GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
Advertisements

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
SVAC/ISOCInstrument Analysis Meeting, April 14, 2006 Anders W. Borgland 1 The LAT In Every Which Way You Want It! Anders W. Borgland Science Verification,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectSVAC Peer Review July 21, 2004 E. do Couto e Silva 1/100 GLAST Large Area Telescope: Overview I&T Science Verification Analysis and Calibration.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
GLAST LAT ProjectOnline Peer Review – July 21, – Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Managers F2F 6/15/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
GLAST LAT Project Managers F2F 5/11/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT ProjectI&T Meeting – Feb 12, 2003 W. Focke 1 EM timing analysis Warren Focke February 12, 2004.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
IA meeting, Feb. 3, 2006 Mutsumi Sugizaki TKR Noise Stdudy 1 LAT TKR Noise Study Current Status Mutusmi Sugizaki (and short comment about TOT=255 event)
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
SVACInstrument Analysis Workshop IV Quatorze Juillet, 2005 Anders W. Borgland 1 Overview of Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
T. Burnett1 GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 9, 2002 SAS Software: Sources Detector geometry model Simulation Event.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Single-CAL Test and Calibration
GLAST Large Area Telescope Instrument Science Operations Center
Integration and Test Organization Chart
Overview Goal Study GEM variables in SVAC ntuple
Mini Tower Preliminary Results
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
Eduardo do Couto e Silva Feb 28, 2006
SVAC Configuration Verification
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of data from different cosmic ray runs –We need real data to decide that Develop offline experience with GASU data –What is the deadtime per subsystem? –Need to implement that in MC Test entire chain –Event data parsing –Configuration data parsing –Report generation –Analysis cuts for E2E tests –Comparison of plots

GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 2/6 Runs Database “Requirements” SVAC uses data from Online’s rc.out and/or snapshots We would like to have the following information for each data run –Run number –Start Date and time –Name of test script –LDF.FITS filename –Duration of test in seconds –Number of L1 triggers –Particle type (e.g. cosmic rays, photons) –Hardware type (e.g. 1 tower, EM, LAT) –Orientation (e.g. horizontal, vertical) –Completion status (e.g. success, failed, abort, undefined) –Links to test reports –Position of tower in a grid –Serial number of CAL, TKR and TEM modules –Number of towers in the configuration –Rate used for trigger tests –Which trigger input was used for coincidence window –Identifier from Gary’s matrix on what the E2E test is

GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 3/6 First select run Select a run

GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 4/6 Query List of Runs via the Web Run number Date Particle source Hardware type Hardware orientation

GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 5/6 Configuration Report Register Settings

GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 6/6 Register settings TKR GTRC Splits CAL FLE DAC Settings

GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 7/6 Quality Report (1) Report file for the digi data (automatically generated after each data run)

GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 8/6 Run selection (2) Get run info produced by on line Get report containing info extracted from digi root file Get configuration info