© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.

Slides:



Advertisements
Similar presentations
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Production Operations Management - 5 th Edition Chapter.
Advertisements

Chapter 16 Lean Systems.
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Just-in-Time and Lean Systems
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
Beni Asllani University of Tennessee at Chattanooga
Just-in-Time and Lean Systems
Lean Operations (JIT) Module
Competing with Time Leeds School of Business University of Colorado Boulder, CO Competing with Time Leeds School of Business University of Colorado.
Operations Management Just-in-Time Systems Supplement 12
Beni Asllani University of Tennessee at Chattanooga
Beni Asllani University of Tennessee at Chattanooga
Competing with Time Leeds School of Business University of Colorado
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Competing with Time Leeds School of Business University of Colorado Boulder, CO Competing with Time Leeds School of Business University of Colorado.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Competing with Time Leeds School of Business University of Colorado Boulder, CO Competing with Time Leeds School of Business University of Colorado.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Just-In-Time and Lean Production
Chapter 7, Lean Thinking and Lean Systems
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Just-In-Time & Lean Systems
JIT – Just-In-Time Production
JIT and Lean Operations
Chapter 7 – Just-in-Time and Lean Systems
© 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e Chapter 15 Lean Operations in Services and Support Functions.
PRODUCTION & OPERATIONS MANAGEMENT Module II JIT & LEAN PRODUCTION Prof. A.Das, MIMTS.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
Just-In-Time and Lean Production. JIT In Services Competition on speed & quality Competition on speed & quality Multifunctional department store workers.
“Without the Cost of Waste …”
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 11 Just-In-Time and Lean Production.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Production Operations Management - 5 th Edition Chapter.
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lean Production.
Chapter 15 Just-In-Time and Lean Production. JIT In Services Competition on speed & quality Competition on speed & quality Multifunctional department.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Operations Fall 2015 Bruce Duggan Providence University College.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean System Methods ISV Operations Management - 6 th Edition.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
Chapter 15 Just-In-Time and Lean Production. JIT In Services Competition on speed & quality Competition on speed & quality Multifunctional department.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
Operations Management JIT & Lean Systems
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Lean operations and JIT
Beni Asllani University of Tennessee at Chattanooga
Inputs and Outputs to Aggregate Production Planning
Pull Manufacturing and Just In Time
Just-In-Time and Lean Production
Just-In-Time and Lean Production
Inputs and Outputs to APP
Presentation transcript:

© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems

2000 by Prentice-Hall, Inc2 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e What is JIT ?  Producing only what is needed, when it is needed  A philosophy  An integrated management system.  JIT’s mandate: Eliminate all waste.

2000 by Prentice-Hall, Inc3 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Inventory Hides Problems Poor Quality Unreliable Supplier Machine Breakdown Inefficient Layout Bad Design Lengthy Setups

2000 by Prentice-Hall, Inc4 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Examples of Waste  Watching a machine run  Waiting for parts  Counting parts  Overproduction  Moving parts over long distances  Storing inventory  Looking for tools  Machine breakdown  Rework

2000 by Prentice-Hall, Inc5 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Basic Elements of JIT 1.Flexible resources 2.Cellular layouts 3.Pull production system 4.Kanban production control 5.Small-lot production 6.Quick setups 7.Uniform production 8.Quality at the source 9.Total productive maintenance 10.Supplier networks

2000 by Prentice-Hall, Inc6 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Flexible Resources  Multifunctional workers  General purpose machines  Study operators & improve operations

2000 by Prentice-Hall, Inc7 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Manufacturing Cell With Worker Routes Enter Worker 1 Worker 2 Worker 3 Exit Key: Product route Worker route Machines

2000 by Prentice-Hall, Inc8 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Cellular Layouts  Group dissimilar machines in manufacturing cell to produce family of parts  Work flows in one direction through cell  Cycle time adjusted by changing worker paths

2000 by Prentice-Hall, Inc9 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Kanban Production Control System  Kanban card indicates standard quantity of production  Derived from two-bin inventory system  Kanban maintains discipline of pull production  Production kanban authorizes production  Withdrawal kanban authorizes movement of goods

2000 by Prentice-Hall, Inc10 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e A Sample Kanban Machining M-2 Assembly A-4 Part no.: 7412 Description: Slip rings From :To: Box capacity 25 Box Type A Issue No. 3/5

2000 by Prentice-Hall, Inc11 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Small-Lot Production  Requires less space & capital investment  Moves processes closer together  Makes quality problems easier to detect  Makes processes more dependent on each other

2000 by Prentice-Hall, Inc12 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Reducing Setup Time  Preset desired settings  Use quick fasteners  Use locator pins  Prevent misalignments  Eliminate tools  Make movements easier

2000 by Prentice-Hall, Inc13 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Uniform Production  Results from smoothing production requirements  Kanban systems can handle +/- 10% demand changes  Smooths demand across planning horizon  Mixed-model assembly steadies component production

2000 by Prentice-Hall, Inc14 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Quality At The Source  Jidoka is authority to stop production line  Andon lights signal quality problems  Undercapacity scheduling allows for planning, problem solving & maintenance  Visual control makes problems visible  Poka-yoke prevents defects

2000 by Prentice-Hall, Inc15 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Kaizen  Continuous improvement  Requires total employment involvement  Essence of JIT is willingness of workers to  spot quality problems  halt production when necessary  generate ideas for improvement  analyze problems  perform different functions

2000 by Prentice-Hall, Inc16 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Total Productive Maintenance (TPM)  Breakdown maintenance  repairs to make failed machine operational  Preventive maintenance  system of periodic inspection & maintenance to keep machines operating  TPM combines preventive maintenance & total quality concepts

2000 by Prentice-Hall, Inc17 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e TPM Requires Management To  Design products that can be easily produced on existing machines  Design machines for easier operations, changeover, maintenance  Train & retrain workers to operate machines  Purchase machines that maximize productive potential  Design preventive maintenance plan spanning life of machine

2000 by Prentice-Hall, Inc18 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Trends In Supplier Policies 1. Locate near to customer 2. Use small, side loaded trucks and ship mixed loads 3. Consider establishing small warehouses near to the customer or consolidating warehouses with other suppliers 4. Use standardized containers and make deliveries according to a precise delivery schedule 5. Become a certified supplier and accept payment at regular intervals rather than upon delivery

2000 by Prentice-Hall, Inc19 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Benefits Of JIT 1. Reduced inventory 2. Improved quality 3. Lower costs 4. Reduced space requirements 5. Shorter lead time 6. Increased productivity 7. Greater flexibility 8. Better relations with suppliers 9. Simplified scheduling and control activities 10.Increased capacity 11.Better use of human resources 12.More product variety

2000 by Prentice-Hall, Inc20 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e JIT Implementation  Use JIT to finely tune an operating system  Somewhat different in USA than Japan – why?  JIT is still evolving  JIT isn’t for everyone

2000 by Prentice-Hall, Inc21 Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e JIT In Services  Competition on speed & quality  Multifunctional department store workers  Work cells at fast-food restaurants  Just-in-time publishing for textbooks  Construction firms receiving material just as needed