Operations Management

Slides:



Advertisements
Similar presentations
LEAN PRODUCTION Ron Lembke Operations Management.
Advertisements

LEAN PRODUCTION Ron Lembke Operations Management.
1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
JIT AND LEAN PRODUCTION SYSTEM BY AMAR P. NARKHEDE.
Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., –1 Managerial Issues Using JIT as a tool for controlling the flow of materials,
Just-In-Time and Lean Systems
Dr. Ron Lembke SCM /16” How accurately can you measure? 1 mm = 1/25” 1/32”
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
Just-In-Time Philosophy
Operations Management
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
JIT/Lean Production. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 15, Slide 2 Some.
Kaizen: continuing improvement Dr. Ron Tibben-Lembke SCM 462.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Lean and Sustainable Supply Chains. 1. Describe how Green and Lean can complement each other. 2. Explain how a production pull system works. 3. Understand.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean operations and JIT
1 JUST IN TIME SYSTEMS Figen KAS Dokuz Eylul University Industrial Engineering Department.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Chapter 7, Lean Thinking and Lean Systems
Just-In-Time Manufacturing David Comita Arielle Herold Jaslyn Moore Shanelle Williamson.
Just-In-Time Philosophy
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Manufacturing.  Manufacturing is all about converting raw material into consumer or industrial products.  A firms manufacturing competency is based.
LEAN system.
JIT – Just-In-Time Production
JIT and Lean Operations
Just-in-Time and Lean Systems
Lean Production The elimination of waste in the production process.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
DEMAND FLOW TECHNOLOGY
Operations Fall 2015 Bruce Duggan Providence University College.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Lean operations and JIT
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Pull Manufacturing and Just In Time
Operations Management
Operations Management
Chapter 12 Just-in-Time and Lean Systems
Just-In-Time and Lean Production
Industrial Engineering Department, Dokuz Eylul University, Turkey
Just In Time.
PRODUCTION AND OPERATIONS MANAGEMENT
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

Operations Management Lean Production Ron Tibben-Lembke Operations Management

Just In Time-- What is It? Integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials, WIP, and FGI. Big JIT A.k.a. “lean production” -- Eliminate waste in all aspects of production activities Little JIT – scheduling goods inventories and production, as needed Also known as Stockless Production, Toyota Production System

Toyoda Automatic Loom Sakichi Toyoda (1867-1930) – Invented a loom which stops automatically if the thread breaks. His son Kiirchiro, started the automotive department of Toyoda Loom Works.

JIT Origins in Japan Post-WWII Japanese industry in ruins “Catch up to Americans in 4 years!” Kiichirō Toyoda, 1946 Toyoda made delivery trucks and motorcycles, and not many of either

-- the early years First two Toyopet Crowns arrive U.S. 1957

Ohno – Reduce Waste If Americans are 9x as productive, we must be wasting something. (p.3) “The basis of the Toyota production system is the absolute elimination of waste.” (Ohno, p. 4)

Waste Waste is ‘anything other than the minimum amount of equipment, materials, parts, space, and workers’ time which are absolutely essential to add value to the product. --Shoichiro Toyoda President, Toyota Motor Co. If you put your mind to it, you can squeeze water from a dry towel. -- Eiji Toyoda, President 1967-1982

Elimination of Waste Knew they wouldn’t beat U.S. with product innovation, concentrated on licensing patents, and producing more efficiently Costs prevented mass-production, volume strategy of American firms. Find ways to reduce waste, cost Shigeo Shingo (at right) & Taiichi Ohno, pioneers

Two Pillars of Toyota System Just-in-Time: a flow of right parts, at the right time, in the right quantity Autonomation: ‘Automation with a human touch’ (make machine mistake-proof) Workers don’t have to baby-sit machines Stop automatically if downstream machine stops

Couldn’t Emulate GM GM huge batches in huge factories Japan’s area is 10% less than California and 70% agricultural. Put entire population of CA into 30% of state, then add 6 times as many people. (and you thought LA was crowded). Land extremely expensive Sprawling factories not an option

Small Batches GM’s large batches require large amounts of storage space. GM produces in large batches because of significant setup costs. If Toyota had the same large setup costs, it could never afford small batches. Reduce setup cost to reduce batch size. GM didn’t think of doing this.

7 Types of Waste (Ohno 1988) Overproduction Time on Hand (waiting time) Transportation Stock on Hand - Inventory Waste of Processing itself Movement Making Defective Products

Seven Elements to Eliminate Waste Focused Factories Group Technology Quality at the Source JIT production Uniform Plant Loading Kanban production control system Minimized setup times

Focused Factories Small, specialized plants No huge, vertically integrated plants 30 -1,000 workers Tom Peters

Group Technology-Layout Not enough WIP to have 1 person run 4 milling machines Don’t departmentalize, organize machines by product type Cellular layout Much less inventory sitting around Batch size of one

Cross Training To maintain the flow, workers have to be able to help out as needed Rotate workers through jobs: Keep skills sharp (managers too - prove they know what they’re doing) Reduce boredom & fatigue Expand understanding of overall picture Increase potential for new ideas

Employee Input Employee has a brain, why not use it? Quality circles look for ways to improve Emphasis on Continuous Process Improvement

Total Quality Management Not a lot of parts to sift through to find a good one Can’t afford high defect rates Since low WIP, get quick feedback on errors

Ask ‘Why’ 5 Times 5W = 1H 1. Why did the machine stop? Overload and fuse blew 2. Why the overload? Not lubricated 3. Why not lubricated? Oil pump not pumping? 4. Why not pumping? Pump shaft worn out. 5. Why worn out? No screen, scrap got in

Just-in-Time Downstream processes take parts from upstream as they need. Like an American Supermarket: Get what you want when you want it in the quantity you want.

Kanban Japanese for ‘signboard’ Method Toyota used for implementing JIT Each work station has a fixed # kanbans. In order to produce, you need both material to work on, and an available kanban.

Kanban Worker 2 finishes a part, outbound moves over Flow of work 2 3 Worker 2 finishes a part, outbound moves over 2 gets another part to work on: 2 takes off 1’s green tag giving it back to 1, and puts on her blue tag and moves it into position.

Kanban When 3 finishes a part, Finished parts move over one spot Flow of work 2 3 When 3 finishes a part, Finished parts move over one spot He has to have a red tag available to put on, He gets a part from 2’s outbound pile, And gives the blue back to 2

Kanban When 3 finishes a part, Flow of work 2 3 When 3 finishes a part, Finished parts move over one spot He has to have a red tag available to put on, He gets a part from 2’s outbound pile, And gives the blue back to 2 3’s production will be taken by 4, offstage right. Tag goes back into 3’s bin

Kanbans 2 3 Red finishes his part next. 2 3 But 4 hasn’t freed up any of the red kanbans, so there is nothing for 3 to work on now. 3 could maintain his machine, or see if 4 needs help 2 3

How is this Different? Processes can become idled (blocked) or starved This makes you painfully aware of problems in your system. Material moves through the system so quickly no in-process recordkeeping is needed.

Importance of Flow Ohno was very clear about this: “Kanban is a tool for realizing just-in-time. For this tool to work fairly well, the process must be managed to flow as much as possible. This is really the basic condition. Other important conditions are leveling the product as much as possible, and always working in accordance with standard work methods. -- Ohno, 1988, p. 3

Performance and WIP Level Less WIP means products go through system faster reducing the WIP makes you more sensitive to problems, helps you find problems faster Stream and Rocks analogy: Inventory (WIP) is like water in a stream It hides the rocks Rocks force you to keep a lot of water (WIP) in the stream

Lowering Inventory Reduces Waste WIP hides problems

Lowering Inventory Reduces Waste WIP hides problems

Lowering Inventory Reduces Waste Reducing WIP makes problem very visible STOP

Lowering Inventory Reduces Waste Remove problem, run With less WIP

Lowering Inventory Reduces Waste Reduce WIP again to find new problems

A contrasting opinion “Inventory is not the root of all evil, inventory is the flower of all evil. - Robert Inman, General Motors

Setup Reduction Can’t afford to do huge runs Have to produce in small batches Toyota Die Change: 3 hours down to 3 SMED: under ten minutes Techniques Make internal setups into External Eliminate Adjustments Eliminate the Setup

Capacity Buffers System is inflexible, no inventory buffers, so to respond, need excess capacity Schedule less than 24 hours per day ‘Two-Shifting’ 4-8-4-8 Cross Training

What about making several products? Each station has to keep on hand parts to satisfy anything downstream station might ask for Want to avoid many parts for each of several products This means more WIP, more inventory, more expense, unless we produce in smaller batches

Production Smoothing & Sequencing Master production schedule: 10,000 /mo. 500 day, 250 a shift 480 minutes means 1 every 1.92 minutes Sequencing: If mix is 50% A, 25% B, 25% C, produce A-B-A-C-A-B-A-C…

Suppliers Buyer & Supplier form JIT partnerships JIT partnerships eliminate: Unnecessary activities In-plant inventory In-transit inventory Poor suppliers

Characteristics of JIT Partnershps Few, nearby suppliers Supplier just like in-house upstream process Long-term contract agreements Steady supply rate Frequent deliveries in small lots Buyer helps suppliers meet quality Suppliers use process control charts Buyer schedules inbound freight

Supplier Worries Lack of flexibility Poor customer scheduling Long-term contract with 1 customer Poor customer scheduling Frequent engineering changes Strict quality assurance Small lot sizes Close physical proximity

Supplier Relationships American model: keep your nose out of my plant. Gain info to force price cuts Lack of trust between suppliers Firm encourages suppliers to share knowledge, because they don’t worry about competing Firm helps supplier increase quality, reduce costs

Preventative Maintenance Unexpected loss of production is fatal to system and must be prevented Additional maintenance can prevent downtime, or minimize length of interruptions, when they do occur

Inventory Traditionally, inventory exists in case problems arise. JIT objective: Eliminate inventory JIT requires Small lot sizes Low setup time Containers for fixed number of parts JIT inventory: Minimum inventory to keep system running.

Lessons Learned from JIT The environment can be a control - don’t take setups for granted Operational details are very important (Ford, Carnegie) Controlling WIP is important Flexibility is an asset Quality can come first Continual improvement is necessary for survival

What is not JIT Having shipments come in just when you need them does not mean JIT goals accomplished If supplier still produces in large lots, but delivers in small, you have just forced supplier to incur the holding costs

System Requirements Runs with very little inventory Requires high quality Management philosophy of continuous and forced problem solving Elimination of waste

Lean Tools Value Stream mapping Takt time (German for pace or beat) available work time per shift = ------------------------------------------- Customer demand per shift Cycle time = how often a piece comes off of production line

Where to get more information Taiichi Ohno - Toyota Production System Schonberger - Japanese Manufacturing Techniques Factory Physics - Hopp & Spearman Shigeo Shingo - Toyota Production System

JIT Books in English 1981 –Shigeo Shingo – “Study of the Toyota Production System” 1982 – Richard Schonberger – “Japanese Manufacturing Techniques” 1983 – Richard Hall “Zero Inventories” 1988 – Taiichi Ohno – “Toyota Production System” 1989 – Shigeo Shingo – “Study of the Toyota Production System”