Defense Waste Processing Facility 257 Actual Canisters Produced in FY05 37% Waste Loading (averaged for FY05) 1,995 Total Canisters Produced (as of the10/31/05.

Slides:



Advertisements
Similar presentations
Learner-Centered Education Course Redesign Initiative Builds upon work of prior LCE grants Will award grants of $40,000 - $50,000, with the option.
Advertisements

Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Repository Analysis Review NSNFP Strategy Meeting Washington, DC Henry Loo April 2009.
DOE’s Plutonium Disposition Infrastructure with a Focus on the Savannah River Site Tom Clements Adviser to the South Carolina Chapter of the Sierra Club.
Projectizing an Operating
Liquid Waste Organization
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
January 6. January 7 January 8 January 9 January 10.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Hanford Spent Nuclear Fuel Status Presented by Sen Moy National SNF Strategy Meeting April 14,
FY14 Budget and Caseload Update Fiscal Committee January 6, 2014.
Title III National Professional Development (NPD) Program Grantee Performance Reporting: A Webinar for FY2011 and FY2012 Grantees February 28, 2013 Prepared.
PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted /
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Research Online The University’s online research repository ro.uow.edu.au 21 June 2006.
1 Waste Management David Nickless Environmental Management Los Alamos Field Office March 3, 2015.
Savannah River Site Status Report DOECAP Analytical Services Program 2014 Workshop Ken Guay, (DOE SR Program Manager) September , 2014 Albuquerque,
1 Given the following data, compute the tracking signal and decide whether or not the forecast should be reviewed.
Team Member(s) Your name. 25 January SOLD: BUY: Copy of stock pdf.
1 Transportation Alternatives Program FY2015 Application Update February 19, 2014 Jennifer DeBruhl Director, Local Assistance Division.
Presentation for Semi-Annual National Spent Nuclear Fuel Meeting April 14, 2005 Sen Moy, DOE-RL Hanford Spent Nuclear Fuel.
U. S. Department of Energy West Valley Demonstration Project 18096_1 HLW Project Status Bryan Bower, DOE WVDP Denis Koutsandreas, DOE EM HQ Ron Farchmin,
FAFSA Collective Impact Initiative Professional Learning Community January 13, 2015.
FY14 Budget and Caseload Update Fiscal Committee March 3, 2014.
Hanford Spent Nuclear Fuel and Cesium/Strontium Capsule Status Presented by Sen Moy - RL National SNF Meeting November 8, 2005.
Slide 1 DOJ Settlement Agreement – 10 Year Summary January 24, 2013 As of February 24, 2015 Total Cost 1 $2.4 Billion$2.5 Billion GF Share of the Cost$1.2.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
1 Given the following data, calculate forecasts for months April through June using a three- month moving average and an exponential smoothing forecast.
1 Construction of Salt Waste Processing Facility (SWPF) Charting the Course for Major EM Successes in September 29, 2015 Frank.
89 th Annual Meeting & Exposition March 21 – 24, 2010 Denver, Colorado Avoid Being a Case Study: How to Make the Right eProcurement Decisions Now.
L. David Glatt North Dakota Department of Health Environmental Health Section.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Weather Responsive Traffic Management Program ROEMER ALFELOR Federal Highway Administration T3 Webinar March 6, 2014.
Pretest Workshop February, 2007 Scott Norton Louisiana Department of Education.
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
1 Financial update Preliminary FY13 September Results: –HHC September Operating Margin: ($11.6M) Year to Date Operating Margin: ($25.4M) –MS September.
SunSatFriThursWedTuesMon January
Solving Cleanup Challenges Through Risk Reduction EM/RW Quality Assurance Activities Office of Standards and Quality Assurance (EM-64) April 15, 2009.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
Manure Wastewater Handling & Storage Summary CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
The National Grants Partnership March 11, 2008 Michael Pellegrino
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
1 1 Texas Nodal Program Update April 22, 2008 David Hackett, Nodal EMS PM Apr 22, 2008 Nodal EMS Update.
Briefing M&E Parliamentary Portfolio Committee: Radioactive Waste Management Policy and Strategy.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 2/26/15 Asish Gautam Demand Analysis Office Energy Assessments Division.
South Carolina Nuclear Advisory Council SRS Update and FY 2017 Budget Service ● Safety ● Security ● Stewardship ● SRNL ● Sustainability April 14, 2016.
FAEC DATA Act Working Group May 8, 2017
Department of Environmental Quality
Deadline for Requisitions Payment Processing Date
Waste Confidence/Continued Storage – Status Update
EnMS Management Review
DAG Chapter 4 Systems Engineering Design Considerations
Low Level Radioactive Waste Forum, Fall 2014 Meeting
EFCOG Startup and Commissioning Task Team Introduction
Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI)
Upper Snake Reservoir Operations October 13, 2015
Radioactive Waste Processing at the Savannah River Site
CCSP/SOURCE and EVV Update
Food Rescue – It’s What We Do…
West Valley Demonstration Project Status Update
Texas A&M Industrial Engineering
Aspiring Principals May 7,2013.
Julie Woosley, Division of Waste Management
Integrated National Reporting System of Radioactive Waste Management in Indonesia (SALT) By developing SALT reporting system, BAPETEN will be able to control.
FY14 Q1 Forecast Review Meeting July 2013
Northeast High-Level Radioactive Waste Transportation Task Force
Developments in Connecticut
Thing / Person:____________________ Dates:_________________
Session 4: Finalize Project Working Arrangements
Budget Update April 29, 2019.
Presentation transcript:

Defense Waste Processing Facility 257 Actual Canisters Produced in FY05 37% Waste Loading (averaged for FY05) 1,995 Total Canisters Produced (as of the10/31/05 start of an ongoing DWPF outage) Sludge Batch 3 began feeding to DWPF in April 2004 and is expected to last to March 2007 Sludge Batch 4 forecast ready date is January 2007 and is expected to serve as feed to DWPF through March 2009

Glass Waste Storage Building #2 (as of 10/21/05)

Issues and Challenges Availability of federal repository Completion of NDAA Section 3116 process Salt Processing Tank Closure Re-design of SWPF based on DOE decision to implement additional requirements Reassessment of interim salt strategy