NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.

Slides:



Advertisements
Similar presentations
October 7, 2013 QMWG Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Concerns with RUC Capacity Short Charge and Energy Trades.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Item 8, Technical Advisory Committee Meeting April 8, 2010.
Day Ahead Market Working Group April 7, Agenda March 31 minutes DAM Feasibility Study - Questions? Coral Proposal - Discussion Generators and.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
NPRR 617 Overview and Justifications. Overview Current protocols place restrictions on Day-Ahead Three-Part Supply Offers – Part 1 (Startup Offer) – capped.
Severe Winter Weather Resource Outage Analysis Chad Thompson Operations Working Group September
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
1 Nodal Stabilization Market Call December 03, :30 PM.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Ancillary Services Replacement
Reliability Unit Commitment Discussion with QMWG
Cutover Market Call November 29, :30 PM
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Ancillary Service Trades and Ancillary Service Settlement
Representing Rainbow Energy Marketing Corporation
Market Trials Open Market Participant Call
Presentation transcript:

NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments

Original NPRR 336 Defined Cold Weather Watch and Severe Cold Weather Watch ERCOT directed to purchase additional 1150 MW RRS from Generation Resources for either condition Startup all Generation Resources which have startup times greater than one hour

Tenaska Comments Deleted the specification that the additional RRS be procured from Generation Resources

Luminant Comments Changed additional RRS procurement to NSRS and gave ERCOT discretion as to quantity Introduced a new defined term, Conditional Reliability Unit Commitment Conditional Reliability Unit Commitment A RUC instruction which is issued by ERCOT prior to the Day Ahead Market for an Operating Day due to the forecasted loads requiring a Resource with longer than 10 hour start time. A Resource that receives a Conditional Reliability Unit Commitment prior to the DAM for an Operating Day will be eligible to participate in the DAM or self commit prior to the DRUC process for the Operating Day and if not otherwise committed, will receive a RUC instruction with no clawback provisions.

Possible Cold Weather Scenario ERCOT knows at 07:00 on Day 1 that they want a Unit online and available for morning peak of Day 2, HE06. They do not want to wait until after DAM to begin the startup. Issue a Conditional RUC The Resource may participate in DAM If its TPO is struck, it must DAM Commit If TPO not awarded, it has CRUC status for next day COP. CRUC status settled with RUC make whole and no clawback. If not in DAM, use VC or Generic Cap for startup and min energy costs.

Possible Settlement Implications If not DAM committed, the Resource shows CRUC status in COP so that additional capacity not DRUC committed. Concern: Could this give advantage to longer lead time Resources due to elimination of clawback? Question: Is it important for ERCOT to be able to issue a RUC before 16:00 Day Ahead? If not, this provision is not needed.

QMWG Recommendations Tenaska comments regarding Load Resources? Luminant comments regarding NSRS instead of RRS? Discretionary amount of NSRS? Concept of early RUC?