Topics To Be Covered 1. Process Analysis for Continuous Improvement

Slides:



Advertisements
Similar presentations
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Advertisements

Operations Management Statistical Process Control Supplement 6
Chapter 9A Process Capability and Statistical Quality Control
Quality Assurance (Quality Control)
Chapter 9A. Process Capability & Statistical Quality Control
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
BMM 3633 Industrial Engineering
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Seventeen Statistical Quality Control GOALS When.
Quality Control Pertemuan 12 Mata kuliah: J Manajemen Operasional Tahun: 2010.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Adeyl Khan, Faculty, BBA, NSU Quality Control Adeyl Khan, Faculty, BBA, NSU Phases of Quality Assurance 10-2 Figure 10.1 Acceptance sampling Process.
Agenda Review homework Lecture/discussion Week 10 assignment
Chapter 9- Control Charts for Attributes
Chapter 10 Quality Control McGraw-Hill/Irwin
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
Operations Management
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
CHAPTER 8TN Process Capability and Statistical Quality Control
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Quality Control.
Statistical Process Control (SPC)
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
10 Quality Control CHAPTER
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Control Charts for Attributes
X-bar and R Control Charts
Chapter 10 Quality Control McGraw-Hill/Irwin
Statistical Process Control and Quality Management
10-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Process Capability and SPC
Process Capability and Statistical Process Control.
Statistical Process Control (SPC) Chapter 6. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work Design.
Control Charts for Attributes
Chapter 10 Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
Acceptance Sampling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Operations Management
Statistical Quality Control/Statistical Process Control
Statistical Quality Control
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
Statistical Process Control Production and Process Management.
Quality Control  Statistical Process Control (SPC)
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Process Capability and Statistical Quality Control.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 30 1.
Assignable variation Deviations with a specific cause or source. Click here for Hint assignable variation or SPC or LTPD?
Acceptable quality level (AQL) Proportion of defects a consumer considers acceptable. Click here for Hint AQL or producer’s risk or assignable variation?
36.3 Inspection to Control Quality
Tech 31: Unit 3 Control Charts for Variables
Statistical Process Control
acceptable quality level (AQL) Proportion of defects
Statistical Process Control (SPC)
10 Quality Control.
10 Quality Control.
Statistical Process Control
Process Capability.
Presentation transcript:

Topics To Be Covered 1. Process Analysis for Continuous Improvement 2. Benchmarking 3. Process Improvement Approaches 4. Pareto Chart 5. Cause and Effect Diagram 6. Acceptance Sampling 7. Process Control Charts 8. Control Limits vs Specification Limits

Variability Types Random Variability: Natural variations in the output of a process, created by countless minor errors. (not readily fixable) Assignable Variations: A variation whose cause can be identified. Equipment or Process cause. Type of variability that is most commonly addressed. -3 3 -2 2 -3 3 -2 2 Preferred

Areas of Waste Over production – making or doing more than required Waiting – for info, materials, people, maintenance, etc Transport – moving people or goods around or between sites Poor process design – too many/too few steps, non standardization, inspection rather than prevention Inventory – raw materials, WIP, finished goods, papers, electronic files Motion – inefficient layouts or poor ergonomics at workstations or in offices. Defects – errors, scrap, rework, non-conformance Underutilized personnel resources and creativity – ideas that are not listened to skills that are not utilized

Continuous Improvement of Process Analysis Proactive vs Reactive overall proactive is cheaper Various Methods for Process Improvement Kaizen Process Based Management Taguchi General Steps for Process Improvement Model. 1. Define the problem in the context of the process 2. Identify, analyze & document the process 3. Measure current performance 4. Understand why the process is performing as it is. 5. Develop a strategy & implement the alternative chosen 6. Evaluate the results of the new process 7. Commit to continuous improvement of the process

Benchmarking The search for industry “best practice” that lead to superior business performance. Perspective companies to bench mark are typically leaders in their industry Not necessarily in your industry. Benchmarking steps: 1. Identify what is to be benchmarked. 2. Identify competitive companies 3. Determine data collection method, collect data 4. Determine current performance gap 5. Project future performance levels. 6. Communicate benchmarking findings; gain acceptance 7. Establish process improvement goals 8. Develop action plan 9. Implement specific actions & monitor progress 10. Recalibrate benchmarks; return to 1.

Process Improvement Approaches Brainstorming Generating ideas in an environment free of criticism & intimidation 4 basic principles 1. No criticism 2. No constraints 3. Build on other peoples ideas 4. Encourage participation What are some obstacles to effective Brainstorming? Process documentation: Process mapping (flow charting) Run Diagram (line chart) Check sheets Pareto charts Cause and Effect diagrams

Pareto Chart Typically a bar chart that shows the frequency of different types of defects in a product or service. Shows which problems may make the largest improvement if a solution is found Separates vital problems from trivial ones. Is tracking the number of occurrences for a specific fault the best measure for a Pareto Chart? Why or why not?

Cause and Effect Diagram Also called a Fishbone Diagram Useful for communicating the potential causes of an out-of-control quality characteristic and coordinating the choice of a corrective action. 1. List the concern or problem (effect) 2. Identify the factors influencing this concern. 3. List the reasons why this factor is influencing this concern. 4. Investigate potential solutions to remedy the concern. Effect

Acceptance Sampling A form of inspection applicable to lots or batches. Purpose is to decide if a batch satisfies a predetermined standard. Most useful for the following conditions: Large # of items produced in short time Cost consequences of passing defects is low Destructive testing is required Fatigue or boredom caused by inspecting large # of items leads to errors. Sampling Plan Specify the batch size Specify a frequency Specify an acceptance/rejection criteria Methods Single Sampling Double Sampling Multiple Sampling Cost & time required typically define the plan

Statistical Sampling and Control What types of product characteristics could we sample? What are we trying to control? Central Limit Theorem Assumes if you have a large enough sample size then the distribution of the sample mean will approximate a normal distribution, regardless of their true distribution. Most say that 30-50 is a large enough sample. Use the Student t for less Statistical sampling uses inferential statistics The idea is that the sample taken describes the entire population. Error Types Type I (): The sample is incorrectly rejected when the batch is good. (Producer’s Risk). Rejects the process as being out of control when it is in control. Type II(): The sample is accepted though the batch is bad. (Buyer’s Risk) Accepts the process as in control when it is not. Selecting  and  is not trivial

SPC CHART 2.5 2.4 2.3 2.2 2.1 2.0 1.9 1.8 1.7 1.6 1.5 . UCL . . . . . . _ X . . . . LCL 1 2 3 4 5 6 7 8 9 10 Sample

Mean Control Charts: Variable Data Process control charts designed to detect shifts in the mean value of a process. If the process true mean of sample is unknown then use : = X +/- Z x X ; Grand Mean or average of the average observations and samples  = process standard deviation x =  / (n) 1/2 ; Standard deviation of distribution of sample mean Hypothesis is that the process is in-control (Ho ) If process true standard deviation of sample is not known then use X-bar chart. = - Lower Control Limit: X - A2* R = - Upper Control Limit: X + A2 * R Compares each sample mean to a Grand Mean A2 found in table (pg 310) and are based on number of observations per samples.

Range Control Chart: Variable Data If the process variance is unknown then use a R-chart. _ Lower Control Limit: R * D3 Upper Control Limit: R * D4 Compares each range of a sample to a mean of the range of other samples. D3 & D4 are found in a table (pg 310) and are based on the number of observations per samples. To adequately establish the variability of a process it is recommended to use both mean and range control charts on a sample. Accuracy Dispersion

Mean Control Charts: Variable Data Four samples of three observations each have been taken, with actual measurements (in centimeters) shown below. Construct three sigma mean and range charts and determine if corrective action is needed. Sample 1 2 3 4 12.3 11.9 12.0 12.1 12.2 12.2 12.2 11.8 12.1 12.2 11.8 11.8 The standard deviation of the sample is known and is 0.6, construct three sigma mean chart. Use the above data.

Process Control Charts: Attribute Data What is an Attribute? Use when data is subjective and can be counted. P chart is used when the number of both good and bad are known. C chart is used when the number of bad parts only are known. P Chart Underlying sample distribution is the binomial Monitors the proportion of defects generated in a process Constructed and used similar to the mean Difference is we use the percent defects in a population LCL: P - 3p UCL: P + 3 p p = (( P (1-P) )/ n)1/2

Process Control Charts: Attribute Data C Chart Underlying sample distribution is the Poisson. large sample sizes approximate a normal distribution) To track the countable number of defects when the ample size is the same. The mean number of defects per unit is C and standard deviation is (C)1/2 If C is unknown then use C = # of defects / # of samples. If less than zero, use zero. LCL: C - 3 (C) 1/2 UCL: C + 3 (C) 1/2

Attributes Problem A town’s department of public works is concerned about adverse public reaction to a sewer project that is currently in progress. Because of this, The Commissioner of Public Works has authorized a weekly survey to be conducted of town residents. Each week, a sample of 100 residents is questioned on their feelings towards the project. The results to date are shown below. Analyze this data using an appropriate control chart with a 5% risk of Type I error. Is the community sentiment stable? Week 1 2 3 4 5 6 7 8 Opposed 10 8 12 6 4 14 8 10 Construct the appropriate control chart for the observations listed below, and determine if the process is in control using two sigma limits. Observation 1 2 3 4 5 6 7 8 9 10 11 Number of 9 4 3 5 6 3 4 2 3 2 3 Defects per unit

Control Limits vs Specification Limits The quality control limits represent the natural variation produced by a process. Does not guarantee the product meets the design specifications. Must be able to define a way of telling if a process is capable to produce at a given design specification. Cp defines the relationship between control limits of a process and the specification limits of design. Cp = (USL - LSL)/6  USL = upper spec limit LSL = lower spec limit  = Standard deviation of the process  can be approximated by R/D2 Cp = 1 says process is barely capable Cp > 1 says Process is capable Cp < 1 says process is not capable Usually strive for a Cp = 1.33 or better Cp does not consider how well the process is centered within the limit

Control Limits: Cpk Cpk is used to define if the process and the spec limit are centered. Compute by finding difference between each of the specification limits and the mean identifying the smaller difference divide difference by three standard deviations of the process. Cpk = Min [ ((Upper spec - Process mean)/3), ((Process mean - Lower Spec)/3)] Limitations of Capability Index 1. The process may not be stable. capability index is meaningless. 2. The process output may not be normally distributed. Inference about fraction of output that is not acceptable will be incorrect. 3. The process is not centered if the Cp index is used a misleading result is given.

Control Limits Problems Studies on a machine that molds plastic water pipe indicates that when it is injecting 1-inch diameter pipe, the process standard deviation is 0.05 inches. The one-inch pipe has a specification of 1-inch plus or minus 0.10 inch. What is the process capability index (Cp)? Is the process capable? The specification limit for a product is 8cm and 10 cm. A process that produces the product has a mean of 9.5cm and a standard deviation of 0.2cm. What is the process capability, Cpk? Is the process capable?