Breewood Stream Restoration Montgomery County Capital Improvement Project to Stabilize the Breewood Tributary November 14, 2012 Sligo Middle School.

Slides:



Advertisements
Similar presentations
Acton Quarry – Proposed Extension Natural Environment Pre-Submission Liaison Committee Information Session January 22, 2009.
Advertisements

Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Lolo Creek Watershed Project #
Washington Department
LOWER SALMON RIVER Tributary Protection and Enhancement.
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Protect and Restore Little Salmon River Project # Nez Perce Tribe Fisheries/Watershed Program By Chad Fealko.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
The role of tree planting in Watershed Restoration The role of tree planting in Watershed Restoration Floodplain restoration along with the control of.
Shoreline Master Program Update Shoreline Master Program Update: Process Overview City of Benton City August 30,
Joint Work Session Skagit County Planning Commission and Shoreline Advisory Committee May 22, 2012.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
When It Rains, It Drains An Overview of Pennsylvania’s New Storm Water Management Program.
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Living on the Edge Lake and River-Friendly Management for Waterfront Residents Elizabeth Riggs, Watershed Planner Huron River Watershed Council.
Potomac Ridge Stormwater Management Project
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
CITY OF SAN MARCOS/TEXAS STATE UNIVERSITY 2015 WORK PLAN BUDGETED CONSERVATION MEASURES.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
1 Floodplain Management Session 13 Biology Management and restoration of floodplain ecology Prepared by Susan Bolton, PhD, PE.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Northeast Corridor Greenway Acquisition City Council Workshop November 12, 2013.
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Watershed Update, Kahler, ECF, 6/26/2014. The Kahler Challenge.
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
West Virginia University Natural Stream Restoration Program An Interdisciplinary Program Focusing on Research, Education, and Professional Services in.
Indian Valley Meadow Restoration acre meadow located atop the Sierra Crest in Alpine County, CA. Headwaters of the Mokelumne River. Source for agricultural,
City of New Braunfels Edwards Aquifer and the Habitat Conservation Plan HCP Implementing Committee May 29,
Urban Stream Restoration Case Studies: Challenges and Opportunities Alabama Water Resources Conference September 6-7, 2012 Greg Jennings, Darrell Westmoreland,
Watershed Assessment and River Restoration Strategies
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Ian McBride Earth and Physical Science Department Western Oregon University Monmouth, Oregon
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Catoctin Creek: A Stream in Distress Catoctin Watershed Project A Partnership of County and Citizen Organizations.
Impacts of Land Development on Oregon’s Waters 2001.
Unimpaired connectivity between active channel and floodplain Eliminated connectivity between active channel and floodplain Impaired connectivity between.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Project Activity: Riparian Zone Restoration Scott Compton, Watershed Program Manager Valles Caldera National Preserve.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
CHAPEL HILL HIGH SCHOOL ISLAND PROJECT Water: The Essential Ingredient & Thoughts for Sustainability ©Town of Chapel Hill Stormwater Management Division.
How healthy is your watershed? Indicators and Performance Measures for the North Bay Kat Ridolfi San Francisco Estuary Institute North Bay Watershed Council.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Spokane River Riparian Enhancement Project at State Line.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Rapid Bioassessment Protocols for low gradient streams) for species richness, composition and pollution tolerance, as well as a composite benthic macroinvertebrate.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
Salmon-Safe: Peer-reviewed standards for the management of urban parks and natural areas Carrie Foss WSU Puyallup.
An Overview of our Community’s Stormwater Management Program
Bitter Creek Stream Restoration Preliminary Engineering Report Neighborhood Meeting.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
Crown expectations for small stream outcomes under FRPA
Integrating Wetlands and Watershed Management: Lessons from the U.S.
Challenges Facing Riparian Ecosystems
Anne Arundel County Maryland
John Tinger U.S. EPA Region IX
Stream Management Implementation Program Schoharie Watershed Advisory Committee Meeting October 24th, 2018.
Presentation transcript:

Breewood Stream Restoration Montgomery County Capital Improvement Project to Stabilize the Breewood Tributary November 14, 2012 Sligo Middle School

Introductions Doug Marshall Watershed Planner, Montgomery County Department of Environmental Protection (MCDEP) Jean Kapusnick Jean Kapusnick Watershed Restoration Engineer, MCDEP Mike Thompson Mike Thompson Project Consultant, Biohabitats Doug Streaker Doug Streaker Project Engineer, Biohabitats 2November 14, 2012

Project Background Project Background Project Goals Project Goals Existing Conditions Existing Conditions Proposed Conditions Proposed Conditions Example Projects Example Projects Restoration Monitoring Restoration Monitoring Schedule Schedule Questions QuestionsOutline 3November 14, 2012

Breewood Tributary (DA=57 ac, impervious cover=45%) Breewood Tributary (DA=57 ac, impervious cover=45%) County’s National Pollutant Discharge Elimination System (NPDES) monitoring watershed County’s National Pollutant Discharge Elimination System (NPDES) monitoring watershed Concentrated watershed effort Concentrated watershed effort Large sediment input to Sligo Creek Large sediment input to Sligo Creek Exposed infrastructure Exposed infrastructure Project Background 4November 14, 2012

Project Background - Location 5November 14, 2012

6 6 Land use changes in a watershed and along a stream corridor system, such as an increase in paved area, can results in impacts to stream structure and function. Project Background - Need November 14, 2012

7 7 Ecological restoration Ecological restoration  process of assisting the recovery of an ecosystem that has been degraded, damaged, or destroyed Stream restoration Stream restoration  threat to infrastructure  unable to ecologically recover from a degradation Habitat improvement Habitat improvement  Create diverse biological communities Project Goals November 14, 2012

8 8 Improve water quality Improve water quality Improve aquatic and terrestrial habitat Improve aquatic and terrestrial habitat Reduce stream channel bank and bed erosion Reduce stream channel bank and bed erosion Eliminate hazards to those who recreate near the stream Eliminate hazards to those who recreate near the stream Protect infrastructure and utilities Protect infrastructure and utilities Reconnect stream to floodplain Reconnect stream to floodplain Enhance riparian forest Enhance riparian forest Increase habitat diversity Increase habitat diversity Improve ground water recharge Improve ground water recharge Stormdrain outfall improvement Stormdrain outfall improvement Goals of Stream Restoration November 14, 2012

Existing Conditions 9November 14, 2012

10 Habitat enhancement Habitat enhancement  riffle/pool complex  riparian cover – shading and avian habitat  diverse and native plant communities, floodplain forested wetlands Stabilization channel bed and banks Stabilization channel bed and banks  raising channel invert and minimize bank erosion  protect Infrastructure  Reduce maintenance to outfalls and channel Increase Floodplain function Increase Floodplain function  reconnecting to floodplain Public engagement, education, and participation Public engagement, education, and participation Proposed Conditions - Approach November 14, 2012

Proposed Conditions 11November 14, 2012 Image of first rendering goes here

Proposed Conditions 12November 14, 2012 Image of second rendering goes here

Elevated stream bed – floodplain connection Elevated stream bed – floodplain connection Safe conveyance of large storm events Safe conveyance of large storm events Diverse habitat Diverse habitat Reduced sediment losses to Sligo Creek Reduced sediment losses to Sligo Creek No more canyon No more canyon Proposed Conditions 13November 14, 2012

Example Projects 14November 14, 2012

15 Restoration During Construction November 14, 2012

16 Restoration After Construction November 14, 2012

17 Restoration After Construction November 14, 2012

18 November 14, 2012 Stream Stability Stream Stability Bank Erosion Bank Erosion Aquatic insects Aquatic insects Fish Fish Vegetation Vegetation Restoration Monitoring

19 Site Survey Site Survey Natural Resources Inventory and Forest Stand Delineation – under review Natural Resources Inventory and Forest Stand Delineation – under review Forest Conservation Plan – under development Forest Conservation Plan – under development 60% design – draft, seeking input 60% design – draft, seeking input Schedule - Work Completed To Date November 14, 2012

20 Public Meeting – November 14, 2012 Public Meeting – November 14, % Design and apply for permitting – December % Design and apply for permitting – December 2012 Final Design – April 2014 Final Design – April 2014 Construction – October 2014 Construction – October 2014Schedule November 14, 2012

21 Questions? November 14, 2012

22  Non-Biting Midge  Diving Beetle  Damselfly Larvae  Backswimmers  Water Scorpion  Dragonfly Nymph  Phantom Midge  Water Strider  Swallows, Adult Dragonflies, Frogs Background-Mosquito Predators November 14, 2012