Topics from this weeks 2E34 meeting M. Weaver Jan 6, 2006.

Slides:



Advertisements
Similar presentations
1 Vacuum Pressure Calculations. 2 Vaccalc The program vaccalc was used for all calculations. The program required three pieces of information for each.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,
Initial rough Background comparisons between Run5 and Run 4 Guy Wormser LAL Orsay.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
MDI meeting, Nov First look at Transient Recorder data Livio Piemontese Stan Ecklund and Mark Petree have installed – in the IR2 alcove – a 32.
W. KozaneckiMDI meeting, 16 Jan 2004 BaBar-wide Background monitoring  Motivation  institutionalize...  through a weekly report to PEP-II/BBR meeting.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Deadtime Sensitivity Trigger rate varies over a wide range DCH quadrant 0 (upper east) drives high deadtime periods Do backgrounds target upper east DCH?
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
W. KozaneckiMCC AP meeting, 24 Apr 06 Slide 1 Using the gas-induced beam blowup to measure vertical IP beam sizes  Principle  heat PR02 VP8020.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk,
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Working Group D Backgrounds M Sullivan for everyone in WG D IRENG07 Sept 20, 2007.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
ILC IP SR and PEP-II M. Sullivan for the ILC IR engineering workshop IRENG07 Sept 17-21, 2007.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans:
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
M. Sullivan International Review Committee November 12-13, 2007
(on behalf of the DAFNE team)
John T. Seeman DOE PEP-II Operations Review April 26, 2006
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
Weekend Summary Squirted N2 at 3027 under various conditions
A.Kulikov SLAC MAC review October 2003
U. Wienands, PEP-II Run Coordinator …for the PEP-II team
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
PEP-II Status and Plans e+e- Factories Workshop
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
To Do list, open items as of 10-Feb \ Study threshold dependence on bunch length (Just changed Vrf to 4.5.
Orbit Bumps in PEP-II to Maximize Luminosity
Energy Changes and the IR
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
Presentation transcript:

Topics from this weeks 2E34 meeting M. Weaver Jan 6, 2006

January Goals Recover currents and luminosity –1.5 A x 2.4 A –Fix vacuum leaks –Fix transverse feedback issues Recover L = 1E34 –1.75 A –3.0 A –Fix fast LER instability Integrate –15 fb-1 in January –800 pb-1 in one day –Average 1E34 for week J.Seeman

Status We have uncovered at least two problems A pressure rise in the HER at the boundary between straight 6 and arc 7 –Started to rise Dec 22 Vacuum spikes seen in IR2 very close to the detector –Starting time for these events less certain M. Sullivan et. al

First pair of pumps in arc and 9012 Last pair of pumps in straight and 8103 M. Sullivan et. al

Late news (ink is still wet) Leak in PR06 found and fixed with VacSeal M. Sullivan et. al

Pressure spikes near the BaBar detector M. Sullivan et. al

LER HER nTorr SIG11 LER sensitive 2600 (100 is high) nTorr 3027 gauge and pump 300 and 200 nTorr 3044 ? nTorr LER frangible link M. Sullivan et. al

Most likely candidate for this kind of pressure burst is an arc Most likely suspect would be the frangible link but we have to get pump 3044 working… Will try single ring again and have strip charts running to look for pressure spikes. BaBar in the off state can take much higher radiation levels. Look into acoustic detectors? Look into other ways of detecting an arc… Summary of IR2 pressure bumps M. Sullivan et.al Implemented upstream and downstream of the frangible link on an abort-triggered oscilloscope LER IR2 vacuum pumps VP3027, VP3044, and VP3050 added to the kHz abort data logger. VGCCs will be added later, but latency may be a problem. First abort showed that vacuum spikes followed increased background levels by ~0.5 second but preceded the abort by 0.2 seconds.