F08 – 72 – OUTGRESP First Contingency Outage Response for SIUC Client: SIU Physical Plant Engineering Services Team Members: Terry Campanella, PM, EE/CpE.

Slides:



Advertisements
Similar presentations
LEARNING PLAN REMEMBERING TIPS. CONSTRUCT A timeline for studying the material.
Advertisements

Team 47: Ali Albayat Kyle Barringer James Butler Geoffrey Daniel Joe Sobeski.
A New Launcher for University Sounding Rockets
F08 – 72 – OUTGRESP First Contingency Outage Response for SIUC Client: SIUC Physical Plant Engineering Services Team Members:Rudy Probst, EE Kyle Moore,
Cory Fulkerson (Project Manager) - Mechanical Engineer John Graham - Computer Engineer Clayton Hooks - Electrical Engineer O’Raphael Okoro - Electrical.
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
R·I·T Kate Gleason College of Engineering Design of a Tensile Load Frame for a Scanning Electron Microscope Senior Design Project Project Manager.
Controls Lab Interface Improvement Project #06508Faculty Advisors: Dr. A. Mathew and Dr. D. Phillips Project Objectives This work focused on the improvement.
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
SCADA Enterprise Training Virtual Integrated Grid Client: Dr. Oman Prepared by: Nate Krussel and Theora Rice 1.
Distributed Power Systems ELCT 908
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Level 2 Unit 2 Investigating Engineering Design Engineering Diploma Level 2 Unit 2 Investigating Engineering Design Planning Unit Delivery.
Assistive Technology for Promotional Calendar Production Improvement Proposal Eric Hoffmann, Lisa Furby, Ronnie Mays, Samir Shah, Whitney Belt.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Project: May Project Team Members: Edward McDowell, EE Richard Mott, EE / Econ Faculty Advisors: Dr. John.
Temperature Controller for Infrared Paint Curing September 13, 2001 Dec01-11 Team Members Michael Burman, CprE Jonathan Johnson, EE Matthew McMullen, CprE.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
ITEC 3220M Using and Designing Database Systems
F10-52-PAINTMRK:.  Faculty Technical Advisor:  Dr. Kambiz Farhang  Team Members:  Seth Carter, ME (PM) ▪ Valve & Bolt System  James Morrow, ME ▪
Senior Design, Spring 2013 Jane Peters Riley Groves Jared Jasper Matt Murphy Muzi Li.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Awareness of Decisions in Evaluating Promotion and Tenure (ADEPT) Carol Colatrella, Professor, ADEPT Coordinator, Energeia Editor.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Project Title (as descriptive as possible) Group Members CPE495 Group ??? Computer Engineering Design I Electrical and Computer Engineering The University.
Senior Design Laboratory Design Dec 05-01
Defining Procedures for Decision Analysis May & Engr A April 30, 2002 Client & Faculty Advisors –Dr. Keith Adams –Dr. John Lamont –Dr. Ralph.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
The Balance Between Theoretical and Practical Work Within Electrical and Computer Engineering Courses Dr. Bahawodin Baha March Development Partnerships.
© Minder Chen, IDEF 85 - Methods and Tools for BPR An Integrated Framework for Methods and Tools for BPR Process Modeling Methods and Tools –IDEF0.
1 You are a New Member of the JAC; NOW WHAT? As a new Journey-Level Advisory Council (JAC) member, you probably have many questions, including those about.
Highly Flexible Design for Gantry Robot Systems Team: F08-77-FLXGANT1 Client: Logic One Robots Contact: Bill Egert, Engr VP.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
System Context and Domain Analysis Abbas Rasoolzadegan.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
Wind Turbine Project Plan (Dec08-04) ‏ Lindsay Short Nick Ries Luke Donney Dario Vazquez Chris Loots Advisor: Dr. Ajjarapu Client: Dr. Aliprantis.
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
Greater Des Moines Energy Center Combined Cycle Plant Diagram of a Combined Cycle Generator Abstract Combined-cycle generating units are being incorporated.
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
ECE791 Senior Design Experience Project Requirements and Timeline.
Mid Semester Presentation Draft February 17, 2011.
Chapter 12 The Network Development Life Cycle
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design II.
> AREVA NP GmbH < AREVA NP. > AREVA NP GmbH < AREVA NP Electrical Protection for Diesel Generators in Nuclear Power Plants Dr. Plamen Watschkow AREVA.
The Recycling Robot SECON Team B Mid-Term Presentation.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Information System Analysis & Design on Pediatrics Office Presented by Team #5 Jie-Soo Hong Youngjoon Kim Rinardi Yu Wu.
Electrical Symbol and Line Diagram
Improved Driver Education May Client:Iowa Department of Transportation Advisors:John Lamont Ralph Patterson III Max Porter Duane Smith April 25 th,
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
CDM Construction Design and Management
LIGHTNING PROTECTION OF TRANSMISSION AND DISTRIBUTION LINES Team Members Eric Nelson, EE – Project LeaderDavid Dieterich, EE Tim Conrad, EE – Com. CoordinatorSam.
By: Wilmer Arellano.  1. Form a team  2. Find a Team Leader  3. Find Three Potential Topics  4. Find a Mentor  5. Select a Topic.
Power System Protective Relaying-Part One
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
DBM 265 Week 3 Individual Assignment Preparing to Install a Database Choose an installation that is appropriate for a DBMS environment. Gain the approval.
DBM 384 Week 5 Learning Team Specialized Database Executive Summary Check this A+ tutorial guideline at 384/DBM-384-Week-5-Learning-Team-
Camera PDR/CD1 Planning 19 September 2008
Borah Mitigators Problem Definition: Sponsor: Idaho Power
Information Technology Deanship
Natural Gas Infrastructure Assessment
UOPOPS 571 Education for Service-- uopops571.com.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Welcome to CSci8211: Advanced Computer Networks and Their Applications aka Basic Architecture, Mechanisms and Research Issues in Emerging Software-Defined.
Fertilizer Industry Safety Information Analysis and Sharing Program
Tutorial I GE 105 Engineering Design Dr. Raja Rizwan Hussain College of Engineering King Saud University.
Engineering Design Process
Presentation transcript:

F08 – 72 – OUTGRESP First Contingency Outage Response for SIUC Client: SIU Physical Plant Engineering Services Team Members: Terry Campanella, PM, EE/CpE Tanner Jones, EE Clint Frederick, EE Rudy Probst, EE Damon Adams, EE Kyle Moore, EE Faculty Advisor: Dr. Constantine Hatziadoniu Client Contact: Steve Lazorchak, PE

Outline of Topics Executive SummaryTerry Project DescriptionTerry Outage Preparation PlanTanner Protective DevicesClint Mechanical ConsiderationsTerry Mobile TransformersRudy Universal TransformerDamon First Contingency Outage PlanKyle Literature Review SummaryClint Plan for CompletionTanner Resources NeededKyle SummaryRudy

Executive Summary Why is there a need for a Contingency Outage Plan? ◦ Outages Like Summer 2008 ◦ Extended Outages during Critical Times ◦ Enhance Reliability of SIUC Electrical System Deliverables: Mechanical and Protective Reports, Feasibility of a Replacement Transformer, Outage Preparation Plan, Outage Contingency Plan Dollars Needed: $0

Project Description Mechanical Considerations Protective DevicesOutage Preparation Plan Mobile Transformer Universal Transformer Contingency Transformer Outage Plan

Outage Preparation Plan Study of critical loads Plans for affected buildings ◦ Basic guidelines for handling an outage ◦ Standardized operating procedures for extended outages

Protective Devices Study feeder one-line diagram Simulate existing protective schemes Evaluate adequacy of protective schemes If necessary, design new scheme for replacement transformer

Mechanical Considerations Find best route to access transformer Analyze surrounding structures for possible complications during a replacement Study clearances

Mobile Transformer Trailer mounted transformer for easy transportation to load site Connections Storage Safety/Security Protection

Universal Transformer One-size fits most Determine best transformer replacement ◦ Three-phase unit ◦ Three single-phase cans Will fit in location of physically smallest present transformer Similar constraints to Mobile Transformer

First Contingency Outage Plan Analyze present testing procedures Analyze current plan for responding to an outage Consider proposed transformer replacement design Recommend new or modified procedures and plan as necessary

Literature Review Summary Outage Awareness and Preparation Plans Transformer Configuration and Construction Transformer Protection Transformer Testing Emergency Mobile Transformers Transformer Replacement Procedures

Plans for Completion AIL ◦ Visit Transformer Locations ◦ Review Transformer Database and Feeder Diagram ◦ Formulate Plans of Approaching Subsystems ◦ Design Subsystem Timeline

Resources Needed ItemDescriptionQuantity$ Each$Subtotal 1 MATLAB 2On hand Power World Simulator 2On hand Easy Power 2 Borrowed * 0.00 TRANSFORMER AND PROTECTION SUBSYSTEMS $ Microsoft Office 6On hand0.00 OUTAGE PREPARATION PLAN AND FIRST CONTINGENCY OUTAGE PLAN SUBSYSTEMS $ Cardboard boxes 10On hand Digital Camera 1On hand0.00 MECHANICAL CONSIDERATIONS SUBSYSTEM $0.00 Total New Dollars Needed $0.00

Summary Project Description Resources - $0 Deliverables

Questions?