28 October 2014 1 st Space Glasgow Research Conference, Glasgow, United Kingdom Solar Sailing: How to Travel on a Light Beam Alessandro Peloni Supervisor:

Slides:



Advertisements
Similar presentations
Deflecting APOPHIS with a Flotilla of Solar Sails Jean-Yves Prado Olivier Boisard, Alain Perret,Guy Pignolet U3P France.
Advertisements

Low-thrust trajectory design ASEN5050 Astrodynamics Jon Herman.
An insertion burn at local noon has the advantage that the spacecraft is kicked into a 11 resonant orbit, with an inexpensive recovery manoeuvre, if the.
Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
28 October st Space Glasgow Research Conference, Glasgow, United Kingdom.
Dept. of Aerospace Engineering University of Glasgow Global Trajectory Optimization 3 (How to fail 3 times in a row) Massimiliano.
Precision Control Autonomous Systems for NEO Mission Design Karl Williams Matthew Zimmer.
DMS-DQS-SUPSC03-PRE-10-E © DEIMOS Space S.L.U. Orbital Dynamics About Small Bodies Stardust Opening Training School University of Strathclyde, 21 st November.
rd Global Trajectory Optimisation Competition Workshop Aula Magna del Lingotto, Turin (Italy), June 27, 2008 © 2008 DEIMOS Space, S.L. –
Issue/Revision: 1.0 Reference: Status: For information Only ESA UNCLASSIFIED - For Official Use Solar Orbiter: Launch Options Favouring Data.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
Corporate Communications April rd Global Trajectory Optimization Competition Team 13 : Thierry Dargent* Vincent Martinot* Joris Olympio **
Korea Aerospace Research Institute (KARI)
Jan 2016 Solar Lunar Data.
Perijove 2: engine issues

The 6 steps of data collection:
Analyzing patterns in the phenomena
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Apr-Jun Jan-Mar Jul-Sep Oct-Dec


Transit Orbits Kassandra De Voto

2017 Jan Sun Mon Tue Wed Thu Fri Sat
May Jun Jul Aug Sep Oct Nov Dec 2017 Milestone 1 May 10


Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com

Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16

Step 3 Step 2 Step 1 Put your text here Put your text here
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat


©G Dear 2008 – Not to be sold/Free to use
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
GOALS Focus on release of info and data in timely, relevant, ongoing fashion (based on audience) Create communications tools and strategies that reflect.
Electricity Cost and Use – FY 2016 and FY 2017

SC SC SC WS SC S HIS Background document Seminar document
EagleSat 2 – Mission and Development Overview

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Day 1 of 2 Skull and Spirit Creature
Project timeline # 3 Step # 3 is about x, y and z # 2
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

28 October st Space Glasgow Research Conference, Glasgow, United Kingdom Solar Sailing: How to Travel on a Light Beam Alessandro Peloni Supervisor: Matteo Ceriotti Image credits: NASA website

How to travel on a light beam? Solar Radiation Pressure 28 October 2014Alessandro Peloni2

How to travel on a light beam? Solar Sail ideal model 28 October 2014Alessandro Peloni Sunjammer. Image credits: IKAROS. Image credits: JAXA website 3

How to travel on a light beam? Solar Sail vs Low-Thrust spacecraft 28 October 2014Alessandro Peloni4

Why NEOs? 28 October 2014Alessandro Peloni NEO scientific relevance: Asteroid Itokawa studied by “HAYABUSA” Image credits: “HAYABUSA” mission overview, ISAS – JAXA website 15/02/2013 Chelyabinsk impact Image credits: ESA website 5

Why NEOs? 28 October 2014Alessandro Peloni You are here 6

Multiple NEO Rendezvous Mission: Mission Requirements [1] 28 October 2014Alessandro Peloni7

Objective 28 October 2014Alessandro Peloni Mixed combinatorial/optimisation problem Develop a method to find as many sequences as possible feasible by a solar sail 8

Approach method 28 October 2014Alessandro Peloni Preliminary sequences found via heuristic rules and simplified trajectory models Optimal control problem performed on better sequences found, in order to obtain feasible trajectories for solar sails 9

2D shape-based approach [1] 28 October 2014Alessandro Peloni [1] De Pascale, P. and Vasile M., “Preliminary design of low-thrust multiple gravity-assist trajectories”, Journal of Spacecraft and Rockets, Vol. 43, No. 5, 2006 In-plane Modified Equinoctial Elements: 10

Sequence finder 28 October 2014Alessandro Peloni Complete list of NEOs Pre-pruning on Keplerian parameters Local pruning on semi-major axis Shaping function from Earth to all available NEOs Local pruning on Keplerian parameters Local pruning on semi-major axis Shaping functions to all available NEOs Add stay time at the object Sequence complete YES NO Add a new object Mission time > 10 years? 11

Optimisation 28 October 2014Alessandro Peloni Trajectories and controls of each leg separately through shape-based method Pseudospectral transcription (GPOPS-II) used in order to find feasible solutions of the 2D problem for each leg separately Pseudospectral transcription (GPOPS-II) used in order to find the global multiphase solution I NITIAL G UESS 12

Optimisation 28 October 2014Alessandro Peloni Objective function: Endpoint constraints: Control vector: Derivatives: Automatic differentiation 13

Multiple NEO Rendezvous Mission: First Sequence (1/7) Mission parameters for 5 NEO rendezvous: Mission Duration: 10.8 years 28 October 2014Alessandro Peloni StartEndDuration [days] Transfer leg 1: Earth  2006 RH Dec Jul Transfer leg 2: 2006 RH 120  2000 SG Jan Nov Transfer leg 3: 2000 SG 344  2009 BD 12 May Aug Transfer leg 4: 2009 BD  2006 JY Dec Mar Transfer leg 5: 2006 JY 26  2005 QP Sep Oct

Multiple NEO Rendezvous Mission: First Sequence (2/7) 28 October 2014Alessandro Peloni15

Multiple NEO Rendezvous Mission: First Sequence (3/7) 1 st leg of the 5 NEO rendezvous mission 28 October 2014Alessandro Peloni Departing orbit Arrival orbit Transfer trajectory 16

Multiple NEO Rendezvous Mission: First Sequence (4/7) 2 nd leg of the 5 NEO rendezvous mission 28 October 2014Alessandro Peloni Departing orbit Arrival orbit Transfer trajectory 17

Multiple NEO Rendezvous Mission: First Sequence (5/7) 3 rd leg of the 5 NEO rendezvous mission 28 October 2014Alessandro Peloni Departing orbit Arrival orbit Transfer trajectory 18

Multiple NEO Rendezvous Mission: First Sequence (6/7) 4 th leg of the 5 NEO rendezvous mission 28 October 2014Alessandro Peloni Departing orbit Arrival orbit Transfer trajectory 19

Multiple NEO Rendezvous Mission: First Sequence (7/7) 5 th leg of the 5 NEO rendezvous mission 28 October 2014Alessandro Peloni Departing orbit Arrival orbit Transfer trajectory 20

Multiple NEO Rendezvous Mission: Second Sequence Mission parameters for 4 NEO rendezvous: Mission Duration: 8.5 years 28 October 2014Alessandro Peloni StartEndDuration [days] Transfer leg 1: Earth  2001 GP 2 18 Dec Sep Transfer leg 2: 2001 GP 2  2007 UN Apr Aug Transfer leg 3: 2007 UN 12  2009 YF 17 Jan Apr Transfer leg 4: 2009 YF  (99942) Apophis 03 Sep Jun

Multiple NEO Rendezvous Mission: Summary of results 28 October 2014Alessandro Peloni RequiredSequence 1Sequence 2 Mission duration Number of rendezvousAt least 3 Stay time [days] At least few days Rendezvous with PHOAt least 1 Rendezvous with NHATSAt least 1 Last objectH > 25.5 Characteristic acceleration [ mm/s 2 ] Total  v [ km/s ] // 22

Conclusions and Future work 28 October 2014Alessandro Peloni23

Space Thank you!