GLAST LAT Project17 August, 2001 S. Ritz 0 GLAST Large Area Telescope: Status of System-level Performance Simulations UPDATE (to 26 July presentation)

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

STAR Status of J/  Trigger Simulations for d+Au Running Trigger Board Meeting Dec5, 2002 MC & TU.
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
0 LAT Coordinate System LAT-TD (it’s in CyberDocs) Purpose: The hardware and software designs need a clear, consistent and universally accepted.
The Gamma-Ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE Anticoincidence Detector for GLAST Alexander Moiseev,
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
S. Ritz 1 Hardware Trigger Throttle Issues Context: the triggers Purpose of throttle on TKR trigger Earlier design using TKR geographic information The.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Off-axis Simulations Peter Litchfield, Minnesota  What has been simulated?  Will the experiment work?  Can we choose a technology based on simulations?
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
Brick Finding Ankara CM 2/4/2009 Dario Autiero. A large effort was put in the last months by a team of people in order to recover the events pending due.
EPAC June 2003 The EPAC June 2003 Questions 1. Clarify the Motivation for the Proposal. 2. How to ensure the e+ polarimeter works right away? 3. What is.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 S. Ritz 1 GLAST Large Area Telescope: Instrument Design Steven M. Ritz Goddard.
S. Ritz1 Checking Out What is Checked In  Need to optimize balance of checking between users and developers. –infuse more of a culture of detailed checking.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
Hardware Failure Impacts Exercises S. Ritz. Issues Recent results from design reliability analysis (system engineering, Thurston et al.) Probabilities.
Bill Atwood, Core Meeting, 9-Oct GLAS T 1 Finding and Fitting A Recast of Traditional GLAST Finding: Combo A Recast of the Kalman Filter Setting.
GLAST LAT Project S. Ritz 1 GLAST Large Area Telescope: Adding Converter to the Blank TKR Planes? Bill Atwood, Tune Kamae, Steve Ritz 4 September 2002.
GLAST LAT Project 1S. Ritz Discussion: To Where From Here? DC1 Closeout Meeting February 13, 2004 S. Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
1 Gamma-Ray Astronomy with GLAST May 24, 2008 Toby Burnett WALTA meeting.
Bill Atwood, SCIPP/UCSC, DC2 Closeout, May 31, 2006 GLAST 1 Bill Atwood & Friends.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 S. Ritz Backgrounds and Trigger Rates 1 Backgrounds and Trigger Rates on Orbit S. Ritz with many contributions.
Science Requirements Verification GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 2 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST Simulations Theodore E. Hierath Louisiana State University August 20, 2001.
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Summary of Core “Performance Review” for TkrRecon How do we know the Tracking is working?
30 Ge & Si Crystals Arranged in verticals stacks of 6 called “towers” Shielding composed of lead, poly, and a muon veto not described. 7.6 cm diameter.
Implementing a dual readout calorimeter in SLIC and testing Geant4 Physics Hans Wenzel Fermilab Friday, 2 nd October 2009 ALCPG 2009.
Introduction to gamma-ray astronomy GLAST-Large Area Telescope Introduction to GLAST Science New way of studying astrophysics Schedule of GLAST project.
T. Burnett1 GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 9, 2002 SAS Software: Sources Detector geometry model Simulation Event.
Simulation of the energy response of  rays in CsI crystal arrays Thomas ZERGUERRAS EXL-R3B Collaboration Meeting, Orsay (France), 02/02/ /03/2006.
Multi-TeV  -ray Astronomy with GRAPES-3 Pravata K Mohanty On behalf of the GRAPE-3 collaboration Tata Institute of Fundamental Research, Mumbai Workshop.
Bill Atwood, SCIPP/UCSC, May, 2005 GLAST 1 A Parametric Energy Recon for GLAST A 3 rd attempt at Energy Reconstruction Keep in mind: 1)The large phase-space.
GLAST Large Area Telescope (LAT) Overview Peter F. Michelson Instrument Principal Investigator Stanford University William E.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Aa GLAST Particle Astrophysics Collaboration Instrument Managed and Integrated at SLAC/Stanford University The Gamma-ray Large Area Space Telescope (GLAST)
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
HEP Tel Aviv University LumiCal (pads design) Simulation Ronen Ingbir FCAL Simulation meeting, Zeuthen Tel Aviv University HEP experimental Group Collaboration.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 3 Paul Dauncey, Imperial College London.
High Redshift Gamma-Ray Bursts observed by GLAST Abstract The Gamma-ray Large Area Space Telescope (GLAST) is the next generation satellite for high energy.
Event Analysis for the Gamma-ray Large Area Space Telescope Robin Morris, RIACS Johann Cohen-Tanugi SLAC.
10/10/2005 Alex Moiseev 2006 LAT Beam test 1 Suggestions to 2006 LAT prototype beam test plan Alex Moiseev, NASA/GSFC.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
Fermi Gamma-ray Space Telescope Searches for Dark Matter Signals Workshop for Science Writers Introduction S. Ritz UCSC Physics Dept. and SCIPP On behalf.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Gamma-ray Large Area Space Telescope -France -Germany -Italy -Japan -Sweden -USA Energy Range 10 keV-300 GeV. GLAST : - An imaging gamma-ray telescope.
1 Cosmic Ray Physics with IceTop and IceCube Serap Tilav University of Delaware for The IceCube Collaboration ISVHECRI2010 June 28 - July 2, 2010 Fermilab.
S. Ritz 1 Onboard Science Processing S. Ritz F-FIDT March 2002.
Gamma-ray Large Area Space Telescope ACD Final Performance
Comparison of GAMMA-400 and Fermi-LAT telescopes
GLAST LAT tracker signal simulation and trigger timing study
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope:
Jin Huang Los Alamos National Lab
Data Analysis in Particle Physics
Gamma-ray Large Area Space Telescope
Imaging crystals with TKR
GEANT Simulations and Track Reconstruction
Mini Tower Preliminary Results
Studies of the Time over Threshold
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

GLAST LAT Project17 August, 2001 S. Ritz 0 GLAST Large Area Telescope: Status of System-level Performance Simulations UPDATE (to 26 July presentation) S. Ritz Goddard LAT Instrument Scientist Representing the PDR/Baseline simulation group For status see: Gamma-ray Large Area Space Telescope

GLAST LAT Project17 August, 2001 S. Ritz 1 System-level Performance Simulations Outline  Brief review of July 26 presentation, actions  Work done since July  background fluxes settled  large generation runs  trigger rate studies  CAL bug fix, ACD segmentation final update  tools for peeling off events, readback of events  Status of actions  The LIST (what’s left to do now that the tools are in place) Result of much direct work by many people: Toby, Richard, Heather, Sasha, Ian, Karl, Leon, Tracy, Eduardo, Arache, Regis, … and based on the foundation provided by many others.

GLAST LAT Project17 August, 2001 S. Ritz 2 Summary of Requirements We use the simulation to evaluate the expected performance of the instrument design: Effective Area as a function of energy FOV (Effective Area as a function of angle) Energy resolution PSF (68%, 95%) as a function of energy and angle. Make parameterization for physics studies. Background rejection (and all of the above after background rejection selections) Trigger rates and data volume after L1T and L3T Failure mode effects on performance We use the beam tests and other measurements to verify the simulation.

GLAST LAT Project17 August, 2001 S. Ritz 3 Work done for proposal We did this work for the proposal: Why do it again for PDR/Baseline? –quantitative assessment of performance impact of incremental design changes –better modeling of backgrounds –check results and make improvements. move analysis forward. –side benefits: opportunity to use and improve tools. simulation and reconstruction have undergone major architectural changes -- lost some functionality but gained much more solid foundation. this is an opportunity to pull everything back together. Source% rate Avg L1T Rate [Hz] Chime  albedo 4196 Electron130 Albedo p TOTAL5470

GLAST LAT Project17 August, 2001 S. Ritz 4 For PDR, we must present the basic performance parameters of the instrument and show they meet the relevant LAT Performance Specifications. The following elements must be in place to begin this evaluation process: updated, validated, and documented geometry to match the current design, along with configuration control of the design parameters; review noise and threshold parameters; updated source fluxes, incorporating the improved understanding; a documented release of the simulation and reconstruction in the new framework, including the new event storage format; a version of the event display that is compatible with the new simulation, reconstruction, and event storage format; machinery in place to generate the necessary statistics of signal and background events. We specify a requirement of >10 million background events, with a goal of 100 million background events generated and analyzed. The machinery must include a simple mechanism to identify each event uniquely, and the capability to produce from an event list files with a subset of the full event sample; an updated version of merit, or an equivalent tool, to run in the new environment. Ideally, this tool could run both on the stored events and on a new standard tuple. Depending on the size of the full events, a standard tuple may be a practical necessity. a basic analysis framework to operate on the new event stores. PDR Simulation Work Requirements (2/2001)

GLAST LAT Project17 August, 2001 S. Ritz 5 new carbon cell design implemented detailed description of top and bottom supporting frames detailed description of cell closeout and electronics compartment at the sides of towers. all calorimeter dimensions are up-to-date. CAL Geometry Update Work done by Sasha (CAL group) CsI Support frame cylindrical end supports

GLAST LAT Project17 August, 2001 S. Ritz mm CAL Geometry Update (II)

GLAST LAT Project17 August, 2001 S. Ritz 7 ACD and GRID Geometry Updates ACD support structure consists of an approximated core material and two face sheets. The gap between the tiles and the towers reflects the current design. Thermal blanket is modeled as it was for the AO, using one average density material. Back-most side rows now single-tiles GRID flange between TKR and CAL (treated as a separate volume) is undergoing modification to reflect the current design. Also adding ACD base frame. Work done by Heather (ACD group) with help from Eduardo NEW

GLAST LAT Project17 August, 2001 S. Ritz 8 New Features: Dimensions correspond to latest design Better treatment of top and bottom trays More accurate composite materials MCM boards included Better segmentation of tray faces MCM Boards Silicon Bias board, tray face, glue Bias board, glue tray face, glue Tungsten TKR Geometry Update Work done by Leon (TKR group) closeouts carbon-fiber walls + screws

GLAST LAT Project17 August, 2001 S. Ritz 9 Level 1 Trigger TKR 3-in-a-row CAL-LO = any single log with recorded energy > 100 MeV CAL-HI = any tower with 3-layers-in-a-row each with >0 logs with recorded energy > 1 GeV (NEW! see LAT-TD , 16 July) L1 Trigger word: ___ ___ ___ ___ ___ <- (LSB) Will continue to study details of performance of new CAL-HI proposal in this round of simulations. ACD throttle of L1T now included in tuple. TKR CAL-LO CAL-HI ACD LO ACD (unused) NEW

GLAST LAT Project17 August, 2001 S. Ritz 10 Background Fluxes Implementation by source, comparisons and justifications Sanity checking – EGRET A-Dome rates L1T rates see LAT-TD Mizuno et al Note by Allan Tylka 12 May 2000, and presentations by Eric Grove AMS Alcaraz et al, Phys Lett B484(2000)p10 and Phys Lett B472(2000)p215 NEW

GLAST LAT Project17 August, 2001 S. Ritz 11 New Orbit-max Fluxes (the new tools are great!!) total Integrates to ~10 kHz/m 2

GLAST LAT Project17 August, 2001 S. Ritz 12 New Orbit-avg Fluxes Integrates to ~4.2 kHz/m 2

GLAST LAT Project17 August, 2001 S. Ritz 13 Sanity Check The measurements of the flux components may have unsubtracted backgrounds – adding them up could result in double-counting. Also, fluxes below 100 MeV are mostly blind guesses. Need a unitarity check – look at EGRET A-dome rates. The proposed orbit-max flux amounts to ~10 kHz/m 2 Also sent fluxes to Eric Grove, Ormes and Kamae for comments, and discussed fluxes with experts at Goddard.

GLAST LAT Project17 August, 2001 S. Ritz 14 EGRET A-dome Rates (courtesy of Dave Bertsch) A-dome has an area of ~6 m 2, so orbit max rate (outside SAA and no solar flares) corresponds to ~16 kHz/m 2 This represents a conservative upper-limit for us, since the A-dome was sensitive down to 10’s of keV. Note peak rate is at (24.7,260) SAA

GLAST LAT Project17 August, 2001 S. Ritz 15 Orbit Max Rates – Preliminary! all [inc albedo_  ] chimemax albedo_p_max CR e- maxalbedo e+e- flux (kHz/m 2 ) L1T (Hz)13,0257,3833,499841,803 L1T frac L1TV (Hz)5, , L1TV frac Notes: as we expected, the unthrottled L1T rate is now > 10 kHz with the ACD throttle on the TKR trigger, the total max rate is 6 kHz. If the max A-dome rate is due entirely to particles that trigger us (it isn’t), naïve scaling results in an orbit-max throttled rate of 9 kHz. Appears we have some margin. we have a ceiling, finally.

GLAST LAT Project17 August, 2001 S. Ritz 16 Data set generation planning Main challenge is generating backgrounds ~ 50M events (~half-hour equiv.) –Would take months to generate on a PC –Use SLAC batch (Linux/Solaris) system, requires 2-3 days Linux build of pdrApp now running (7/24/01) –Disk space (800 GB fileserver) is in place –DataManager ready to generate and book-keep events Since early June, we have been generating increasingly larger photon and background data sets:Since early June, we have been generating increasingly larger photon and background data sets: –iterate to find the bugs and missing pieces (inspect sets of events, study distributions, effects of cuts, use tools, …) –complete and exercise the infrastructure –Generated 5M event data set ~1 week ago. Demonstrated. 50M event run gearing up. Using avg flux. [one minor glitch last night] –Exercised tuple preselections and chaining; subset selectivity (remaining backgrounds at any stage of filtering); readback/re- analysis/event display of event subsets last week. Need to finish event history display. NEW

GLAST LAT Project17 August, 2001 S. Ritz 17 Failure Modes Modeling Tools to do this not yet tested.Now part of our regular planning (see, e.g., May study on using ACD as L1T throttle). Loss of functionality will be handled in the simulation as an “after-burner” analysis on the large data set. Tools to do this not yet tested. Difficult part is putting awareness into the reconstruction (as we would if failure really happens) – results for PDR will be rudimentary. ACD: loss of a single tile in three locations (front corner, front middle, side). TKR: impact of loss of a layer on trigger efficiency. TKR+CAL loss of a tower. Not possible to explore the infinite combinatorics. Highest priority prior to PDR is to do one tile and 1 TKR layer failure: L1T, L3T, effective area impacts.

GLAST LAT Project17 August, 2001 S. Ritz 18 Actions from 26 July Presentation “Please make sure low energy positrons ( MeV) are included in a worst-case background analysis.” Done, extended below 100 MeV. “Please simulate the loss of ½ the light from 18 PMTs on one of the 12 electronics boards.” Withdrawn. “Please run the simulation with isotropic electrons of 10 GeV and show that no more than 3 in 10 4 are accepted as gammas, along with the resulting effective area.” On the list. “Will the trade study to identify potential ACD extension impact the grid design, and will it be complete by September? If not, when? It may impact S/C.” The essential gaps and geometries are now in the new simulation, along with the potentially problematic fluxes. Already see not a likely problem for on-board operations. Answer on ultimate ground-based background rejection analysis will come with the full analysis automatically. First hand-scan of residual events not worrisome, but new cuts are necessary and must be carefully evaluated. The analysis is only part of the issue. The issue should be systematically addressed by the IDT. Check that the physics of the simulation code to simulate low energy proton interactions. On the list. If this is a problem, it will show up in the analysis of the 50M event run shortly. Tools exist to evaluate.

GLAST LAT Project17 August, 2001 S. Ritz 19 Much Left To Do Re-do overall ground-based background rejection selections validation. Deal with new fluxes. Recalculate Aeff and FOV. Specifically evaluate combined effect of ACD gap and low energy particle fluxes. Demonstrate 10 GeV electron rejection. PSF evaluation vs. energy, angle, front/back. Energy resolution. Finish baselining L3 algorithms Tools now ready. Help is needed. Join the fun.

GLAST LAT Project17 August, 2001 S. Ritz 20 Backups

GLAST LAT Project17 August, 2001 S. Ritz 21 L3 Filtering (orbit max case) chime albeo_p albdeo_  electron albedo e+e- Open L1T rate: 13,025 Hz Throttled L1T rate: 5,968 Hz ACD_DOCA cut at 25 || CAL_Hi caveat: the current version of ROOT interactive cuts is FLAKY! Beware. Not checked yet!

GLAST LAT Project17 August, 2001 S. Ritz 22 L3 Filtering (Orbit Max Case) DOCA cut, (#tracks>0||CAL>5 GeV visible): 167 Hz Track-CAL match Cal_Fit_errNrm< Hz at orbit max => ~30 Hz avg #xtals note! >30 Hz even at orbit max due to <100 MeV e+e-. Is that real? No matter, we can deal with it. Not checked yet!

GLAST LAT Project17 August, 2001 S. Ritz 23 L3 Filtering (Orbit Max Case) Visible CAL energy CAL Hi Rate: 40 Hz “L3” inspection of CAL_Hi not implemented yet Fraction of energy in front 3 CAL layers Require fraction in 1 st 3 CAL layers >10% OR Cal_Energy > 10 GeV: 34 Hz at orbit max. Just first looks with new fluxes and geometry. Gamma distributions on the way. Not checked yet!

GLAST LAT Project17 August, 2001 S. Ritz 24 Results: status First peek at PSF looks ~not terrible (much to do!) total 68% total 95% front 68% front 95% back 68% back 95% 100 MeV normal inc GeV normal incidence Note: normal incidence PSF is not particularly relevant for physics – just a well-defined comparison point for performance changes and code checking. “Normal” in Table means 0-8 deg bin. results are pre-pre-pre- preliminary!

GLAST LAT Project17 August, 2001 S. Ritz 25 Aside: some definitions 68%95% Effective area (total geometric acceptance) (conversion probability) (all detector and reconstruction efficiencies). Real rate of detecting a signal is (flux) A eff Point Spread Function (PSF) Angular resolution of instrument, after all detector and reconstruction algorithm effects. The 2-dimensional 68% containment is the equivalent of ~1.5  (1- dimensional error) if purely Gaussian response. The non-Gaussian tail is characterized by the 95% containment, which would be 1.6 times the 68% containment for a perfect Gaussian response.

GLAST LAT Project17 August, 2001 S. Ritz 26 Experimental Technique Instrument must measure the direction, energy, and arrival time of high energy photons (from approximately 20 MeV to greater than 300 GeV): - photon interactions with matter in GLAST energy range dominated by pair conversion: determine photon direction clear signature for background rejection  e+e+ e–e– calorimeter (energy measurement) particle tracking detectors conversion foil anticoincidence shield Pair-Conversion Telescope instrument must detect  -rays with high efficiency and reject the much higher flux (x ~10 4 ) of background cosmic-rays, etc.; energy resolution requires calorimeter of sufficient depth to measure buildup of the EM shower. Segmentation useful. Energy loss mechanisms: - limitations on angular resolution (PSF) low E: multiple scattering => many thin layers high E: hit precision & lever arm high E: hit precision & lever arm

GLAST LAT Project17 August, 2001 S. Ritz 27  e+e+ e–e– Primary Design Impacts of Science Requirements Energy range and energy resolution requirements set thickness of calorimeter Effective area and PSF requirements drive the converter thicknesses and layout. PSF requirements also drive the design of the mechanical support. Field of view sets the aspect ratio (height/width) Time accuracy provided by electronics and intrinsic resolution of the sensors. Electronics Background rejection requirements drive the ACD design (and influence the calorimeter and tracker layouts). On-board transient detection requirements, and on-board background rejection to meet telemetry requirements, drive the electronics, processing, flight software, and trigger design. Instrument life has an impact on detector technology choices. Derived requirements (source location determination and point source sensitivity) drive the overall system performance.

GLAST LAT Project17 August, 2001 S. Ritz 28 Design and Simulations The GLAST baseline instrument design is based on detailed Monte Carlo simulations. Two years of work was put into this before any significant investment was made in hardware development. –Cosmic-ray rejection of >10 5 :1 with 80% gamma ray efficiency. –Solid predictions for effective area and resolutions (computer models now verified by beam tests). Current reconstruction algorithms are existence proofs -- many further improvements are possible. –Practical scheme for triggering. –Design optimization. Simulations and analyses are all OO (C++), based on GISMO toolkit. Zoom in on a corner of the instrument First TKR module plane module walls scintillators front scintillators gaps, dead areas included The instrument naturally distinguishes most cosmics from gammas, but the details are essential. A full analysis is important. proton gamma ray

GLAST LAT Project17 August, 2001 S. Ritz 29 X Projected Angle 3-cm spacing, 4% foils, MeV Data Monte Carlo Simulations validated in detailed beam tests Experimental setup in ESA for tagged photons: (errors are 2  ) GLAST Data Monte Carlo

GLAST LAT Project17 August, 2001 S. Ritz 30 Instrument Triggering and Onboard Data Flow Hardware trigger based on special signals from each tower; initiates readout Function: “did anything happen?” keep as simple as possible TKR 3 x y pair planes in a row ** workhorse  trigger x x x Instrument Total L1T Rate: Function: reject background efficiently & quickly with loose cuts, reduce computing load remove any noise triggers x x x tracker hits ~line up track does not point to hit ACD tile L3T: full instrument Function: reduce data to fit within downlink Total L3T Rate: complete event reconstruction signal/bkgd tunable, depending on analysis cuts:  cosmic-rays  ~ 1:~few Spacecraft OR (average event size: ~7 kbits) rates are orbit averaged; peak L1T rate is approximately 10 kHz. L1T rate estimate being revised. ** ACD may be used to throttle this rate, if req. Upon a L1T, all towers are read out within 20  s Level 1 Trigger CAL: LO – independent check on TKR trigger. HI – indicates high energy event ground Level 2 Processing Level 3 Processing L2 was motivated by earlier DAQ design that had one processor per tower. On-board filtering hierarchy being redesigned. On-board science analysis: transient detection (AGN flares, bursts)

GLAST LAT Project17 August, 2001 S. Ritz 31 LAT Instrument Basics 4x4 array of identical towers4x4 array of identical towers Advantages of modular design. Precision Si-strip Tracker (TKR)Precision Si-strip Tracker (TKR) Detectors and converters arranged in 18 XY tracking planes. Measure the photon direction. Hodoscopic CsI Calorimeter(CAL)Hodoscopic CsI Calorimeter(CAL) Segmented array of CsI(Tl) crystals. Measure the photon energy. Segmented Anticoincidence Detector (ACDSegmented Anticoincidence Detector (ACD First step in reducing the large background of charged cosmic rays. Segmentation removes self-veto effects at high energy. Central Electronics SystemCentral Electronics System Includes flexible, highly-efficient, multi-level trigger. Systems work together to identify and measure the flux of cosmic gamma rays with energy 20 MeV - >300 GeV.

GLAST LAT Project17 August, 2001 S. Ritz 32 Background Rejection Overview First developer of background rejection analysis: Bill Atwood (lots of work also by Jay, Toby, Heather, Cathie, Sawyer, Jose, Paul, Taro, SR, … Analysis done thus far for two main reasons: (1) A reasonable way to quote our effective area. (2) A proof of principle and a demonstration of the power of the instrument design. Not the final background analysis! Other techniques are available to reduce the backgrounds further with good efficiency (particularly using TKR pattern recognition). The analysis for the AO response was done in triage mode, and there is much to do now. Some science topics may require less stringent background rejection than others. Issues of duration, visible energy range, etc. Same points also hold for the event reconstruction we have thus far.

GLAST LAT Project17 August, 2001 S. Ritz 33 Ideally (and usually) cut variable distributions are examined several ways, first to check the distribution is sensible and then for implementing the selections: 1) raw (after triggers, depending on tuple) arbitrary 2) cumulative - the distribution of the next cut variable after all previous cuts. Note, this order is arbitrary (mostly) and the distributions can be misleading, so…. 3) “all but”: look at each variable distribution with every cut but this one applied. 4) niche areas: check for effects of each cut in different energy ranges and different angles of incidence. (usually done with merit first) 5) interplay with track quality cuts: the effects of the track quality cuts and the background rejection cuts are not orthogonal: track quality cuts usually help in background rejection somewhat, and background cuts sometimes help clean up PSF. In one case, an “all but” background distribution was empty! Optimize these together. 6) n-dimensionally (usually 2 at a time) : look for correlations and domains of well- clustered S/B for like variables. Note that a neural net very well addresses (3), (5) and (6). These cuts are not orthogonal, and there is a better space in which to make them. Background Analysis

GLAST LAT Project17 August, 2001 S. Ritz 34 try to keep the cuts away from steep areas, or right next to individual events (avoid fine-tuning). process is iterative: With each variable, look at distributions for gammas and background and choose a preliminary cut value. Scan remaining background events and lost gamma events for adjusting cut and to determine potentially new cut variables. Check for cut redundancy and correlation. Check impact on instrument performance. Merit is particularly useful here. As a practical matter, some days are spent mostly improving the rejection and other days are spent mostly improving the gamma efficiency. Background Analysis (cont)

GLAST LAT Project17 August, 2001 S. Ritz 35 AO Overview: Visible (CAL) Energy Distributions at Various Stages Although the cosmic ray spectrum peaks around 4-20 GeV, the deposited energy is typically much lower. The region below 1 GeV is the most difficult for background rejection for several reasons. (38, actually, but who’s counting?) Note, after all selections, no background events remain with visible energy greater than 200 MeV. This wasn’t easy. Important: at the time of the large data set generation for the AO, the albedo proton flux was not implemented. It was implemented for the rate studies, but the energy spectrum was wrong. We thought this was pessimistic.

GLAST LAT Project17 August, 2001 S. Ritz 36 Some references (beyond meeting presentations): 1) DoE proposal (1998) 2) Note of 9 August 1999 (describes cuts and problem areas fairly well, needs distributions included) 3) AO response however, better documentation is needed and will be done in this round of studies. STEPS The famous VETO_DOCA (only for CsI_Energy_Sum<20) - getting better, but still somewhat broca. Needs improvement. “Hit pattern” - Surplus_Hit_Ratio, with an energy-dependent application. Surplus_Hit_Ratio>2.25 || (CsI_Energy_Sum>1&&fst_X_Lyr>13) || CsI_Energy_Sum>5. (note: description uses AO tuple variable names)

GLAST LAT Project17 August, 2001 S. Ritz 37 keep events w/no CAL info whenever possible. “CAL info” - CsI_Fit_errNrm, CsI_Xtal_Ratio -- keep events w/no CAL info whenever possible. “Track quality” (most recent selections developed by Jose) “S/C induced event cuts” - designed to remove cosmics whose primary interaction is in the S/C. This is our single largest residual background! STEPS (continued) CsI_Xtal_Ratio>0.25||CsI_No_Xtals<1 (CsI_Energy_Sum<1.&&CsI_Fit_errNrm<10.)||CsI_Fit_errNrm<4.||CsI_No_Xtals<1 No_Vetos_Hit 1. && No_Vetos_Hit 50. Quality_Parm>10 (composite track quality parameter, cut effective against low-energy stubs from splash-up) CsI_eLayer8/CsI_Energy_Sum 0.25 || CsI_Energy_Sum>0.35||CsI_No_Xtals<1 CsI_moment1 0.35||CsI_Energy_Sum>1.|| CsI_No_Xtals<1 CsI_Z>-30.||CsI_No_Xtals<1 CsI_No_Xtals_Trunc 75.||fst_X_Lyr<12 Only needed in BACK Surprisingly efficient even at high energy (Will work on making this one continuous in energy with a normalized moment) Background Analysis Steps (II)

GLAST LAT Project17 August, 2001 S. Ritz 38 Next steps: Use better background flux model. Low energy p and e albedo must be dealt with. Demonstrate high-energy electron rejection. Improve low energy Aeff, work on inefficiencies (Surplus_Hit_Ratio, CsI_Fit_errNrm) VETO_DOCA: needs work. Mainly a tracking issue. Seed tracks with hit tiles, track quality selections for loop. Document, put correct implementation into merit. Simplify analysis (make prettier, simpler). Bring in neural net. More sophisticated tracking (downward “ ”) & CAL pattern recognition. (post-PDR) Further improvements in rejection (at time of AO, integrated residual background rate was ~ 6% of extragalactic diffuse rate). Also, study background rate differentially (by visible energy bin). More work on upward-going energy events. Evaluate impact of limited set of instrument failure modes (see end of talk) V Background Analysis To Do