branches CDR ready

Key Parameters FCC-hh Parameter FCC-hh LHC Energy [TeV] 100 c.m. Dipole field [T] 16 8.33 # IP 2 main, +2 4 Luminosity/IPmain [cm-2s-1] 5 - 25 x 1034 1 x 1034 Stored energy/beam [GJ] 8.4 0.39 Synchrotron rad. [W/m/aperture] 28.4 0.17 Bunch spacing [ns] 25 (5) 25

FCC-hh Luminosity Goals Two parameter sets for two operation phases: Phase 1 (baseline): 5 x 1034 cm-2s-1 (peak), 250 fb-1/year (averaged) 2500 fb-1 within 10 years (~HL LHC total luminosity) Phase 2 (ultimate): ~2.5 x 1035 cm-2s-1 (peak), 1000 fb-1/year (averaged)  15,000 fb-1 within 15 years Yielding total luminosity O(20,000) fb-1 over ~25 years of operation

FCC-hh luminosity evolution 24 h radiation damping: t~1 h for both phases: beam current 0.5 A unchanged! total synchrotron radiation power ~5 MW. phase 1: b*=1.1 m, DQtot=0.01, tta=5 h phase 2: b*=0.3 m, DQtot=0.03, tta=4 h

FCC-hh Integrated Luminosity/day phase 1: b*=1.1 m, DQtot=0.01, tta=5 h phase 2: b*=0.3 m, DQtot=0.03, tta=4 h

Key Parameters FCC-ee Parameter FCC-ee LEP2 Energy/beam [GeV] 45 120 175 105 Bunches/beam 13000- 60000 500- 1400 51- 98 4 Beam current [mA] 1450 30 6.6 3 Luminosity/IP x 1034 cm-2s-1 21 - 280 5 - 11 1.5 - 2.6 0.0012 Energy loss/turn [GeV] 0.03 1.67 7.55 3.34 Synchrotron Power [MW] 100 22 RF Voltage [GV] 0.3-2.5 3.6-5.5 11 3.5 Dependency: crab-waist vs. baseline optics and 2 vs. 4 IPs

FCC-ee: Luminosity vs. Energy Crab waist 4 IP Crab waist 2 IP Baseline 4 IP Baseline 2 IP

Geology Studies – Example 93 km 90 – 100 km fits geological situation well, better than a smaller ring size LHC suitable as potential injector

Push Technologies ? WHY

Scale Up versus Scale Out Scale-out of available technologies without advancement leads to unsustainable and inadequate performance Mandatory to use large projects to develop new technologies Sustainability Availability Economy Innovation Mining Cost effective operation: Personnel and material resources Energy efficiency Number of subsystems requires breakthrough in reliability, availability Diversify technology sources to control risk Economic return to society is mandatory

Key Technology R&D - HFM Conductor R&D Nb3Sn Magnet Design 16 T Increase critical current density Obtain high quantities at required quality Material Processing Reduce cost Develop 16T short models Field quality and aperture Optimum coil geometry Manufacturing aspects Cost optimisation

Key Technology R&D - RF Beyond Nb Efficiency Superconducting RF Beyond Nb Power Conversion Efficiency Cavity R&D for large Q 0 , high gradient, acceptable cryo power Multilayer additive manufacturing combining Cu and LTS materials High quality over large surfaces Push Klystrons far beyond 70% efficiency Increase power range of solid-state amplifiers High reliability for high multiplicity

A key to New Physics

EuroCirCol EU Horizon 2020 Grant EC contributes with funding to FCC-hh study Core aspects of hadron collider design: arc & IR optics design Feasibility study of key technologies: 16 T magnet program, cryogenic beam vacuum system

Evaluation Results Science is excellent 15/15 Science is excellent Project is ambitious and shows innovation potential Objectives are clear and approach is credible Will have impact on other disciplines and industry Key element of European Strategy on Particle Physics Quotes Recognition of FCC Study by European Commission

EuroCirCol Consortium + Associates CERN IEIO TUT Finland CEA France CNRS KIT Germany TUD INFN Italy UT Netherlands ALBA Spain CIEMAT STFC United Kingdom UNILIV UOXF KEK Japan EPFL Switzerland UNIGE NHFML-FSU USA BNL FNAL LBNL Japan KEK Finland TUT France CEA, CNRS Italy INFN Germany KIT, TUD Switzerland EPFL, UNIGE Netherlands UT Spain ALBA, CIEMAT CERN United Kingdom STFC, UNILIV, UOXF Consortium Beneficiaries, signing the Grant Agreement

Study Setup Carried out by global collaboration Universities, laboratories & industry worldwide Hosted by CERN Geographically Balanced Worldwide Topically Complementary Excellence

The FCC Collaboration A consortium of partners based on a Memorandum Of Understanding (MoU) Working together on a best effort basis Self governed Incremental & open to academia and industry Specific contributions detailed in Addendum

Collaboration Status 51 institutes 19 countries EC participation

51 FCC collaboration members & CERN as host institute, 22 March 2015 ALBA/CELLS, Spain Ankara U., Turkey U Bern, Switzerland BINP, Russia CASE (SUNY/BNL), USA CBPF, Brazil CEA Grenoble, France CEA Saclay, France CIEMAT, Spain CNRS, France Cockcroft Institute, UK U Colima, Mexico CSIC/IFIC, Spain TU Darmstadt, Germany DESY, Germany TU Dresden, Germany Duke U, USA EPFL, Switzerland GWNU, Korea U Geneva, Switzerland Goethe U Frankfurt, Germany GSI, Germany Hellenic Open U, Greece HEPHY, Austria IFJ PAN Krakow, Poland INFN, Italy INP Minsk, Belarus U Iowa, USA IPM, Iran UC Irvine, USA Istanbul Aydin U., Turkey JAI/Oxford, UK JINR Dubna, Russia FZ Jülich, Germany KAIST, Korea KEK, Japan KIAS, Korea King’s College London, UK KIT Karlsruhe, Germany Korea U Sejong, Korea MEPhI, Russia MIT, USA NBI, Denmark Northern Illinois U., USA NC PHEP Minsk, Belarus U. Liverpool, UK PSI, Switzerland Sapienza/Roma, Italy UC Santa Barbara, USA U Silesia, Poland TU Tampere, Finland

Study Coordination Group M. Benedikt F. Zimmermann Study Lead A. Ball, F. Gianotti, M. Mangano Hadron Collider Physics & Experiments A. Blondel, J. Ellis, C. Grojean, P. Janot Lepton Collider Physics & Experiments M. Klein, O. Bruning ep Physics, Experiment, IP Integration B. Goddard Hadron Injectors D. Schulte, M. Syphers Hadron Collider Y. Papaphilippou Lepton Injectors F. Zimmermann, J. Wenninger, U. Wienands Lepton Collider L. Bottura, E. Jensen, L. Tavian Accelerator Technologies R&D JM. Jimenez Special Technologies P. Lebrun, P. Collier Infrastructures & Operation P. Lebrun, F. Sonnemann Costing & Planning Further enlargement of coordination group and study teams with international partners

Information Management in FCC http://cern.ch/fcc

Documents and Publications Study internal CERN EDMS Notes, drawings, slides, minutes Source files of scientific papers http://cern.ch/fcc-edms Public documents CERN CDS PDF of scientific papers, public slides, official reports, videos http://cern.ch/cds > R&D and Studies > Future Circular Collider Documents

Collaborative Work Platform Meetings Structure in CERN Indico http://cern.ch/fcc-meetings Collaboration Tools Institutes and work breakdown overview Growing platform for information exchange http://cern.ch/fcc/collaboration

Access to Collaboration Services Collaboration members can subscribe to one of the following e-groups to gain access to IT services at http://cern.ch/egroups E-group Name: fcc-collider-hadron fcc-collider-lepton fcc-experiments-hadron fcc-experiments-lepton fcc-infrastructures fcc-injectors-hadron fcc-injectors-lepton

Outlook 2015 Freeze baselines parameters and concepts Colliders, injectors and infrastructures Put Nb3Sn/16 T magnet program on solid feet Define and launch selected technology R&D programmes Reinforce physics and detector simulations Pursue MDI and experiment studies Further enlarge our global FCC collaboration

This 1st FCC Week should Stimulate exchange between participants of all study areas Strengthen the collaboration network create fruitful discussions towards our common goal

Have a Great Week!