NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.

Slides:



Advertisements
Similar presentations
Question from the GDE : Could local “doughnut” type muon spoilers like those in SLC be substituted for the 5 meter magnetized wall? 5m magnetized wall.
Advertisements

M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
1 Vacuum Requirements in the Detector Region from Beam Gas and other Considerations Takashi Maruyama (SLAC) LCWA 2009, Albuquerque October 2, 2009.
Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Tom Markiewicz/SLAC Snowmass July 2001.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
NLC - The Next Linear Collider Project Discussion Detector Multiplicities & Timing Requirements Warm vs. Cold Tom Markiewicz SLAC ALCPG SLAC 8 January.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Simulations: Overview-what do we need J. C. Sheppard.
NLC - The Next Linear Collider Project IR Layout Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
Background Studies Takashi Maruyama SLAC ALCPG 2004 Winter Workshop January 8, 2004.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Tom Markiewicz/SLAC Snowmass 2001, 05 July 2001 LCD Meeting, 25 September.
LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.
CF Constraints to the Strawman BDIR Configuration Tom Markiewicz SLAC 07 January 2005 IR Hall Muon Wall Beam Dump Detector Photon Dump 4m tunnel with “Y”
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
Status of ongoing studies for comparing 2-mrad and 20-mrad IRs T. Maruyama SLAC.
SLC  Testbed Proposal Jeff Gronberg  working group SC Linear Collider Retreat June 26 – 29, 2002.
IR Beamline and Sync Radiation Takashi Maruyama. Collimation No beam loss within 400 m of IP Muon background can be acceptable. No sync radiations directly.
Beam Delivery, MDI related updates Andrei Seryi for BDS Area GDE/LCWS meeting at Bangalore March 10, 2006.
The Detector and Interaction Region for a Photon Collider at TESLA
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
NLC - The Next Linear Collider Project IR Geometries & Constraints on Forward Detectors Tom Markiewicz SLAC ALCPG SLAC 08 January 2004.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
NLC - The Next Linear Collider Project Linear Collider IR Options Tom Markiewicz / SLAC LC Workshop 2002, U. Chicago 07 January 2002.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Working Group D Backgrounds M Sullivan for everyone in WG D IRENG07 Sept 20, 2007.
NLC - The Next Linear Collider Project Machine-Detector Interface Tom Markiewicz LC R&D Opportunities, SLAC May 21, 2002.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
ILC-GDE Meeting Beijing Feb Effect of MDI Design on BDS Collimation Depth Frank Jackson ASTeC Daresbury Laboratory Cockcroft Institute.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
L. Keller 3/18/02 Beam-Gas-Bremsstrahlung and Coulomb Scattering in the NLC Beam Delivery System Conditions for Calculation: 1. Program is DECAY TURTLE.
Feb 7, 2006S. Kahn -- Muon Collider Detector Backgrounds 1 Detector Backgrounds in a Muon Collider Steve Kahn Muons Inc. LEMC Workshop.
MDI Simulations at SLAC Takashi Maruyama, Lew Keller, Thomas Markiewicz, Uli Wienands, SLAC MAP Collaboration Meeting, FNAL June 21, 2013.
Dark Current in ILC Main Linac N.Solyak, A.Sukhanov, I.Tropin ALCW2015, Apr.23, 2015, KEK LCWS'15, Tsukuba, 04/2015Nikolay Solyak1.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
AD&I Meeting 23/6/10 Jim Clarke
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M. Sullivan Apr 27, 2017 MDI meeting
Large Booster and Collider Ring
AD & I : BDS Lattice Design Changes
ILC Baseline BDS Collimation Depth Calculations
Constraints on Working with Two IRs
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
Tony Hill Lawrence Livermore National Laboratory
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
Hongbo Zhu (IHEP, Beijing) On behalf of the CEPC Study Group
Interaction Region Design Options e+e- Factories Workshop
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Higgs Factory Backgrounds
Simulation of Neutron Backgrounds in the ILC Extraction Line Beam Dump
S.Kuroda ( KEK ) Final Focus Optics Collimeter Final Doublet
NLC 2001 Beam Delivery Layout
The Effects of Beam Dynamics on CLIC Physics Potential
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003

Tom Markiewicz NLC - The Next Linear Collider Project Outline Pair Background Energy Conservation –What is getting hit? Backgrounds at Machine Startup –John Jaros asks: What if the machine is 1000x worse than you expect? –A first look…. Muon Background Update –Study by TRC Collimation Task Force sets apertures and calculates source terms –Lew Keller makes & transports muons to the detector wit & without tunnel-filling toroids

Tom Markiewicz NLC - The Next Linear Collider Project Pair Refresher Course At 500 Gev w/ NLC beam parameters: 49.2K e- per =4.05 GeV 200 TeV Total 0.37mWatts per side

Tom Markiewicz NLC - The Next Linear Collider Project Pairs Lost on Lum and QDF1

Tom Markiewicz NLC - The Next Linear Collider Project Pair Energy Flow Remaining 81.7% of pairs convert into photons and are absorbed by masks & calorimeters

Tom Markiewicz NLC - The Next Linear Collider Project Collimation System Designed to Make Detector Free of Machine Backgrounds E=250 GeV N=1.4E12 0.1% Halo distributed as 1/X and 1/Y for 6<A x <16  x and 24<A y <73  y with  p/p=0.01 gaussian distributed

Tom Markiewicz NLC - The Next Linear Collider Project SR at IP due to Halo X (cm) Y Log10(E) (GeV) Quad Bend .3 Ne- =4.8 MeVQuad Bend

Tom Markiewicz NLC - The Next Linear Collider Project X-Y at Spoiler #3  30  m x  25  m 6  x <A x <16  x 24  y <A y <73  y  60  m x  50  m 12  x <A x <32  x 48  y <A y <146  y

Tom Markiewicz NLC - The Next Linear Collider Project Loss Distribution in “Worst Case” Scenario E=250 GeV N=1.4E12 0.1% Halo distributed as 1/X and 1/Y for 2*6<A x <2*16  x and 2*24<A y <2*73  y with  p/p=0.01 gaussian distributed AND SP/AB/DP x2-x3

Tom Markiewicz NLC - The Next Linear Collider Project Worst Case Ray Distribution at Spoiler#1

Tom Markiewicz NLC - The Next Linear Collider Project SR at IP in “1000x worse case” SR distribution ~2x wider in y at IP with direct hits unless BP >1.25cm

Tom Markiewicz NLC - The Next Linear Collider Project NLC Beam Delivery thru 1999 Protect via distance and “Big Bend” Currently 3x shorter & No Bend

Tom Markiewicz NLC - The Next Linear Collider Project Layout of Spoilers, Absorbers & Protection Collimators Betatron Betatron Cleanup Energy FF

Tom Markiewicz NLC - The Next Linear Collider Project Calculated Beam Loss: Input to MuCarlo

Tom Markiewicz NLC - The Next Linear Collider Project 9 & 18m Toroid Spoiler Walls 4.5m 0.6m 2cm BB 170 Tons/m Design Constraints: Minimize gap & minimize stray field in beampipe

Tom Markiewicz NLC - The Next Linear Collider Project First 100 Muons from PC1 of HEIR beamline that reach z=0 IR1 line has 9m & 18m magnetized walls NO 18m wall in IR2 lineIR2 line has 18m wall Somewhat arbitrary Goal: 10 muons / detector / train (from both e-,e+ systems)

Tom Markiewicz NLC - The Next Linear Collider Project Muon Yield For 250 GeV p  >1 GeV/c  /e = 5 x Yield scales with beam energy

Tom Markiewicz NLC - The Next Linear Collider Project Muon rate in detector ~1000x design goal before adding spoiler walls 4.4E-6 Muons/Scraped e- ** Assumed Halo 1E-3

Tom Markiewicz NLC - The Next Linear Collider Project Distributions with No Spoilers at 250 Gev/ Beam Muon HCAL ECAL Tunnel

Tom Markiewicz NLC - The Next Linear Collider Project 18m Wall Downbeam of all sources reduces rate by x30 25% from E coll (recall pessimistic 1% spread!) 75% from Betatron coll

Tom Markiewicz NLC - The Next Linear Collider Project Donut Toroid Muon Attenuators Well defined source locations followed by at least 5m of free space (at 250 GeV/beam) may be serviced by devoted attenuators –Nice if there is a dipole between the source and the donut Lattice does not always permit this –NLC betatron collimation system has space for 6 5m-long attenuators (SP2/AB2,PC1,SP3/AB3/PC2,PC3,SP4/AB4/PC4,PC5/SP5/AB5) –NLC energy collimation region has no space NLC MuCarlo study uses 120cm diameter donut toroids JLC advocates double donut TESLA uses single donut

Tom Markiewicz NLC - The Next Linear Collider Project Donuts reduce Muon rate from Betatron Region rate by x8

Tom Markiewicz NLC - The Next Linear Collider Project Additional 9m Wall reduces Betatron  rate by x50 and E Coll  rate by x100

Tom Markiewicz NLC - The Next Linear Collider Project Distributions with 2 Spoilers at 250 Gev/ Beam Muon HCAL ECAL Tunnel

Tom Markiewicz NLC - The Next Linear Collider Project Radiation Safety Aspect of Collimator System Muons Can you occupy IR2 when IR1 is running? Can you occupy IR1 when IR2 is running? Last studied for 2001 BD model with shared collimation An issue whenever IR2 “sees” IR1 collimators NO 18m wall in IR2 lineIR2 line has 18m wall

Tom Markiewicz NLC - The Next Linear Collider Project Muon Dose Rates in IR1 and IR2 when other IR has beam 1.0 TeV CMNo Spoiler18m Mag z=321m SourceHaloIR1 ( mr/hr) IR2 ( mr/hr) IR1 ( mr/hr) IR2 ( mr/hr) Total for 2 beams Total for 2 GeV If do nothing and halo=10 -3, dose is 10-20x SLAC 0.5 mrem limit 18m mag spoiler buys you x20 to 40; IR2 looks OK in any event Max credible accident only dumps 10 3 more beam, limit is 50E3 higher SLAC Rad Safety Rules: –0.5 mrem/hr for normal operation –25 rem/hr (3 rem max dose) for max credible accident Run MUCARLO and find maximum dose rate in any 80cmx80cm area Simultaneous Occupation OK if Magnetized Wall Is Present

Tom Markiewicz NLC - The Next Linear Collider Project Conclusions on Muons Unless the beam halo loss rate is ~10 -6, all collimator designs will need some combination of magnetized spoilers to reduce the muon flux For the case of the NLC design it appears that two magnetized walls serve the purpose. At least one wall per IR per side may be required for personnel protection Current plan is to leave space for the caverns that would enclose these walls but to not install until measurements of halo and muon production sources indicate it is necessary. Judicious use of point muon attenuators may be useful