GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.

Slides:



Advertisements
Similar presentations
1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
Advertisements

1 Background: Use of TKR Trigger One-Shots individual TKR strip channels “true” when analog shaped pulse is above threshold. strips in a plane are OR’d.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Project Managers F2F 5/11/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT ProjectI&T Meeting – Feb 12, 2003 W. Focke 1 EM timing analysis Warren Focke February 12, 2004.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
Muon alignment with Cosmics: Real and Monte Carlo data S.Vecchi, S.Pozzi INFN Ferrara 37th Software Week CERN June 2009.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
W-DHCAL Analysis Overview José Repond Argonne National Laboratory.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
GLAST LAT Project Instrument Analysis Workshop September 27, 2004 E. do Couto e Silva 1/11 Overview of the Instrument Analysis Workshop Series Eduardo.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
HARPO Analysis.
GLAST Large Area Telescope:
Slice Test: Preliminary Data Analysis The Ohio State University
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Overview of Instrument Analysis Effort
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Instrument Analysis Workshop Series
BESIII EMC electronics
Overview Goal Study GEM variables in SVAC ntuple
Imaging crystals with TKR
Mini Tower Preliminary Results
Integration and Test Organization Chart
Eduardo do Couto e Silva Feb 28, 2006
Studies of the Time over Threshold
Shaped Digital Readout Noise in CAL
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 2 Goals for this Workshop Series Familiarizing LAT Collaborators with the –LAT instrument –Front-End Electronics –Trigger and Data Acquisition –Data Analysis Software –Data taking plans during LAT integration using –Cosmic rays –Van de Graaff photons Create a forum to –exchange knowledge between all subsystems and “hardware and software oriented people” Use simulated and real Data to –exercise reconstruction algorithms (mostly with real data) –exercise the data analysis tools and provide feedback to developers Develop expertise to –uncover and quantify any instrumental effects –could have an impact on the LAT science data –lay foundations of the LAT Science Operations Group of the ISOC –create a core and trained group to participate in the beam tests analysis effort –after instrument delivery Prepare for Instrument Data Analysis Develop ownership of the LAT instrument

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 3 Number of Talks in the IA Weekly Meetings/Workshops After 20 months, here we are…. Workshop 6 Workshop 5 Workshop 4 Workshop 3 Workshop 2 Workshop 1 1 tower < = 6 towers < = 8 towers LAT MC EM models MC THANK YOU !

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 4 The Instrument Analysis Workshop Series Workshop 1 (June 7-8, 2004) –Kick off meeting –Homogenize the knowledge from people who will do the data analysis –Assign “projects” using Monte Carlo simulated data Workshop 2 (September 27, 2004 ) –Discuss results from MC projects assigned during Workshop 1 –Discuss results from projects derived from REAL data collected with the Engineering Models (CAL and TKR) Workshop 3 (March 10, 2005) –Analysis of real data from the first tower Workshop 4 (July 14-15, 2005 ) –Analysis of real data up to 6 towers Workshop 5 (August 29, 2005) –Analysis of real data up to 8 towers –ACD Monte Carlo studies Workshop 6 (February 2006) –Preparations for final LAT Data Analysis –no FSW Workshop 7 (May/June TBR : depends on DC2, beam test and LAT Delivery to NRL) –LAT Data Analysis –FSW included

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 5 Frequently Asked Question… Aren’t you bored to analyze cosmic ray data for so long? –Yes… –irrespective of being astrophysicist or particle physicist So why do you do it ? –For four reasons –uncover hardware problems –identify software bugs –acquire experience with instrument –to reduce (hopefully) debugging time while in orbit Was it worth it ? –Check the next slides and draw your own conclusion…

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 6 Summary of Accomplishments Instrument Performance –Correlation between detectors –Independent trigger studies –Different particle types –Muon candidates –Photons candidates Calibrations –Generation and refinement of constants –Trending Instrument Operations –Experience with operational settings –several corners of the allowed parameter space –Development and Debugging of Low Level Infrastructure –Software/Database Development –Data Monitoring/Server

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 7 What have we accomplished? (1) Infrastructure –New TKR recon (IA3) –removed hard-coding of parameters and geometry –simplify infrastructure – easy to maintain –incomplete description of track objects –New CAL Recon (IA3) –no multi tower support –no threshold calibrations –Improved GEM (IA3) –arrival times for trigger conditions –triggering on edge instead of level (avoid retriggering) –added delta Window open time –added GemDeadZone (counts “missed” triggers that occurred within 2 counts of trigger window

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 8 What have we accomplished? (2) Trigger Studies (efficiencies, arrival time…) –Compared, to a few% level, MC TriggerAlg for TKR with GEM information by enabling TEM diagnostics (IA3) –TKR hit and trigger efficiencies –Variations of Trigger efficiencies at tens of % level (Pisa vs SLAC) due to amount of material above the TKR and tower orientation (upside down) (IA3) –Data and MC agreement within 2-3% for events crossing towers (IA4) –TRK uniformity compared using SLAC and Pisa runs (IA4) –Tower Efficiencies trended up to 8 tower tests (max changes seen %) (IA5) Timing Properties and Deadtime –First pass at trigger alignment (IA3) –In the absence of GPS time we defined EvtTicks to determine better the time between events (IA4) –used to cross check settings of different TACK delays between CAL modules (IA4) –Deadtime shown to be consistent with expectations for runs (IA4) –with and without flight configuration –with small and large data volume –with and without presence of additional high external trigger rates Noise occupancies –Studied TKR noise occupancy (IA3) –Look for off-track clusters to estimate noise in TKR from PDU voltage changes –no differences within 2% level (IA4) –Measured TKR noise occupancy (from to ) versus maximum distance between clusters in a plane for towers in Pisa (IA4)

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 9 What have we accomplished? (3) Calibrations (and related things) –TKR noisy and dead strips –Calculated TKR noisy, dead, partially disconnected, intermittent strips (IA3) –TKR large threshold dispersion (IA3) »improved by 10 % by calibrating it with muon peaks and TOT charge scale, gain and charge scale shown to be stable within that range (IA4) –TKR TOT Gains –TOT charge scale recalibrated and incident angle correction applied (agrees with MC within 1%) (IA5) –CAL Pedestals –CAL pedestals affected by changes in the 3.3 Volt which induced 1% gain changes (IA3) –CAL pedestal positions and widths for 3 phases (pre and post ship to SLAC and 8 tower tests) (IA5) »there is more there –CAL MIP peaks –CAL Muon peaks agreed with 2% with MC (IA3) –Differences of 2% shift in CAL muon peaks for CAL only vs TKR only data (IA4) –No differences in positions of CAL Muon peaks, width of Landau,  x,  y within 2% error (IA4) »Odd and Even bays (IA4) »PDU voltages +-1V from nominal (IA4) »additional trigger rates (ext) 20 KHz (IA4) »large size events (no zero-suppressed 4 range readout) (IA4) »consistent within 4% when comparing with MC (IA4) –ACD Calibrations –Prepared tools for ACD calibrations of veto thresholds offline and Track extrapolation into ACD (IA5)

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 10 What have we accomplished? (4) Performance (multiplicities, alignment…) –Extrapolated tracks into CAL to predict hit positions and to compare with CAL measurement of longitudinal positions in a crystal (IA3) –same study as function of energy (IA4) –Compared TKR runs with readout from Left or Right cables only and from both cables –no differences within tens of % when triggering on one tower and studying events on the adjacent tower (IA4) –no differences within 10% level on average TOT distributions, hit multiplicities and angular distribution (IA4) –Studied TKR number of strips/per cluster vs angle of incidence for planes with single clusters for runs from Pisa only (IA4) –Measured Intratower residuals, rotations and shifts –using hardcoded geometry and single tower runs (IA4) –Identified wrong usage of alignment constants in MC via “PSF” muon analysis (IA5) Cosmic Ray Shower Studies –Selected photon candidates –studied cleanest photon vertex topology (efficiency ~0.5%) (IA5) –Showed that TEM CC Error events are consistent with showers (effect is the level of )(IA5) –Showed that TOT distributions between muons and shower events are consistent with expectations (IA4)

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 11 What have we accomplished? (5) Instrument Operations –Trigger –Learned relation between TEM diagnostics enabled and trigger alignment by doing studies to a few% level (IA3) –TKR Studies on TACK differences from non-GASU to GASU based system (IA4) –Some studies showed confusion between how trigger works (used MC words instead of Gem info for trigger efficiency) (IA4) –Deadtime –In the absence of GPS could not use GEMDeltaEventTime for some timing studies and defined a new variable EvtTicks: this is the last event that triggered and if you have cuts then information is lost) (IA4) –TKR –Changed TKR settings and turned one-shots ON »if off whole towers could be dead until the trigger request goes low –TKR recommended »usage of random triggers for noise studies (IA3) »to trend thresholds, channels, and tot parameters (IA5) –CAL –Learned about CAL_LE retriggering close to the noise floor »not a problem for operations in orbit –Studied tail of pulse produced in the analog part of the FE by the digital readout from the CAL AFEE to the TEM (IA4) »Shaped readout noise could contribute to energy measurement error and probability is higher for high trigger rate (since most of these events come closer in time) –ACD –soon to come…

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 12 Suggestions for Instrument Analysis Workshop 7 (1) Update needed –System Wide –Provide final and validated list of calibration constants and operational settings for final tests at SLAC –Make tomography of all 3 detector systems for a final geometry validation –Study system level occupancies (TKR,CAL and ACD) by analyzing periodic triggers »Philippe already started a preliminary analysis this week –Compare runs with changes in PDU settings –Compare runs with changes in trigger rates (by adding external pulser) –TKR –Look for off-track clusters to estimate noise in TKR from PDU voltage changes –Study TKR number of strips/per cluster vs angle of incidence for planes with single clusters –Measure TKR noise occupancy versus maximum distance between clusters in a plane –Update data analysis with new limits to the TKR CC buffer –Verify that TEM TKR CC Error event rate is consistent with previous analysis –Intratower residuals, rotations and shifts for all towers –Verify that TOT distributions between muons and shower events are consistent with expectations »study events with ToT = 250 and 255 counts separately Trending –TKR trigger and hit efficiencies for all modules »study events crossing towers –TKR noisy, dead, partially dead strips –CAL –Verify stability of position and width of muon peaks for events in all trigger engines (when applicable) »with and without track extrapolation –Measure CAL muon peaks, width of Landau, longitudinal and transverse positions using extrapolated tracks »study inefficiencies (edges. gaps…) Trending –CAL trigger and hit efficiencies for all modules –CAL noisy channels with operation settings (if any) –ACD –Measure ACD muon peaks using extrapolated tracks »study inefficiencies (edges. gaps…) Trending –ACD calibration constants We will revisit these at the end of this workshop

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 13 Suggestions for Instrument Analysis Workshop 7 (2) New Analysis –Modify/adapt your analysis scripts for telemetry data –multiple trigger engine is coming and will affect your code… –Intratower residuals, rotations and shifts –inter tower alignment needed for assessing XY translations and rotation between towers (without hardcoded geometry) NRL to verify stability of alignment in different environmental conditions »how about shearing and vertical (Z) displacements? Should we care? –Deadtime –presence of GPS for reference –multiple trigger engines complicate deadtime calculations –the variable EvtTicks will need new algorithm –Verify track resolution by studying position distributions between ACD gaps –inefficiencies inside tiles, “resolutions” outside –CAL Triggers –Verify arrival time distributions for CAL_LE and CAL HE triggers using muons and photon candidates when LAT is oriented horizontally –Verify if we have enough statistics to study CNO events with ground data –Decode all error contributions into offline analysis files –study their occurrence and compare with expectations (ISOC) –Correlate science data with housekeeping (ISOC?) –correlate with hit multiplicities, efficiencies and noise occupancies »needed for NRL We will revisit these at the end of this workshop

GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 14 Logistics No Workshop Dinner! –we will benefit from the DC2 dinner Make sure you registered and paid –see Debbie during coffee break There will be talks during Lunch time ! Beam test Informal Meeting –18:00 today !