A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.

Slides:



Advertisements
Similar presentations
Simona Bettoni and Remo Maccaferri, CERN Wiggler modeling Double-helix like option.
Advertisements

Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
Magnets for the ESRF upgrade phase II
SCU Measurements at LBNL
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
SCU Magnet Modelling: Tolerances and Beam Trajectories Ben Shepherd Superconducting Undulator Workshop RAL, April 2014.
1 Long-term Variation of the Magnet Alignment In SPring-8 Storage Ring Main events of magnet alignment Long-term monitoring Variation of magnet alignment.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Performance Analysis Using Genesis 1.3 Sven Reiche LCLS Undulator Parameter Workshop Argonne National Laboratory 10/24/03.
Undulator Physics Requirements April 7, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
X-Ray Diagnostics for the LCLS Jan , 2004 UCLA.
Undulator Overview FEL Performance Assessment
LCLS Prototype Undulator Design LCLS Prototype Undulator Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
Undulator Physics Update October 12, 2004 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics Update.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf Undulator Bench October 14, Undulator Bench Requirements Zack Wolf SLAC.
Undulator Specifications Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Number of Blocks per Pole Diego Arbelaez. Option – Number of Blocks per Pole Required magnetic field tolerance of ~10 -4 For a single gap this can be.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
SCU1 Vertical Test Results Matt Kasa 9/16/2014. Vertical Cryostat Assembly Coil Training Record the current decay and the terminal voltage across the.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
LCLS-II Physics Meeting, May 08, 2013 LCLS-II Undulator Tolerances Heinz-Dieter Nuhn LCLS-II Undulator Physics Manager May 8, 2013.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
MBA Magnets MultiBend Achromat Magnets 8/14/2015 Review By Mark Jaski.
FEL Simulations: Undulator Modeling Sven Reiche Start-end Workshop DESY-Zeuthen 08/20/03.
1 BROOKHAVEN SCIENCE ASSOCIATES 1 NSLS-II Lattice Design 1.TBA-24 Lattice Design - Advantages and shortcomings Low emittance -> high chromaticity -> small.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
ILC Z-pole Calibration Runs Main Linac performance
Magnetic Measurements For The LCLS Undulator System
CHEN, Fusan KANG, Wen November 5, 2017
Magnets for the ESRF upgrade phase II
LCLS Undulator Fiducialization
Undulator Tolerances for LCLS-II using SCUs
SCU Next Phase Meeting July 8, 2014.
Phase Adjustments: K vs
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
Beam-Based Alignment Results
Multi-Turn Extraction for PS2 Preliminary considerations
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department of Energy I. Vasserman Recent Measurements of the LCLS Prototype Undulator: Canted Pole Gap Design and Hall Probe Center Calibration LCLS UNDULATOR SYSTEM REVIEW March 3 - 4, 2004

Pioneering Science and Technology Office of Science U.S. Department of Energy 2 Argonne March, Outline Magnetic measurements vs. X (horizontal motion) of canted pole gap design (3 mrad cant) -Effective magnetic field -RMS phase error -Trajectory Fringe Fields Fine adjustment of effective magnetic field End gap correction (is it needed)? Hall probe center calibration Summary

Pioneering Science and Technology Office of Science U.S. Department of Energy 3 Argonne March, Measured slope of 6.6 Gauss/mm agree with calculations (~ 5.7 Gauss/mm for 3 mrad cant) Alignment accuracy needed for  B/B ~ 1.5x10 -4 ~ 2 Gauss -> 0.3 mm Effective magnetic field

Pioneering Science and Technology Office of Science U.S. Department of Energy 4 Argonne March, RMS phase error No significant dependency on X An RMS phase error of ~ 6.5 degree is an upper limit for near- perfect (~100%) performance

Pioneering Science and Technology Office of Science U.S. Department of Energy 5 Argonne March, Horizontal trajectory (averaged over period length) at 14.1 GeV Trajectory vs. X well behaved and well within the tolerance requirement of 2  m maximum walk-off from a straight line Operational range is ±1.2 mm for ±1.0°C temperature compensation

Pioneering Science and Technology Office of Science U.S. Department of Energy 6 Argonne March, Fringe fields at X=65 and 100 mm Fringe fields with new shims are close to earth field for X=100 mm. (Earth field contribution to trajectory shift has to be corrected.)

Pioneering Science and Technology Office of Science U.S. Department of Energy 7 Argonne March, Fine adjustment of effective magnetic field (Procedure to tune the field) 1. Select spacers with thickness step ~ 15 µm to set the effective field in the range of ±30 Gauss (1 µm in gap corresponds to ~ 2 Gauss in field). 2. Set horizontal position of spacers to adjust the effective field to ~ ±6 Gauss (spacers are wedged with 3  m/mm cant) 3. Set horizontal position of the undulator as a whole so that the effective field is in the range ±2 Gauss (  B/B ~ ±1.5x10 -4 ) (This step is required to save time and to provide better accuracy) 4. The undulator horizontal position could be remotely controlled during operation to compensate for in-tunnel temperature variations (motion of ±1.2 mm for ±1°C needed). Such option is available, if quadrupoles are separated from undulator sections

Pioneering Science and Technology Office of Science U.S. Department of Energy 8 Argonne March, End gap correction (is it needed)? Slippage length L = u (1+K 2 eff /2) -> change in slippage period in free space is the main contributor to break length errors (if K eff is adjusted to compensate for particle energy loss) Tolerance criterion for phase error between undulator segments is ~ 10 . It corresponds to  L/ L~ u * K eff *  K eff /L= 10/360, from where  K eff /K eff ~ 1.6% for minimum break length. Real break length error depends on actual particle energy loss and break length chosen. This error will accumulate over distance. Computer simulations are required to examine this case. Remotely-controlled end gap correction for final part of undulator line may be useful. (Or adjustment of break lengths can be done in advance, if reliable energy loss data will be available.)

Pioneering Science and Technology Office of Science U.S. Department of Energy 9 Argonne March, Magnetic needles for alignment Only one needle is required for alignment in the X direction One more needle has to be added at Y=0 for alignment in the Y direction

Pioneering Science and Technology Office of Science U.S. Department of Energy 10 Argonne March, Hall probe center calibration in X Accuracy of calibration < 50 µm (limited by encoder resolution) one needle used

Pioneering Science and Technology Office of Science U.S. Department of Energy 11 Argonne March, Hall probe center calibration in Y Accuracy of calibration < 5 µm. This procedure will be used to define distance of needle (By=0) from device magnetic center one needle used

Pioneering Science and Technology Office of Science U.S. Department of Energy 12 Argonne March, Summary A 3 mrad pole gap cant was chosen and tested, using wedged spacers between the aluminum base plates and the titanium core Magnetic measurements show good agreement with calculated change of the effective magnetic field versus X (horizontal motion). No significant change of the RMS phase error versus X was measured, hence no degradation of FEL performance is expected. Additional flexibility of gap correction is provided by shifting the spacers in the X direction so that the effective magnetic field can be set to the required tolerance (  B/B ~ 1.5x10 -4 ). This can be achieved even at X=0 by moving the spacers.

Pioneering Science and Technology Office of Science U.S. Department of Energy 13 Argonne March, Summary, cont’d Additional advantage of the canted pole gap design is the easy of introducing a tapered field by moving the ends of the device in opposite directions in X during tuning. (This is impossible for other fixed-gap devices.) A disadvantage of this option is the necessity to provide a separate support for vacuum chamber Estimate of particle energy loss shows that remotely-controlled end corrections are not needed for the regular part of the undulator line. Computer simulations will be required to investigate the necessity to apply this correction to the final part of the undulator line. Magnetic needle tests confirmed that this feature is an effective alignment tool. The canted pole gap design looks very promising and appears to be the best choice to proceed for fine adjustment of the effective magnetic field