Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.

Slides:



Advertisements
Similar presentations
XMM-Newton 1 Matthias Ehle - SCI-OAX EPIC BGWG Meeting#6 November 5 th, 2007 BGWG Report from the June XMM-Newton User Group Meeting Matthias Ehle.
Advertisements

XMM XMM-NEWTON TTD Meeting: 8 April OPS-OAX (J. Martin) Autocommanding J.Martin, XMM-Newton SOE.
XMM EPIC MOS Jenny Carter 4 th EPIC BG WG Meeting Mallorca, 25/10/06 BGWG blank sky data analysis Jenny Carter, University of Leicester.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
CXC Manager’s Status Report Chandra Users’ Committee Meeting Roger J. Brissenden 12 January 2004.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC The XMM-Newton cross-calibration.
Isabel Caballero, Anne Wellbrock Page 1 XMM-Newton ESAC XMM-Newton EPIC relative timing analysis Isabel Caballero Anne Wellbrock M.G.F. Kirsch.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
XMM-Newton Status of EPIC Operations Guillermo Buenadicha & Pedro Calderón Mallorca 8-April-2008.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
CXC Manager’s Status Report Chandra User Committee Meeting Roger J. Brissenden 25 June 2002.
MOS 3x3 mode slow slew survey Richard Saxton October 2006.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Results from the EPIC- Calibration-Workshop.
XMM EPIC SOC Richard Saxton Background, Operations & Calibration (BOC) meeting Madrid, 23/03/10-24/03/10 Recent changes in Epic-related SAS spectral tasks.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton XMM Newton cross calibration M.G.F.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
EPIC TTD#14 SCIENCE OPERATIONS Mallorca, 01 February 2005 L. Metcalfe SCI-SDX Science Support Manager 1 Science Operations & Data Systems Division Research.
Mallorca EPIC Cal Meeting - February 2005 Darren Baskill: XMM project: MOS monitoring.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
Slews: Fast and Slow. Fast Slew Status  XMMSL1: catalogue of slew sources released May 2006 Revs , 5180 detections, 2692 Revs , 5180 detections,
XMM EPIC MOS Andy Read for the BGWG CAL/OPS/BG Meeting Palermo, Sicily 11-13/04/07 EPIC Background Working Group Summary: Meeting.
MPE EPIC Cal Meeting – May 2006 Darren Baskill: XMM project: MOS gain monitoring MOS.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting Mallorca, Spain 26-27/10/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group Palma de.
XMM EPIC MOS Andy Read 6 th EPIC BG WG Meeting Mallorca, Spain 05/11/07 Agenda:
The XMM slew survey: status and future Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Column rejection in the MOS  The core of soft sources is removed by the standard emchain.  Due to very large fluctuations in count rate from one column.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
Guillermo Buenadicha / Neil Cheek SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha Neil Cheek MALLORCA 26/10/2006.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
XMM EPIC MOS Andy Read 4 th EPIC BG WG Meeting Mallorca, Spain 25/10/06 Agenda: EPIC BG working group: 4th meeting 25/10/06 – Mallorca.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Andy Read OPS/CAL/BG (OCB) Meeting Mallorca, Spain 05-07/11/07 Report from the BGWG (05/11/07) Andy Read, on behalf.
1 COROT: Scientific comity Sept Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
A look at XMM slew data Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri, Puri Munuera.
XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
The Slow Slew Survey Richard Saxton / Pedro Rodriguez November 2006.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
Solar X-ray Imager (SXI) Current and Future Requirements 22 May 2001 Steve Hill Solar Causes and Effects... Operational Requirements Improvements for GOES-R+
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Date of download: 6/2/2016 Copyright © 2016 SPIE. All rights reserved. View of the XMM-Newton spacecraft subsystems, with external shrouds and structure.
Monitoring weather and climate from space
Presentation transcript:

Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for optical loading in the complete pn fov –Open ??  EPIC_9/2 on Altieri: to provide new CCFs reflecting the current MOS bad pixels. –Closed with latest CCF/SAS release  EPIC_8/1 on Palombara: to propose work-around for EMDH limitation of 50 bad pixels flagged per CCD (cooling perhaps makes it less critical)

Page 2 ACTIONS (from cooling review) AI Wrap-1: on the SOC (MK) to summarise current planning for CALCLOSED measurements with a view confirming PI agreement to the strategy at the EPIC/TTD/Calibration meeting. AI Wrap-2 : on the SOC (MK) to specify any ongoing monitoring of CCD noise with a view to confirming a strategy with the PI at the upcoming EPIC TTD/Calibration Meeting. AI Wrap-3 : on the SOC (MK) to specify current planning for bright- pixel monitoring with a view to confirming a strategy with the PI at the upcoming EPIC TTD/Calibration Meeting.

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 3 XMM-Newton Status of science operations EPIC OPS Meeting 03. January 2003 University of Tübingen (IAAT)

Page 4 Content Instruments, S/C & Cal. XSA, SAS, misc. operational efficiency radiation: “space weather” spacecraft status v manoeuvre (Mauro)

Page 5 INSTRUMENTS AND S/C GENERAL :  Earth Limb constraint set (from 47) to 42 degrees  Single boresight died: it put the OVIII Ly alpha line onto RGS defect  Meteor shower avoidance : –Perseids (Revs.490 and 491) and Leonids (Revs.538 and 540) avoidance –probable meteoroid impact occurred on Rev.490 few-frame flash seen on MOS2: no lasting effects seen –in the following days the "MOS blobs" were noticed  Eclipse season in September (another one coming up)

Page 6 INSTRUMENTS AND S/C (Contd.) EPIC :  MOS cooling (to -120) (see talk of LM) –new temperature calibration  pn Full Frame with masking tested (see talk of UB)  optimization of the pn Offset per observation (see talk of EK) RGS :  RGS cooling (to -110)  RGS HTR mode (not in A03)

Page 7 CALIBRATION GENERAL :  enhanced installation of SciSIM. Commitment to maintenance.  new portal for calibration:  Capella cross-calibration with Chandra: GRB killed first effort second attempt it went ahead with simultaneous observations EPIC :  See specific calibration talks and Cooling report RGS :  RGS IDT believes great improvements of wavelength calibration possible  key is better pointing reconstruction.

Page 8 XSA  XSA v1.5 release on 15/11/2002 –Product and Postcard Server –custom retrieval –dataset size indicator –links to publications –tar option in shopping basket –quota on volume

Page 9 SAS  Version of the Science Analysis System released  need a new SAS Manual version soon  full restructuring of the SAS web pages done in period  VilSpa took over of SAS RGS tasks from Columbia  second SAS workshop (very positive feedback)

Page 10 MISCELLANEOUS  intensive efforts on HEASARC-based RPS tool for A03  CD distribution to PIs to be discontinued beginning 2003 notification of data availability through XSA  SOC contact for EPIC OPS/Cal. meetings  Marcus K. from time to time have a look at:

Page 11 MOS1 efficiency

Page 12 MOS1 efficiency:

Page 13 PN efficiency

Page 14 pn efficiency:

Page 15 observing statistics XMM 93.7% 89.6% 16.2%96.0%91.2%19.1% TimeTargets

Page 16 radiation by courtesy of Rosario Gonzalez Riestra ESA(XMM-RGS) Revolution RGS count rate bg region of CCD9 Time (~Revolution) RGS count rate bg region of CCD h after Perigee h after Perigee h after Perigee h after Perigee Phase

Page 17 spacecraft status All spacecraft subsystems on primary chain. No redundancy used sofar. hydrazine: ~5 kg/year solar power: nominal earth limb constraint : since 10/02 47º  42 º next eclipses: 19/02/2003 until 13/03/2003