Perencanaan Kapasitas Produksi

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
14 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Operations Planning and Scheduling 14 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Manufacturing’s Objectives
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Operations Planning Horizons
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Production Activity Control
QAD Routings Implementation Sheri Forrest – RFBP Nadia Truxell – Logan Consulting.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Ardavan Asef-Vaziri Systems and Operations Management
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Production Activity Control
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Aggregate Planning.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
Aggregate Planning and Resource Planning Chapters 13 and 14.
CAPACITY MANAGEMENT Nyoman Pujawan.
CAPACITY PLANNING Prof. Dr. Orhan Torkul Res. Assist. M. Raşit Cesur.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
(Material Requirements Planning)
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Activity Scheduling and Control
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Basics of Supply Chain Management
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
Capacity Planning and Utilization
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Production Planning and control – ME 1009 Unit 1 Introduction.
Chapter 14 Aggregate Planning.
PRODUCTION ACTIVITY CONTROL (PAC)
Operations Management
Production Planning and Control
Introduction to Materials Management
13 Aggregate Planning.
Chapter 7 Capacity Planning and Management
PRODUCTION ACTIVITY CONTROL (PAC)
Manufacturing Planning and Control
Material Requirements Planning (MRP)
Outline Questions? Quiz on Thursday Any Questions on MRP Records?
OUTLINE Questions? Quiz Discuss homework New Homework Start MRP.
Dr Sh Salleh bin Sh Ahmad
Capacity Planning.
OUTLINE Questions? Quiz Results New homework MRP Capacity.
Manufacturing’s Objectives
Inputs and Outputs to Aggregate Production Planning
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Master Production Scheduling (MPS)
Presentation transcript:

Perencanaan Kapasitas Produksi D0394 Perancangan Sistem Manufaktur Pertemuan XI - XIV 1

Goal of Business Turn Sales into Profits Use Minimum Resources to Max Profits Produce to Demand No Over Production No Under Production

Capacity Management Capacity APICS Definition “The capability of a worker, machine, work center, plan, or organization to produce output per period of time.” Is the amount of work that can be done in a specified time period. Capacity is the rate of doing work, not the quantity of work done. 2

Capacity Management Two Types of Capacity Load Capacity Available The capacity of a system or resource to produce a quantity of output per time period Capacity Required The capacity of a system or resource needed to produce a desired output in a given time period. Load The amount of released and planned work assigned to a facility for a particular time period. 3

Capacity Management Capacity Management APICS Definition: “The function of establishing, measuring, monitoring and adjusting limits or levels of capacity in order to execute all manufacturing schedules” CM is responsible for determining the capacity needed to achieve the priority plans CM also serves by providing, monitoring, and controlling that capacity such that the priority plan can be met. 4

Capacity Management Capacity Control Is the process of monitoring production output, comparing it with capacity plans, and taking corrective action when needed. 5

Capacity Management Capacity Planning The process of determining the resources required to meet the priority plan and the methods needed to make that capacity available. The priority plan cannot be implemented unless the firm has sufficient capacity to fulfill demand. Capacity planning links priority schedules to manufacturing resources. 6

Capacity Management Capacity versus Load LOAD CAPACITY AVAILABLE OUTPUT 7

Capacity Tracking

Capacity Tracking

Capacity Management Capacity Planning Priority plans are stated in units of product or some standard unit of output. Capacity can usually be stated in similar units. If there exists no common unit then capacity must be expressed in terms of hours available. 8

Capacity Management The Process of Capacity Planning Determine the capacity available at each work center in each time period Determine the load at each work center in each time period Resolve differences between available capacity and required capacity If possible, adjust available capacity to match the load. 9

Capacity Management Planning Levels Resource Plan Production Plan Master Production Schedule Rough-cut Capacity Plan Plan Material Requirements Plan Capacity Requirements Plan Implementation/ Control Production Activity Control Capacity Control Short Range 10

Capacity Management Capacity Requirements Planning (CRP) It is the process of determining in detail the amount of labor and machine resources needed to achieve the required production. CRP occurs at the level of the MR plan CRP is the most detailed, complete, and accurate of the capacity planning techniques. 11

Capacity Management Capacity Requirements Planning Inputs *Open shop orders *Time standards *Planned order releases *Lead times *Routings *Work center capacities Sources of Information *Open order file *Routing file *MR plan *Work center file 12

Capacity Management Open Order File Planned Order Releases A record of all active shop orders Shows all relevant information such as quantities, due dates, and operations Planned Order Releases Determined by the MRP logic based upon the gross requirements for a part Inputs to the CRP process in assessing the total capacity required in future time periods. 13

Capacity Management Routing File A routing is the path that work follows from work center to work center as it is completed Shown on route sheets or route files Routing files contain the following: Operations performed Sequence of operations Work centers to be used Tooling needed at each operation Standard, setup, and run times per piece 14

Capacity Management Work Center File A work center consists of a number of machines or workers capable of doing the same work. No differences in the kind of work or capacity A work center file contains information on: Capacity Move time Wait time Queue time 15

Capacity Management Jan-00 S M T W F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Shop Calendar - used to assist in determining the number of work days in a period. Calendar Day Manufacturing Day 16

Capacity Management Capacity Available Is the capacity of a system or resource to produce a quantity of output in a given time period. Capacity available is affected by: Product specifications Product mix Plant and equipment Work effort 17

Capacity Management Measuring Capacity Units of Output If a variety of products produced is not large, a common unit of output can be used such as: Tons of material Gallons Barrels Number of units…etc. Where a variety of products exists a common unit may not be feasible, so time becomes the unit Standard times 18

Capacity Management Levels of Capacity Capacity should be measured on three levels: Machine or Individual Worker Work Center Plant 19

Capacity Management Determining Capacity Available Demonstrated Capacity An average obtained from historical data Calculated Capacity Based on available time, utilization and efficiency Available Time Is the number of hours a work center can be used Depends on the number of machines, number of workers and the hours of operation. 20

Demonstrated Capacity Example: #5.6, pg. 137 Q: Over a period of four weeks, a work center produced 50, 45, 35, and 55 standard hours of work. What is the demonstrated capacity of the work center? A: Demonstrated capacity = (50 + 45 + 35 + 55) / 4 = 46.25 standard hours

Capacity Formulas Utilization=(actual hours worked/available hours) x 100% Efficiency=(std. hrs. of work/actual hours worked) x 100% Rated Capacity = available time x utilization x efficiency

Available Time Example: A work center has three machines and is operated for two eight hour shifts a day, five days a week. What is the available time? Available Time = 3 machines x 16 hrs. x 5 days = 240 hrs/wk

Utilization Example: A work center is available 80 hours, but actually produced goods for 70 hours. What is the utilization of the work center? Utilization = (hours actually worked/available hours) x 100% = (70/80) x 100% = 87.5%

Capacity Management Capacity Required (Load) Translation of priorities into hours required at each work center in each time period. Two-step process: First determine the time required for each order at each work center Second, add up the capacity required for the individual orders to obtain the load. 21

Capacity Management Time Needed per Order The time needed for each order is the sum of the setup time and the run time. The run time is equal to the run time per piece multiplied by the number of pieces in the order. 22

Capacity Management Load The load is the sum of the required times for all the planned and actual orders to be run on the work center in a specified period. Calculating the load: First, determine the standard hours of operation time for each planned and released order to each work center by time period. Second, add all the standard hours together for each work center in each period. 23

Capacity Required Example: #5.11, pg. 137 Q: How many standard hours are needed to run an order of 200 pieces if the setup time is 1.3 hours and the run time is 0.3 hours per piece? How many actual hours are needed at the work center if the efficiency is 130% and the utilization is 70%? A: Time Required = setup time + (run time X no. of pieces) = 1.3 + (.3 X 200) = 61.3 standard hours Actual Hours = standard hours/(efficiency X utilization) = 61.3/(1.3 X 0.7) = 67.36 hours

Capacity Management Work Center Load Report Shows future capacity requirements based on released and planned orders for each time period of the plan. Undercapacity Means the work center is underloaded Overcapacity Means the work center is overloaded 24

Work Center Load Example: #5.14, pg. 138 5.14 A work center has the following open and planned orders for week 4. Calculate the total standard time required (load). 15.25 2.90 16.00 5.75 39.90 Released Orders 125 Total time = 0.25 + (150 x 0.10) = 15.25 345 Total time = 0.40 + (50 x 0.05) = 2.90 Planned Orders 565 Total time = 1.00 + (75 x 0.20) = 16.00 785 Total time = 0.50 + (35 x 0.15) = 5.75

Capacity Management Scheduling Orders Back Scheduling Calculation of when orders must be started and completed on each work center so the final due date can be met. Back Scheduling Start with the due date, and using the lead times, work back to find the start date for each operation. 25

Capacity Management Scheduling Orders Information Needed: Quantity and due date Sequence of operations and work centers Setup and run times for each operation Queue, wait and move times Work center capacity available Information obtained from: Order file Route file Work center file 26

Capacity Management Scheduling Process First, calculate for each work order the capacity required (time) at each work center. Second, starting with the due date, schedule back to get the completion and start dates for each operation. 27

Capacity Management Making the Plan At this step the objective is to compare the load to available capacity to identify any imbalances. Two ways of balancing capacity and load: Alter the load Change the capacity available 28

Capacity Management Making the Plan Altering the load Shifting orders ahead or back so that the load is leveled. Other components may have to be rescheduled The MPS may need to be changed 29

Capacity Management Making the Plan Changing the Capacity Available Schedule overtime or under time. Adjust the level of the workforce by hiring or laying off workers. Shift workforce from underloaded to overloaded work centers. Use alternate routings to shift some load to another work center. Subcontract work when more capacity is needed or bring in previously subcontracted work to increase required capacity. 30

Capacity Management MRP and CRP Closed-Loop System MPS NO Capacity OK? (Rough Cut) YES MRP Feedback NO Capacity OK? (CRP) YES Purchasing Production Activity Control Performance Measures 31

Scheduling Example: #5.18, pg. 140 5.18 Back schedule the following shop order. All times are given in days. Move time between operations is one day, and wait time is one day. Due date is day 200. Assume orders start at the beginning of a day and finish at the end of a day. 176 182 185 190 197 – 2 - 3 Finish Date – Operation Time – Queue Time 199 – 1 – 1 Finish Date - Wait Time - Move Time 193 197