Aggregate Planning. Overview Aggregate planning in the planning process Aggregate planning in the planning process Aggregate planning strategies Aggregate.

Slides:



Advertisements
Similar presentations
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Advertisements

Operations Management Dr. Ron Tibben-Lembke
Operations Management Aggregate Planning Chapter 13
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Operations Management Aggregate Planning Chapter 13
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
PRODUCTION AND OPERATIONS MANAGEMENT
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Operations Management Dr. Ron Lembke
Operations Management
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Manufacturing’s Objectives
Supply Chain Management (SCM) Aggregate Planning
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Alternatives.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Operations Planning Horizons
Aggregate Planning and Master Scheduling
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Ardavan Asef-Vaziri Systems and Operations Management
© 1997 Prentice-Hall, Inc Principles of Operations Management Aggregate Scheduling Chapter 12.
Lesson 16 Aggregate Planning
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 20 1.
Operations Management Aggregate Planning
1 1 Slide Aggregate Planning Professor Ahmadi. 2 2 Slide Planning Tasks and Responsibilities.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Aggregate Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice Hall, Inc. All rights reserved. Alternatives Quarter Total.
13 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 13 Aggregate Planning.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice Hall, Inc. All rights reserved. Alternatives Quarter Total.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Aggregate Planning Chapter 14
Chapter 14 Aggregate Planning.
13 Aggregate Scheduling PowerPoint presentation to accompany
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Dr Sh Salleh bin Sh Ahmad
Aggregate Planning and S&OP
13 Aggregate Scheduling PowerPoint presentation to accompany
Aggregate Production Planning (APP)
Presentation transcript:

Aggregate Planning

Overview Aggregate planning in the planning process Aggregate planning in the planning process Aggregate planning strategies Aggregate planning strategies Capacity optionsCapacity options Chase strategy Chase strategy Level strategy Level strategy Demand optionsDemand options Mixing optionsMixing options Graphical/charting methods Graphical/charting methods Linear programming Linear programming Simulation Simulation

Planning Relationships

Business or annual plan

Planning Relationships Business or annual plan Aggregate plan – production and staffing plan

Planning Relationships MPS or workforce schedule Business or annual plan Aggregate plan – production and staffing plan

Planning Relationships MPS or workforce schedule Business or annual plan Aggregate plan – production and staffing plan

Planning Relationships MPS or workforce schedule Business or annual plan Aggregate plan – production and staffing plan

Planning Horizons Today3 Months 1 year5 years Planning Horizon Intermediate-range plans Sales planning Production planning and budgeting Setting employment, inventory, subcontracting levels Analyzing operating plans Responsible: Operations managers

Planning Horizons Today3 Months 1 year5 years Planning Horizon Long-range plans R&D New product plans Capital expenses Facility location, expansion Responsible: Top executives

Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Responsible: Operations managers, supervisors, foremen

Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range plans Sales planning Production planning and budgeting Setting employment, inventory, subcontracting levels Analyzing operating plans Long-range plans R&D New product plans Capital expenses Facility location, expansion Responsible: Operations managers, supervisors, foremen Responsible: Operations managers Responsible: Top executives

Planning hierarchy

Planning horizon Long range: Years Itermediate range: 6 – 18 months Short range: Weeks Planning hierarchy

Planning horizon Long range: Years Itermediate range: 6 – 18 months Short range: Weeks Scope Entire production line i.e. Ford trucks Product Family i.e. Ford F series Specific model i.e. Ford F-150 Planning hierarchy

What is an aggregate plan?

Managerial Inputs

Aggregate plan

Managerial Inputs Aggregate plan Customer needs Demand forecasts Competition behavior Distribution and marketing

Managerial Inputs Cost data Financial condition of firm Accounting and finance Aggregate plan Customer needs Demand forecasts Competition behavior Distribution and marketing

Managerial Inputs Labor-market conditions Training capacity Human resources Cost data Financial condition of firm Accounting and finance Aggregate plan Customer needs Demand forecasts Competition behavior Distribution and marketing

Managerial Inputs New products Product design changes Machine standards Engineering Labor-market conditions Training capacity Human resources Cost data Financial condition of firm Accounting and finance Aggregate plan Customer needs Demand forecasts Competition behavior Distribution and marketing

Managerial Inputs Supplier capabilities Storage capacity Materials availability Materials New products Product design changes Machine standards Engineering Labor-market conditions Training capacity Human resources Cost data Financial condition of firm Accounting and finance Aggregate plan Customer needs Demand forecasts Competition behavior Distribution and marketing

Managerial Inputs Supplier capabilities Storage capacity Materials availability Materials Current machine capacities Plans for future capacities Workforce capacities Current staffing level Operations New products Product design changes Machine standards Engineering Labor-market conditions Training capacity Human resources Cost data Financial condition of firm Accounting and finance Aggregate plan Customer needs Demand forecasts Competition behavior Distribution and marketing

Aggregate Planning Objectives  Minimize Costs/Maximize Profits  Maximize Customer Service  Minimize Inventory Investment  Minimize Changes in Production Rates  Minimize Changes in Workforce Levels  Maximize Utilization of Plant and Equipment

Aggregate Planning Strategies Pure Strategies Capacity Options — change capacity: Capacity Options — change capacity: changing inventory levelschanging inventory levels varying work force size by hiring or layoffsvarying work force size by hiring or layoffs varying production capacity through overtime or idle timevarying production capacity through overtime or idle time subcontractingsubcontracting using part-time workersusing part-time workers

Aggregate Planning Strategies Pure Strategies Demand Options — change demand : Demand Options — change demand : influencing demandinfluencing demand backordering during high demand periodsbackordering during high demand periods counterseasonal product mixingcounterseasonal product mixing

Advantage/Disadvantages of Aggregate Planning Options See Table 13.1

Mixing the options: The Extremes Level Strategy Chase Strategy Production equals demand Production rate is constant

Level planning strategy Level planning strategy Produce same amount every monthProduce same amount every month Keep work force level constantKeep work force level constant Find alternative work for employees when there is less demand Find alternative work for employees when there is less demand Vary non-work force capacity or demand optionsVary non-work force capacity or demand options Inventory levels allowed to fluctuate Inventory levels allowed to fluctuate Often results in lowest production costsOften results in lowest production costs Toyota, Nissan employ this strategyToyota, Nissan employ this strategy Aggregate Planning Strategies

Chase planning strategy Chase planning strategy Output rates match demandOutput rates match demand Vary work force levelVary work force level Hiring/laying off Hiring/laying off Vary non-work force capacity or demand optionsVary non-work force capacity or demand options Overtime and outsource Overtime and outsource Part time employees Part time employees Service industries often utilize this strategyService industries often utilize this strategy Hospitality, construction, education Hospitality, construction, education Aggregate Planning Strategies