14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
8-Nov-06 GDE Valencia Global Design Effort 1 MDI Related Potential Design Changes Barry Barish Caltech / GDE 8-Nov-06.
11-Nov-06 ILCSC - Valencia Global Design Effort 1 GDE Report and Discussion of Costs Barry Barish Caltech / GDE 6-Nov-06.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
7-March-07 ILC-fest Fermilab Global Design Effort 1 International Linear Collider Barry Barish 7-March-07.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
1 ILC Internal Cost Review Major Points from External Reviewers T. Elioff, J. Marx, V. Soergel, M. Yoshioka, and A. Yamamoto, (C. Wyss, absent) To be presented.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
04-Feb-07 GDE/ACFA Intro Beijing Global Design Effort 1 GDE Status Barry Barish 4-Feb-07.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
ILC Global Design Effort Barry Barish GDE 9-March-06.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
19july06 - Vancouver L.C. Workshop - DCB (PHG) Global Design Effort 1 Report from the Design & Cost Board Peter H. Garbincius* on behalf of: Wilhelm Bialowons*,
Oct 22 Group Leaders Planning meeting
Accelerator Physics Technical System Group Review
ILC Global Design Effort
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06

14-Dec-06 RDR Internal Cost Review Global Design Effort 2 Objectives of this Review Begin validation process for the RDR Costing This is an “internal review,” operating under cost confidentiality rules. –It is the first exposure of costing beyond those doing the costing a their particular area; only the cost engineers and myself have seen totals. –Both “internal” and “external reviewers” – internal to give depth to the review, and external to provide outside perspective on our approach, methodology and initial costing First some context, mainly for external reviewers

14-Dec-06 RDR Internal Cost Review Global Design Effort 3 ILC Overall Timeline Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Technical Design Expression of Interest to Host International Mgmt ….

14-Dec-06 RDR Internal Cost Review Global Design Effort 4 Parameters for the ILC E cm adjustable from 200 – 500 GeV Luminosity  ∫ Ldt = 500 fb -1 in 4 years Ability to scan between 200 and 500 GeV Energy stability and precision below 0.1% Electron polarization of at least 80% The machine must be upgradeable to 1 TeV

14-Dec-06 RDR Internal Cost Review Global Design Effort 5 The First Step – Create a Baseline

14-Dec-06 RDR Internal Cost Review Global Design Effort 6 The Baseline Configuration Document Summary-like overview for those who want to understand the choice and the why Technical documentation of the baseline, for engineers and acc. phys. making studies towards RDR

14-Dec-06 RDR Internal Cost Review Global Design Effort 7 The Baseline Machine (500GeV) not to scale ~30 km e+ 150 GeV (~1.2km) x2 R = 955m E = 5 GeV RTML ~1.6km ML ~10km (G = 31.5MV/m) 20mr 2mr BDS 5km

14-Dec-06 RDR Internal Cost Review Global Design Effort 8 Baseline to a RDR Jan JulyDec 2006 Freeze Configuration Organize for RDR Bangalore Review Design/Cost Methodology Review Initial Design / Cost Review Final Design / Cost RDR Document Design and CostingPreliminary RDR Released FrascatiVancouverValencia

14-Dec-06 RDR Internal Cost Review Global Design Effort 9 ICFA FALC Resource Board ILCSC GDE Directorate GDE Executive Committee Global R&D Program RDR Design Matrix GDE R & D Board GDE Change Control Board GDE Design Cost Board GDE RDR / R&D Organization RDR Management Group

14-Dec-06 RDR Internal Cost Review Global Design Effort 10 Baseline to a RDR Jan JulyDec 2006 Freeze Configuration Organize for RDR Bangalore Review Design/Cost Methodology Review Initial Design / Cost Review Final Design / Cost RDR Document Design and CostingPreliminary RDR Released FrascatiVancouverValencia

14-Dec-06 RDR Internal Cost Review Global Design Effort 11 RDR Cost Estimating 500 GeV BCD machine + “essentials” for 1 TeV Follow ITER “Value” & CERN “CORE” model for International Projects –Provides basic agreed to costs [common “value” + in- house labor (man-hr)] RDR will provide information for translation into any country’s cost estimating metric, e.g. Basis of Estimate => contingency estimate, in-house labor, G&A, escalation, R&D, pre-construction, commissioning, etc. Assumes a 7 year construction phase

14-Dec-06 RDR Internal Cost Review Global Design Effort 12 Based on a call for world-wide tender: lowest reasonable price for required quality Classes of items in cost estimate: –Site-Specific (separate estimates for each site) –Conventional – global capability (single world est.) High Tech – cavities, cryomodules, regional estimates Cost Engineers determine how to combine and present multiple estimates WBS ; WBS Dictionary; Costing Guidelines are mature enough – RDR cost estimating ILC Cost Estimate

14-Dec-06 RDR Internal Cost Review Global Design Effort 13 Baseline to a RDR Jan JulyDec 2006 Freeze Configuration Organize for RDR Bangalore Review Design/Cost Methodology Review Initial Design / Cost Review Final Design / Cost RDR Document Design and CostingPreliminary RDR Released FrascatiVancouverValencia

14-Dec-06 RDR Internal Cost Review Global Design Effort 14 Technical Systems Vacuum systems Magnet systems Cryomodule Cavity Package RF Power Instrumentation Dumps and Collimators Accelerator Physics Global Systems Commissioning, Operations & Reliability Control System Cryogenics CF&S Installation Area Systems e- e+ damping RTML main BDS source source rings linac Cost Roll-ups

14-Dec-06 RDR Internal Cost Review Global Design Effort 15 Vancouver Cost Data

14-Dec-06 RDR Internal Cost Review Global Design Effort 16 Baseline to a RDR Jan JulyDec 2006 Freeze Configuration Organize for RDR Bangalore Review Design/Cost Methodology Review Initial Design / Cost Review Final Design / Cost Design and Costing Preliminary RDR Released FrascatiVancouverValencia

14-Dec-06 RDR Internal Cost Review Global Design Effort 17 Optimizing Cost to Performance RDR MBCCB 2  14mr IRs supported central injectorssupported Removal of service tunnelrejected conventional e+ sourcerejected RF unit modifications (24  26 cav/klys) supportedsubmitted reduced RF in DR (6  9mm  z ) supportedin prep DR race-track lattice (CFS)supportedin prep reduced static cryo overheadsupportedin prep removal linac RF overheadsupportedin prep single-stage bunch compressorrejected e- source: common pre-acceleratorsupportedin prep

14-Dec-06 RDR Internal Cost Review Global Design Effort 18 Evolving Design  Cost Reductions Since Vancouver

14-Dec-06 RDR Internal Cost Review Global Design Effort 19 Vancouver Costs for BDS Cost drivers –CF&S –Magnet system –Vacuum system –Installation –Dumps & Collimators Total Cost Additional costs for IR20 and IR2

14-Dec-06 RDR Internal Cost Review Global Design Effort 20 2/20 mrad  14/14 mrad Motivation –Reduce costs 2 mrad beam line expensive, risky, especially extraction line Common collider hall –Advantages Improved radiation conditions in the extraction lines Better performance of downstream diagnostics Easier design and operation of extraction optics and magnets Reduced back scattering from extraction line elements –Disadvantages Impact on physics (appears minor at present). Simpler incoming beam optics R&D on small crossing angles will continue as alternative

14-Dec-06 RDR Internal Cost Review Global Design Effort 21 Plans until Beijing (Feb. '07) NovemberDecemberJanuaryFebruary Valencia Further cost consolidation CCR preparation & submission Cost & Design Freeze 30/11 Prepare for Full Cost Review SLAC Cost Review 14-16/12 MAC 10-12/01/07 Final cost corrections and documentation Agency cost briefings Beijing: RDR draft published RDR final editing RDR prepare 1 st drafts

14-Dec-06 RDR Internal Cost Review Global Design Effort 22 Freeze the Design Summary RDR Costs Total Value Cost $4.65B Shared + $1.67B Host manhours (in-house labor) RDR Design Freeze

14-Dec-06 RDR Internal Cost Review Global Design Effort 23 ILC 14/14 mr

14-Dec-06 RDR Internal Cost Review Global Design Effort 24 The Baseline Machine (500GeV) not to scale ~30 km e+ 150 GeV (~1.2km) x2 R = 955m E = 5 GeV RTML ~1.6km ML ~10km (G = 31.5MV/m) 20mr 2mr BDS 5km

14-Dec-06 RDR Internal Cost Review Global Design Effort 25 ILC Value – by Area Systems Main Cost Driver

14-Dec-06 RDR Internal Cost Review Global Design Effort 26 ILC Value – by Global & Technical Systems Main Cost Driver

14-Dec-06 RDR Internal Cost Review Global Design Effort 27 Integrated Cost-Schedule No integrated cost/schedule yet; but it looks feasible to develop a realistic profile

14-Dec-06 RDR Internal Cost Review Global Design Effort 28 Charge for MAC Review On Wednesday 10, Thursday 11 and Friday 12 (until noon) January 2007, there will be an ILC MAC meeting at the Cockcroft Institute, Daresbury, UK. The major item for the meeting is the ILC cost and overall design, with specific MAC tasks: –Review the soundness of the overall RDR concept, identify any areas of concern, note what R&D is still needed, and comment on whether the performance parameters can be met. –Review the cost methodology and identify any areas of concern. This will be the first occasion at which costs will be presented outside of the GDE.

14-Dec-06 RDR Internal Cost Review Global Design Effort 29 What Happens after Beijing? Public Release of Draft RDR and Preliminary Costing at Beijing –Cost Reviews, etc –Finalize RDR by Summer 2007? Enter into Engineering Design Phase –Planning underway internally –Design will evolve through value engineering and R&D program –General Goal is to have Construction Proposal ready by 2010

14-Dec-06 RDR Internal Cost Review Global Design Effort 30 Proposed RDR Review Process

14-Dec-06 RDR Internal Cost Review Global Design Effort 31 ILCSC Review Proposal The GDE is purposefully constituted as a tri-regional design team whose goal is to produce by 2009 a Technical Design Report (TDR) which will contain a detailed, engineering-based design and cost for the ILC. The initial step towards the TDR was to establish a Reference Design Report (RDR) which will define a self-consistent set of ILC design parameters and associated implementation scope. The RDR also contains an initial estimate of cost at the 20% level which is mostly parametric in nature. This initial cost estimate is at sufficient detail to permit a) trend analysis for cost reduction/optimization and b) give guidance for the R&D and industrialization that must accompany the engineering design process of the TDR.

14-Dec-06 RDR Internal Cost Review Global Design Effort 32 ILCSC Cost Review Guideline An international team should be convened prior to completion of the RDR to review those aspects of the RDR cost estimate that strongly influence the TDR. Given the intermediate nature of the RDR estimate as discussed above, it would seem premature to review in detail every aspect of an ILC cost estimate. Rather this review team should: –review cost trends and relative costs of sub-systems as they relate to potential scope changes to be incorporated in the TDR –review cost trends and relative costs of sub-systems and comment on their relevance to the R&D program needed to complete the TDR –review the methodology used in the estimate to ensure that it is appropriate for establishing an accurate TDR cost assessment. Evaluate that the method and format of estimation can serve the needs of regional authorities as they develop plans for potential involvement as partners in the ILC

14-Dec-06 RDR Internal Cost Review Global Design Effort 33 Summary & Final Remarks Status of Value Costing –First costing available at Vancouver (July06) –Cost to performance optimization Status & Plans for design modifications –Several proposals accepted and some rejected –Changes having physics impact considered at Valencia –Complete RDR and Public Release – Beijing (Feb) –Reviews / Modifications to RDR / Costs until summer Final RDR Approved by ICFA in July. Engineering Design phase (EDR) commences

14-Dec-06 RDR Internal Cost Review Global Design Effort 34 Charge for this Review Internal Reviewers –Assess the level of correctness and consistency of the estimates across the groups; –Identify either missing information, or lack of sound basis of estimate as presented (with a view to future more formal external reviews); –Identify inconsistencies and errors with respect to the Area System information and cost roll-ups (Area System representative specific); To produce an overall evaluation of the complete ILC value estimate based on the –Information presented and advise the Director and Cost Engineers accordingly; To identify action items to be completed before the MAC review in January 2007.

14-Dec-06 RDR Internal Cost Review Global Design Effort 35 Charge for this Review External Reviewers –Identify areas where the cost estimates appear weak or where the justification is considered insufficient for scrutiny during future formal cost reviews by funding agencies; –Identify costs which appear inconsistent with other projects they have been involved with (where applicable); • critically review the standards of cost estimation; • advise the Director and Cost Engineers of possible measures to improve both the accuracy and validity of the estimates. We propose the external reviewers have a closed session with the GDE Director and Cost Engineers on the last day and then an outbriefing to all involved in the review.