ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.

Slides:



Advertisements
Similar presentations
ISTISNA’.
Advertisements

2-105(1) "Goods" means all things (including specially manufactured goods) which are movable at the time of identification to the contract for sale other.
VISION & MISSION OF KeNHA VISION : Quality, safe and adequate National Road Network. MISSION : Provide quality National Road Network for sustainable social.
Contracts – important issues
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
Secured Transactions UCC Title 9. Security Interest An interest in personal property or fixtures that secures payment or performance of a obligation.
WHAT IS A CONTRACT ? Agreement enforceable by law
Contract Performance, Breach and Remedies Chapter 9.
© 2007 Prentice Hall, Business Law, sixth edition, Henry R. Cheeseman Remedies for Breach of Sales and Lease Contracts.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
‘CHANGES IN LAW’ Contractual Provision September, 2012 Topic for discussion Business Confidential Foster Wheeler Iberia/Chile Sep/2012.
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
Default and Enforcement. 2 Enforcement: Cumulative Remedies Proceed under non-UCC law, and satisfy a judgment out of almost any asset the Debtor owns;
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Unit 13 Positive Malperformance
1 How to Write an Incremental Funding Modification Sarah Echt May 2004.
Contracts: Third Party Rights, Discharge, Breach and Remedies Chapter 10.
Time for a new standard - AS General Conditions of Contract
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
The Islamic University of Gaza Engineering Faculty
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
Including Issues When the Right of Return Exists
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Contract Law for Paralegals: Traditional and E-Contracts © 2009 Pearson Education, Upper Saddle River, NJ All rights reserved Remedies for Breach.
INTERNATIONAL SALES LAW - seminar 2004 ISL Contractual Risk Management in Transnational Sales Transactions ISL: objectives, functions and structure Management.
Contract price & payment
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
1 IMPLIMENTATION OF CONTRACT CLAUSES Presentation by SRI. S. SREEKUMAR GM(ENGG), NER Dt
FIDIC Conditions of Contract for Construction
AN INTRODUCTION TO FIDIC CONDITIONS OF CONTRACT PART (I) FOR E. P. C
Center of Islamic Finance COMSATS Institute of Information Technology Lahore Campus 1 Adopted from open source lecture of Meezan Bank. Customized for best.
CONSTRUCTION ADMINISTRATION Project Closeout Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
Compensation events and claims Presented by Prof. Khem Dallakoti.
CONSTRUCTION CONTRACTS – MASTER CHART
1 Analyisis application Incoterms EXW – Ex Works General notes  The seller delivers the goods at the moment that he places the goods at the disposal.
1 Ⅴ. General Articles Ⅵ. Transfer Article 29 Extension of Expiry Date or Last Day for Presentation Article 30 Tolerance in Credit Amount, Quantity and.
The contract of Sale Commercial Law.
Chapter 4.  When one party breaks the contract by refusing to perform his promise, the breach of contract take place. The following remedies are available.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
Why Bond Forms Matter… A Practical Guide to Better Bonding Presenters: Joanne S. Brooks, Esq., Vice President and Counsel, The Surety and Fidelity Association.
CONTINUATION SA REPORT NI TAHNEE. ELEMENTS OF CONTRACTS.
Chapter – 3 setoff and carry forward of losses
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Eastern Mediterranean University BANK406 Corporate Banking Law and Practice CHP 6.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
COMMERCIAL LAW 1 Purchase contract Definition Seller undertakes to deliver to purchaser a thing and to allow the purchaser to acquire the ownership title.
COMMERCIAL LAW 1 Purchase contract Definition Seller undertakes to deliver to purchaser a thing and to transfer to purchaser ownership title to such thing;
Eastern Mediterranean University
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
REMEDIES FOR BREACH OF SALES AND LEASE CONTRACTS
Extension of time and how it is granted to a contractor (Referencing JCT 2005)
Chapter 20 Remedies for Breach of Sales and Lease Contracts
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
ارائه دهنده : آمنه هادی پور
THE EMPLOYER Right, of access to the site.
Find the Problems with the Provisions May 11, 2016 Presented By:
Mandate Contract Specific work contract construction works contract
REMEDIES FOR BREACH OF SALES AND LEASE CONTRACTS
Construction Contract Administration Presentation of chapter four at FIDIC ( The Contractor ) Prepared By : Jomah M. AL-Najjar Instructor : Dr. Kamalain.
Public works contract Clauses 10.5 & 11.5 Explored
EMPLOYER’S RIGHTS – COMMON LAW AND CONTRACTUAL DETERMINATION PROCEDURE
Construction Contract Administration
Presentation transcript:

ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11

11.1 Completion of Outstanding Work and Remedying Defects  In  In order that the works and contractor‘s documants, and each section, shall be in the condition required by the contract :

11.1 Completion of Outstanding Work and Remedying Defects (a) Complete any work which is outstanding on the date stated in a Taking-Over certificate according to reasonable time determined by the Engineer (b) Execute all work required to remedy defects as may be notified by the employer on or before the expiry date of the defects notification period

11.1 Completion of Outstanding Work and Remedying Defects  If a defect appears or damage occurs, the contractor shall be notified accordingly by the employer

All work referred to (11.1-b) shall be executed at the risk and cost of the contractor if it is attributable to:  Any design for which the contractor is responsible  Plant, materials or workmanship not being in accordance with the contract  Failure by the contractor to comply with any other obligation 11.2 Cost of Remedying Defects

If and to the extent that such work is attributable to any other cause, the contractor shall be notified promptly by the employer according to variation procedure sub-clause 11.2 Cost of Remedying Defects

The employer shall be entitled to an extension of the defects notification period for the works, section or a major item of plant cannot be used for the purposes for which they are intended by reason of a defect or damage However, notification period shall not be extended by more than two years 11.3 Extension of Defects Notification Period

If delivery and/or erection of plant and/or materials was suspended, the contractor’s obligation shall not apply to any defects occurring more than two years after the defects notification period 11.3 Extension of Defects Notification Period

If the contractor fails to remedy any defect or damage within a reasonable time, a date may be fixed by the employer The contractor shall be given reasonable notice of this date 11.4 Failure to Remedy Defects

If the contractor fails to remedy the defect by this notified date, the employer may: (a)Carry out the work himself or by others, in a reasonable manner and at the contractor’s cost, and the contractor shall pay to the employer the costs reasonably incurred by the employer 11.4 Failure to Remedy Defects

(b) Require the engineer to agree or determine a reasonable reduction in the contract price (c) If the defects deprives the employer of substantially the whole benefit of the works or any major part of the works, terminate the contract as the whole or the part which can not be used. Employer shall then be entitled to recover all sums paid for the works or for such part 11.4 Failure to Remedy Defects

If the defect or damage cannot be remedied on the site and the employer gives consent, the contractor may remove from the site for the purposes of repair such items of damaged plant If the defect or damage cannot be remedied on the site and the employer gives consent, the contractor may remove from the site for the purposes of repair such items of damaged plant This consent may require the contractor to increase the amount of the performance security This consent may require the contractor to increase the amount of the performance security 11.5 Removal; of Defective Work

If the work of remedying of any defect may affect the performance of the works, the engineer may require the repetition of any of the tests described in the contract The requirement shall be made by notice within 28 days after the defect is remedied These tests shall be carried out in accordance with the terms applicable to the previous tests 11.6 Further Tests

Until the performance certificate has been issued, the contractor shall have such right of access to the works as is reasonably required in order to comply with this clause 11.7 Right of Access

The contractor shall, if required by the engineer, search for the cause of any defect Unless the defect is to be remedied at the cost of the contractor, the cost of the search plus reasonable profit shall be agreed or determined by the engineer 11.8 Contractor to Search

Performance of the contractor’s obligation shall not be considered to have been completed until the engineer has issued the performance certificate to the contractor 11.9 Performance Certificate

The engineer shall issue the performance certificate within 28 days after the latest of the expiry dates of notification periods, or as the contractor has supplied all the contractor’s documents and completed and tested all the works The performance certificate shall be as an acceptance of the work 11.9 Performance Certificate

After the performance certificate has been issued, each party shall remain liable for the fulfillment of any obligation which remains unperformed at that time Unfilled Obligations

Upon receiving the performance certificate, the contractor shall remove any remaining contractor’s equipment, material, temporary works and so on from the site If all these items have not been removed within 28 days after receiving a copy of the performance certificate, the employer may sell or dispose of any remaining items Clearance of Site

The employer shall be entitled to be paid the costs due to sale or disposal Any balance of the moneys from the sale shall be paid to the contractor If these moneys are less than the employer’s costs, the contractor shall pay the outstanding balance to the employer Clearance of Site

الحمد لله رب العالمين Thank You الحمد لله رب العالمين Thank You