April, 2005 EPICS Collaboration Controls Group Alarm Management at Jefferson Lab A New Configuration and Extended Capabilities B. Bevins, M. Joyce, J.

Slides:



Advertisements
Similar presentations
Control System Studio (CSS)
Advertisements

Paul Chu FRIB Controls Group Leader (Acting) Service-Oriented Architecture for High-level Applications.
SSE system Management and Evaluation System, based on the obtained results.
Introduction to Alarm Handlers Randy Flood Karen Schroeder AOD/OPS.
LCLS Control System Overview Mike Zelazny SLAC ICD Software Department Accelerator Directorate.
Controls Group New Channel Access Nameserver Joan Sage 12/4/01.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Controls Group May 22-24, 2002 EPICS Collaboration Jefferson Lab Electronic Logbook Theo Larrieu Theo Mcguckin Michelle Joyce.
Best Ever Alarm System Toolkit Kay Kasemir, Xihui Chen, Katia Danilova SNS/ORNL April, 2013.
Next Generation MMI Requirements May 4, MMI - High Level Requirements run under UNIX and Windows NT (WNT) use a well defined ASCII definition for.
Diagnostics. Module Objectives By the end of this module participants will be able to: Use diagnostic commands to troubleshoot and monitor performance.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Controls and Monitoring Implementation Plan J. Leaver 03/06/2009.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
CN2140 Server II Kemtis Kunanuraksapong MSIS with Distinction MCT, MCITP, MCTS, MCDST, MCP, A+
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.

SPEAR PV RDB Database EPICS Collaboration Meeting April 27, SPEAR PV RDB Database Clemens Wermelskirchen.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
April, 2005 EPICS Collaboration Controls Group EDM at Jefferson Lab B. Bevins, T. Carlino, J. Sage.
The Soft-IOC Based Alarm Handler – an Operations View Pam Gurd October 31, 2007.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Jan Control System Studio Training - Alarm System Use.
–Streamline / organize Improve readability of code Decrease code volume/line count Simplify mechanisms Improve maintainability & clarity Decrease development.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS April 2013 Control System Studio Training - Alarm System Use.
Experimental Physics and Industrial Control System (EPICS) Alarm Handler (ALH) Bob Dalesio, August 14, 1999.
NWU: Helpdesk Call handling ITC Training: Session 1 -Call Logging and Remedy -Campus Helpdesks and Escalation -Remedy Solution Database -Remedy Mechanisms.
WorkPlace Pro Utilities.
jpasswd A common password change client for Unix and NT Marty Wise Jefferson Lab October, 2000.
Imperial College Tracker Slow Control & Monitoring.
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
Debby Quock November 13, 2012 IRMIS at CLS. IRMIS Currently at CLS PV Crawler –Perl modules that parse EPICS IOC st.cmd, db, and dbd files. Information.
By The First Hotel Booking System. The Group Teodor Talov (Project Manager) Tyler Thomas Michael Evans Yolanda (Xiaofeng, Zhu)
Thomas Jefferson National Accelerator Facility Page 1 Slow Controls Ken Livingston University of Glasgow.
Introduction to EPICS (Ned Arnold, John Maclean).
® MTAC WG #135 Transportation Management Systems (TMS) Combined Data Limitations November 18, 2010.
DireXions – Your Tool Box just got Bigger PxPlus Version Control System Using TortoiseSVN Presented by: Jane Raymond.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Oct EPICS Meeting, PAL, Korea Control System Studio Training.
Wir schaffen Wissen – heute für morgen Gateway (Redux) PSI - GFA Controls IT Alain Bertrand Renata Krempaska, Hubert Lutz, Matteo Provenzano, Dirk Zimoch.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Matthias Clausen, DESY XFEL Refrigerator Controls – April CSS Core Applications.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
SNS Alarm System Status Curtis Dunn Control System Suite/Eclipse Frameworks Workshop EPICS Collaboration Meeting June 12-16, 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
EPICS Release 3.15 Bob Dalesio May 19, Features for 3.15 Support for large arrays - done for rsrv in 3.14 Channel access priorities - planned to.
Today’s Topic: Embedding and Linking an Excel Worksheet.
EPICS Release 3.15 Bob Dalesio May 19, Features for 3.15 Support for large arrays Channel access priorities Portable server replacement of rsrv.
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
Jan Hatje, DESY CSS – Control System Studio EPICS collaboration meeting CSS – Control System Studio Update EPICS collaboration meeting 2008 Shanghai.
Ralph Lange: CA Gateway Update CA Gateway Update Ralph Lange – EPICS Collaboration Meeting March SSRF.
1 1999/Ph 514: Lab #1 : CA Clients EPICS Lab #1 CA Clients.
B. Dalesio, N. Arnold, M. Kraimer, E. Norum, A. Johnson EPICS Collaboration Meeting December 8-10, 2004 Roadmap for IOC.
Stanford Linear Accelerator Center Michael Zelazny EPICS Collaboration Meeting Dec 3&4, Channel Watcher Bumpless Reboot Replacement Related Web Page:
Thomas Jefferson National Accelerator Facility. Actions: Procedures For IOC Application Development, Testing, and Installation Tools: Shell scripts, Perl.
Controls Zheqiao Geng Oct. 12, Autosave Additions/Upgrades and Experiences at SLAC Zheqiao Geng Controls Department SLAC National Accelerator Laboratory.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Channel Archiver Overview Jan Channel Archiver Channel Access client Stores samples in disk files Design target: handle values/sec Documentation,
Controls Group New Channel Access Nameserver Presented by Karen White for Joan Sage.
January 2010 – GEO-ISC KickOff meeting Christian Gräf, AEI 10 m Prototype Team State-of-the-art digital control: Introducing LIGO CDS.
Managed by UT-Battelle for the Department of Energy Quest for the Best Ever Alarm System Tool Kay Kasemir Oct
Best Ever Alarm System Toolkit Kay Kasemir, Xihui Chen, Katia Danilova, SNS/ORNL ICALEPCS 2009, Kobe, Japan, Oct 2009.
Sem 2v2 Chapter 3 Using the Router Understand the Basics of Router's Command Line Interface. Demonstrate How to Log into the Router. Demonstrate How to.
LCLS Commissioning & Operations High Level Software
SNS Status Report Karen S. White 10/15/08.
Accelerator Reliability and Software
Relational Database Collaboration
LCLS Commissioning & Operations High Level Software
Alarm Handler Upgrade and Channel Watcher Status
EPICS Collaboration Meeting Jefferson Lab November 21st, 2002
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Presentation transcript:

April, 2005 EPICS Collaboration Controls Group Alarm Management at Jefferson Lab A New Configuration and Extended Capabilities B. Bevins, M. Joyce, J. Sage

Controls Group April, 2005 EPICS Collaboration Outline  New Requirements  ALH Usage  ALH Modifications  CDEV Modifications  Other Development  Status

Controls Group April, 2005 EPICS Collaboration New Requirements  Motivated by a new control room design  Global acknowledgement  Global disabling  Smarter automatic disabling  Centralized logging  Geographical view of accelerator  Make alarms “more meaningful”  Motivated by maintainability  Automatic generation of configuration files  Separate configs for operators and experts

Controls Group April, 2005 EPICS Collaboration Old Control Room

Controls Group April, 2005 EPICS Collaboration New Control Room

Controls Group April, 2005 EPICS Collaboration Changes to ALH Usage  Thorough review of alarm parameters  Removed extraneous alarms  Determined where to ignore transients and of what duration  Readable alias names used throughout  Use ALH in global mode  Master copy manages alarm logic  Operators open copies to acknowledge  Logs to CMLOG  FORCEPV’s to disable (automatic and manual)  SEVRPV’s to summarize alarm state in MEDM

Controls Group April, 2005 EPICS Collaboration ALH Modifications  Uses CDEV transparently  Wasn’t quite working before  Uses CHANNEL keyword rather than CDEV keyword  Also works for FORCEPV, SEVRPV, etc.  Unacknowledged Severity PV’s  New keyword UASEVRPV works like SEVRPV  Disabling a group/channel updates parent group severity PV’s (both types)

Controls Group April, 2005 EPICS Collaboration Why CDEV?  Legacy: high level RF system diagnostics calculated in CDEV-based RF Alarm Server  Allows alarms on other CDEV-based high level beam applications servers  Slow locks, real-time optics model, etc.  Alarm states can now be monitored and acknowledged directly from Tcl-CDEV applications.

Controls Group April, 2005 EPICS Collaboration CDEV Modifications  CA Service Enhancements  Supports ack and ackt messages  Allows unAckSevr and ackTrans tags (along with severity, status, etc.)  Allows correct canceling of monitor requests Now matches the documentation Prevents buffered callbacks from being delivered after a monitor has been canceled

Controls Group April, 2005 EPICS Collaboration Other Development  makeALHConfig - Perl scripts to generate config files and sponsor FORCEPV and SEVRPV soft channels on a Proxy IOC (PIOC)  15,372 alarms  11,463 PV’s on PIOC  alhDisable - Tcl program to manage FORCEPV’s and manually disable alarms  Generates reports of all currently disabled alarms for shift changes, etc.  Makes an entry in the Logbook.

Controls Group April, 2005 EPICS Collaboration Alarm Summary Screen

Controls Group April, 2005 EPICS Collaboration Alarm Disable Tool

Controls Group April, 2005 EPICS Collaboration Status  New automatically-generated configuration has been in use for several months.  Vast improvement: alarms are no longer silenced and ignored.  Global alarm management is being tested and should be fully deployed in May.  Modified CDEV will be released soon after through the CDEV website  ALH changes will be submitted for inclusion in new releases.

April, 2005 EPICS Collaboration Controls Group Alarm Management at Jefferson Lab A New Configuration and Extended Capabilities B. Bevins, M. Joyce, J. Sage