The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May 22 2006.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectBeam Test SW F.Longo1 PS Simulation Recent activities –Pipeline runs 0 and 40 Electrons and 0 0 and 90.
Advertisements

CU Beamtest Workshop III, June 28-30, 2006 C. Cecchi – S. Germani – M. Pepe Offline Monitor for CU Beam Test Claudia Cecchi Stefano Germani Monica Pepe.
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT ProjectCU Beam Test 11/8/2005 L. Latronico1 Glast LAT Calibration Unit Beam Test at CERN Overview of Tasks 11/8/2005.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
PID, trigger and DAQ for the GLAST beam test (preliminary study) Nicola Mazziotta INFN Bari Dec. 6, 2005.
GLAST LAT Project Collaboration Meeting 8/30/ Beam Test Plan - SLAC End Station A Secondary Beams Gary Godfrey August 30, 2005 GLAST Collaboration.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project Test Beam Meeting, June 6, 2006 S. Funk 1/6 PS Positron Simulations Stefan Funk June 6, 2006.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectBeam Test Meeting 1/21/2006 L. Latronico1 Beam test activity in Italy Integration & test activities –1x1 tower completed and under test.
R.Dubois Sim/Recon Overview 1/10 GLAST LAT ProjectSoftware Workshop July, SLAC Sim/Recon Overview Elements of Simulation/Reconstruction Development,
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
1 GLAST-LAT Calibration Unit Shipment to SLAC Plan Review Luca Latronico Alessandro Brez Michele Pinchera
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
PrimEx collaboration meeting Energy calibration of the Hall B bremsstrahlung tagging system using magnetic pair spectrometer S. Stepanyan (JLAB)
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
GLAST LAT ProjectGlast Collaboration Meeting 2005 R. Bellazzini1 Glast beam test at CERN Glast Collaboration Meeting 2005.
Gamma-ray Large Area Space Telescope 15th INTERNATIONAL WORKSHOP ON VERTEX DETECTORS September , 2006 Perugia, Italy GLAST Silicon Tracker beam.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
Selected Pictures Luca Latronico - INFN on behalf of the beam test team GLAST Collaboration Meeting Stockholm 8/29/2006 GLAST Large Area Telescope: Calibration.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST Beamtest 2006 Pisa R.Dubois1/3 Offline Possibilities for Ancillary Data Handling.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
CT-PPS DB Info (Preliminary) DB design will be the same as currently used for CMS Pixels, HCAL, GEM, HGCAL databases DB is Oracle based A DB for a sub-detector.
GSI Test Preparation Visit to GSI october 12 Installation plan agreed
Simulation Tools for Test Beam
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
ACD in 2006 CERN beam test Here I am listing beam test ACD issues for discussion: ACD will be represented in CERN beam test instrument by minimum 4, and.
Gamma-ray Large Area Space Telescope ACD Final Performance
Comparison of GAMMA-400 and Fermi-LAT telescopes
Preparation for CERN test beam
The interaction region for FIRST (status report)
DAMPE Status (T9) Steadily taking data since last Thursday
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Imaging crystals with TKR
Status Report and highlights from workshop II
A. Herlert, CERN PH-SME-IS
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May

GLAST LAT ProjectLAT C&A Meeting 5/22/2006 L. Latronico2 Beam Test Schedule Threat from CERN CERN beam test schedule subjected to changes –major failure at PS power supply requires 6 weeks for repair –first 6 weeks of physics program, scheduled to start today, have been cancelled first beam expected on july 3 at PS, july 24 at SPS –new users schedule in preparation and to be approved by CERN Research Board (next meeting june 7) CU activities proceeding on the assumption that previous schedule is still valid for us –CU integration complete (see next slide) –AD and DAQ available, currently working on upgrades

GLAST LAT ProjectLAT C&A Meeting 5/22/2006 L. Latronico3 The GLAST-LAT Calibration Unit bay 3 bay 2 bay 1 bay 0 CAL 101 CAL 119 CAL 109 TKR 8 TKR 16 CU integration completed may 19 – currently under test

GLAST LAT ProjectLAT C&A Meeting 5/22/2006 L. Latronico4 CU Beam Test Workshop Summary Very successful meeting –39 attendees (25 from INFN, 4 from France, 8 from US, 2 from Sweden) Many interesting contributions –Check at

GLAST LAT ProjectLAT CU Beam Test Workshop 3/20/2006 L. Latronico5 SPS Setup Clean e - and p beams requested at CERN – should be available all the time Setup defined and able to tag also non-clean beams (cerenkov+TRD) All hardware in place (detector + DAQ) Detailed plan of operation in preparation (Benoit)

GLAST LAT ProjectLAT CU Beam Test Workshop 3/20/2006 L. Latronico6 PS Setup magnet ON for  magnet OFF for e-,p EM CAL as  veto for e+ MMS+thermal blanket target for e+ annihilation e+ target Many contributions to study performance, limitations and use of the  -tagger  – tagger performance report and operation plan in preparation, taking into account –calibration procedure (minimize nb of configurations and set-up time) –tagger resolution limit (especially at low energy where CU resolution is better) –SSD active area and SSD mechanics dead areas (not to interfere with  and e beams) Protons: sweet spot ~10GeV (all directions) –no need for TOF at lower energy (was not there yet!) but require C2  cannot remove it to increase tagger lever arm Very clean positrons beam for annihilation study: sweet spot ~<1GeV (re-entrant)  require TRD Requests for , e-, p, e+ : flexible PID but very limited space at T9

GLAST LAT ProjectLAT CU Beam Test Workshop 3/20/2006 L. Latronico7 Ancillary Systems Status  -tagger –baseline working at INFN-Pisa, soon to take data with CU: 4 XY Si-SSD from INFN-TS readout by AD DAQ from INFN- Bari –current minimum dead time in 0-suppression is ~800  s –upgrades: INFN-Bari is building a Si-ladder for the 4 th tagger plane to increase acceptance TRD working at INFN-Bari, available for both PS and SPS runs Large set of scintillators available for trigger and veto –Gary/Benoit working to provide a 2mm thick plastic for triggering to limit X0 along beam –INFN working on support mechanics for all PMs Line Cerenkenkov for PID –Requests for gas/pressure being agreed with CERN Passive beam dump for photon mode with lead bricks from CERN

GLAST LAT ProjectLAT CU Beam Test Workshop Summary – C&A 4/3/2006 L. Latronico8 ACD Handling and Test 2 ACD tiles connected to FREE board successful testing (functional + light tightness) using LATTE last 3 tiles coming mid june specific request for calibration runs on the beam (Alex)

GLAST LAT ProjectLAT CU Beam Test Workshop Summary – C&A 4/3/2006 L. Latronico9 Off-line –Mass production launched and ready for new production Operator requested –CU and AD data streams merge will happen according to plans LDF as a baseline – must be in place by mid june Root level as backup –AD digis and recon being implemented in Gleam –Calibration file for AD will be defined by INFN and supported by Joanne –BT Tuple definition in progress –Gleam offline monitor definition complete – example soon with first CU data

MC data production New production soon SPS runs  runs not needed p at more energies and angles more statistics available since 2 weeks ago

GLAST LAT ProjectLAT CU Beam Test Workshop Summary – C&A 4/3/2006 L. Latronico11 More Highlights Computing infrastructure –Baseline: 3 dedicated machine from SLAC for DAQ, database, data storage and FastCopy to SLAC –Backup: current PCs for DAQ, dedicated PC for data storage –Network architecture agreed with CERN Logistics –Pasquale discussed access to CERN, security issues, network access - instructions posted to beamlist

GLAST LAT ProjectLAT CU Beam Test Workshop Summary – C&A 4/3/2006 L. Latronico12 Conclusions We are on schedule Much progress happening on all sides Experimental setup defined Operational plans for both PS and SPS runs being written Dedicated report on tagger in preparation Update on beam test plan in progress More focus on data analysis expected soon