Japan considerations on design and qualification of PFC's for near term machines (ITER) Satoshi Suzuki 1, Satoshi Konishi 2 1 Japan Atomic Energy Agency.

Slides:



Advertisements
Similar presentations
Further Modifications to the ARIES T-tube Divertor Concept Jeremy Burke ARIES-Pathways Project Meeting Jan 26,
Advertisements

First Wall Heat Loads Mike Ulrickson November 15, 2014.
ASIPP EAST Tungsten-copper Divertor Development For EAST Present by D. -M. Yao EAST-Divertor Group, ASIPP-Hefei, China 25 th Symposium on Fusion Engineering.
ASIPP HT-7 & EAST 17 th International Conference on Plasma Surface Interactions in Controlled Fusion Devices, May, 2006, Hefei China H.Li Presented.
High Performance Divertor Target Plate, a Combination of Plate and Finger Concepts S. Malang, X.R. Wang ARIES-Pathway Meeting Georgia Institute of Technology,
Page 1 of 15 Tungsten Structures for High Heat Flux Components: Opportunities & Challenges M. S. Tillack and the ARIES Team Japan-US Workshop on Fusion.
Swiss Industries - 20 th June Divertor and Blanket Systems: Design, Required technologies and Schedule M. Merola Head of the Internal Components.
Be/FS joining for ITER TBM Ryan Matthew Hunt FNST Meeting August 18, 2009 A collaboration between UCLA, SNL-Livermore, Brush-Wellman, Axsys Inc. and Bodycote.
Thermo Fluid Design Analysis of TBM cooling schemes M. Narula with A. Ying, R. Hunt, S. Park ITER-TBM Meeting UCLA Feb 14-15, 2007.
Japan-US Workshop held at San Diego on April 6-7, 2002 How can we keep structural integrity of the first wall having micro cracks? R. Kurihara JAERI-Naka.
Presented by: S. Suzuki, Blanket Engineering Lab., Japan Atomic Energy Research Institute, JAERI Contents 1.Outline of blanket development in JAERI 2.Design.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
August 17, 2000 ARIES: Fusion Power Core and Power Cycle Engineering/ARR 1 ARIES: Fusion Power Core and Power Cycle Engineering The ARIES Team Presented.
ARIES High Heat Flux Components Workshop UCSD December 2008 Summary of Session 1 Near term HHFC design and R&D (ITER) Session Coordinator Richard.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
March 3-4, 2008/ARR 1 Power Management Technical Working Group: TRL for Heat and Particle Flux Handling A. René Raffray University of California, San Diego.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft 02/24/2005 T. Ihli PL FUSION FZK - EURATOM ASSOCIATION 1 He-cooled Divertor Development in the.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
Application of Infrared Thermography in NDT of Plasma-Facing Components for Tokamaks Pan QI, Qiang LI, Guang-Nan LUO Institute of Plasma Physics Chinese.
Overview of LLCB TBM for ITER Paritosh Chaudhuri Institute for Plasma Research Gandhinagar, INDIA CBBI-16, Sept. 2011, Portland, USA.
1 Recent Progress in Helium-Cooled Ceramic Breeder (HCCB) Blanket Module R&D and Design Analysis Ying, Alice With contributions from M. Narula, H. Zhang,
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
Dr. G. Appa Rao Defence Metallurgical Research Laboratory
HCCB TBM Mechanical Design R. Hunt, A. Ying, M. Abdou Fusion Science & Technology Center University of California Los Angeles May 11, 2006 Presented by.
1 Solid Breeder Blanket Design Concepts for HAPL Igor. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
Selection of Plasma Facing Components for ITER and ITER Operational plan V. Chuyanov (Thanks to Y. Shimomura ) ITPA Garching May
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
W coating of CFC tiles for the JET new wall - Task Agreement: JW6-TA-EP2-ILC-05 Manufacturing and testing of W-coated CFC tiles for installation in JET.
Design study of advanced blanket for DEMO reactor US/JP Workshop on Fusion Power Plants and Related Advanced Technologies 23 th -24 th Feb at UCSD,
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Work Plans for FY06 Sandia National Laboratories Michael Ulrickson Presented at PFC Technology Meeting May 9-11, 2005 At PPPL Sandia is a multiprogram.
2. Tritium extraction, inventory, and control in fusion systems Why? Unprecedented amounts of highly mobile, radioactive, elemental tritium are used as.
Pacific Northwest National Laboratory U.S. Department of Energy TBM Structure, Materials and Fabrication Collaboration Issues R.J. Kurtz 1, and A.F. Rowcliffe.
1 Parametric Thermal-Hydraulic Analysis of TBM Primary Helium Loop Greg Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI.
HIGH HEAT FLUX PEAKING FACTORS AND ENHANCEMENT Ronald D. Boyd Sr., PhD, PE, PI Distinguished Professor, Honeywell Professor, Director of the Thermal Science.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
Pacific Northwest National Laboratory U.S. Department of Energy Initial Cost Estimates for Development of DCLL TBM Ferritic Steel Structural Components.
1 Neutronics Parameters for the Reference HAPL Chamber Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
US Test Blanket Module Partially Integrated Testing Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for.
Page 1 of 15 Robust High-Performance First Wall Design and Analysis X. R. Wang, S. Malang, M. S. Tillack and the ARIES Team Japan-US Workshop on Fusion.
Forschungszentrum Karlsruhe FZK - EURATOM ASSOCIATION 05/14/2005 Thomas Ihli 1 Status of He-cooled Divertor Design Contributors: A.R. Raffray, and The.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Helium-Cooled Divertor Options and Analysis
Development of tritium breeder monitoring for Lead-Lithium cooled ceramic breeder (LLCB) module of ITER presented V.K. Kapyshev CBBI-16 Portland, Oregon,
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
Session 3.2: Material – PMI and High Heat Flux Testing R. Neu: Recent PMI Experience in Tokamaks R. Doerner: PMI Issues beyond ITER M. Roedig: High Heat.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
Mario Merola EU R&D on Divertor Components Presented by Mario Merola EFDA Close Support Unit, Garching, Germany.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
Leslie Jones Target Design Engineer Goran Skoro, Steve Lilley, (Stuart Ansell)– Neutronic Dan Wilcox – Engineering Simulation Dan Coates – CAD - TRaM ISIS.
Technology R&D Activities for the ITER full-Tungsten Divertor
Page 1 of 19 Design Improvements and Analysis to Push the Heat Flux Limits of Divertors M. S. Tillack, X. R. Wang, J A. Burke and the ARIES Team Japan-US.
ISIS TS1 Project: Target Design and Analysis
FIP/1-1 Development of Tungsten Monoblock Technology for ITER Full-Tungsten Divertor in Japan 25th Fusion Energy Conference (FEC 2014) Saint Petersburg,
Full-scale trial results to qualify optimized manufacturing plan for ITER Toroidal Field coil winding pack in Japan Dummy double-pancake (DP) winding was.
DCLL TBM Reference Design
Integrated Design: APEX-Solid Wall FW-Blanket
WG4 – Progress report R. Santoro and A. Tauro.
He-cooled Divertor Design Approach
Modified Design of Aries T-Tube Divertor Concept
A. Vertkov et al., SC “Red Star”, Moscow, Russia
Presentation transcript:

Japan considerations on design and qualification of PFC's for near term machines (ITER) Satoshi Suzuki 1, Satoshi Konishi 2 1 Japan Atomic Energy Agency 2 Kyoto University

Contents Development / provisional procurement activity of the ITER divertor outer vertical target Development / provisional procurement activity of the ITER divertor outer vertical target Small divertor mock-ups Small divertor mock-ups Non-destructive examination by using infrared thermography Non-destructive examination by using infrared thermography Development of the first wall of the ITER test blanket module (TBM) Development of the first wall of the ITER test blanket module (TBM) Provisional high heat flux test of the full-poloidal length TBM first wall mock-up Provisional high heat flux test of the full-poloidal length TBM first wall mock-up Development of the DEMO divertor Development of the DEMO divertor Small divertor mock-ups made of ferritic steel with tungsten armor Small divertor mock-ups made of ferritic steel with tungsten armor

Development / provisional procurement activity of the ITER divertor outer vertical target Development / provisional procurement activity of the ITER divertor outer vertical target Small divertor mock-ups Small divertor mock-ups Non-destructive examination by using infrared thermography Non-destructive examination by using infrared thermography Development of the first wall of the ITER test blanket module (TBM) Development of the first wall of the ITER test blanket module (TBM) Provisional high heat flux test of the full-poloidal length TBM first wall mock-up Provisional high heat flux test of the full-poloidal length TBM first wall mock-up Development of the DEMO divertor Development of the DEMO divertor Small divertor mock-ups made of ferritic steel with tungsten armor Small divertor mock-ups made of ferritic steel with tungsten armorContents

ITER Plasma Facing Components Among the divertor high heat flux components, JAEA is going to procure all of the outer vertical target Among the divertor high heat flux components, JAEA is going to procure all of the outer vertical target 22 plasma facing units / 1 cassette 22 plasma facing units / 1 cassette 54 cassettes + 6 spares 54 cassettes + 6 spares --> 1320 plasma facing units Outer vertical target (JA) Inner vertical target (EU) Dome(RF) Cassette body (EU) Cross sectional view of ITER ITER divertor

Outer vertical target Design heat flux Design heat flux Tungsten part : 5MW/m 2 Tungsten part : 5MW/m 2 CFC (Carbon Fiber Composite) part : MW/m 2 CFC (Carbon Fiber Composite) part : MW/m 2 Coolant condition Coolant condition Water, 4MPa, 100 o C Water, 4MPa, 100 o C Swirl flow by twisted tape (CFC part) Swirl flow by twisted tape (CFC part) Bonding of armor materials Bonding of armor materials Braze Braze HIP (Hot Isostatic Pressing) HIP (Hot Isostatic Pressing) Prior to the procurement of the vertical target components, the manufacturing process and the thermal performance of the components should be validated/demonstrated by using small mock-ups. ("Prequalification" activity) Prior to the procurement of the vertical target components, the manufacturing process and the thermal performance of the components should be validated/demonstrated by using small mock-ups. ("Prequalification" activity) Outer vertical target (1 cassette) with "Monoblock" geometry

Optimization of the manufacturing process by using small mock-ups Armor : CFC (CX-2002U) Armor : CFC (CX-2002U) Tube : CuCrZr Tube : CuCrZr Bonding : Brazing (T braze =980 o C) Bonding : Brazing (T braze =980 o C) Ni-Cu-Mn Ni-Cu-Mn Ti-Cu-Ni Ti-Cu-Ni Metalizing of CFC Metalizing of CFC Present : Ti-Cu (5 - 10%-Ti) Present : Ti-Cu (5 - 10%-Ti) Accuracy of machining of CFC hole Accuracy of machining of CFC hole +/- 5 microns to the target value +/- 5 microns to the target value High heat flux test has been performed to check the soundness of the braze interface and to demonstrate the thermal performance. High heat flux test has been performed to check the soundness of the braze interface and to demonstrate the thermal performance. A small vertical target mock-up simulating the CFC part of the vertical target

High heat flux test of the small mock-ups and fabrication of a qualification prototype Braze filler : Ni-Cu-Mn (980 o C x 0.5h, followed by Ar gas quench) Braze filler : Ni-Cu-Mn (980 o C x 0.5h, followed by Ar gas quench) Metalizing : Present (Ti-Cu, %-Ti) Metalizing : Present (Ti-Cu, %-Ti) Aging : 475 o C x 2h Aging : 475 o C x 2h Finally, the mock-up fabricated by using parameters above could withstand the heat flux of 20MW/m 2 for 1000 cycles. Finally, the mock-up fabricated by using parameters above could withstand the heat flux of 20MW/m 2 for 1000 cycles. at 5 MW/m 2 (EB heating) ~500mm CFC Tungsten ITER vertical target Qualification Prototype Based on the successful result of the small mock-ups, a medium scale mock-up (Qualification Prototype) has been manufactured. Based on the successful result of the small mock-ups, a medium scale mock-up (Qualification Prototype) has been manufactured. This mock-up includes most of the critical technical issues (bonding of CFC/Cu, curved cooling tube, etc...) on the fabrication of the ITER divertor vertical target. This mock-up will be high heat flux tested in Efremov institute in This mock-up includes most of the critical technical issues (bonding of CFC/Cu, curved cooling tube, etc...) on the fabrication of the ITER divertor vertical target. This mock-up will be high heat flux tested in Efremov institute in 2008.

High heat flux test of the small mock-ups and fabrication of a qualification prototype Braze filler : Ni-Cu-Mn (980 o C x 0.5h, followed by Ar gas quench) Braze filler : Ni-Cu-Mn (980 o C x 0.5h, followed by Ar gas quench) Metalizing : Present (Ti-Cu, %-Ti) Metalizing : Present (Ti-Cu, %-Ti) Aging : 475 o C x 2h Aging : 475 o C x 2h Finally, the mock-up fabricated by using parameters above could withstand the heat flux of 20MW/m 2 for 1000 cycles. Finally, the mock-up fabricated by using parameters above could withstand the heat flux of 20MW/m 2 for 1000 cycles. at 5 MW/m 2 (EB heating) ~500mm CFC Tungsten ITER vertical target Qualification Prototype The high heat flux test of the first mock-up (VTQP-1) has been completed in November, This mock-up has successfully withstood the heat flux requirements as follows; The high heat flux test of the first mock-up (VTQP-1) has been completed in November, This mock-up has successfully withstood the heat flux requirements as follows; CFC : 10MW/m 2 x MW/m 2 x 1000cycles CFC : 10MW/m 2 x MW/m 2 x 1000cycles W : 3MW/m 2 x MW/m 2 x 1000 cycles W : 3MW/m 2 x MW/m 2 x 1000 cycles Based on this, Japan Domestic Agency (JADA) has been qualified to proceed the subsequent divertor procurement. Based on this, Japan Domestic Agency (JADA) has been qualified to proceed the subsequent divertor procurement.

Development of a new NDE facility "FIND" (Facility of Infrared Non-destructive examination for Divertor) In parallel to the optimization of the manufacturing process, acceptance test methods have also been provided. In parallel to the optimization of the manufacturing process, acceptance test methods have also been provided. In addition to the conventional methods (UT, RT, He leak testing for the braze/weld joint), infrared thermography examination is essential for the non-destructive examination of the vertical target. In addition to the conventional methods (UT, RT, He leak testing for the braze/weld joint), infrared thermography examination is essential for the non-destructive examination of the vertical target. UT can detect the interfacial defects between CuCrZr tube and soft copper interlayer. CFC (porous) UT sensor Internal defect of CFC or interfacial defect between CFC and soft copper can not be detected by UT. CFC (porous)

Development of a new NDE facility "FIND" (Facility of Infrared Non-destructive examination for Divertor)

By monitoring of the thermal transient of the mock-ups due to switching of the hot/cold water, internal defect of the CFC or interfacial defect of the CFC/Cu joint can be detected. By monitoring of the thermal transient of the mock-ups due to switching of the hot/cold water, internal defect of the CFC or interfacial defect of the CFC/Cu joint can be detected. Time-to-time differential of the thermal transient between defected and non-defected mock-ups gives quantitative evaluation of the defect size and the location with the help of FEM analysis. Time-to-time differential of the thermal transient between defected and non-defected mock-ups gives quantitative evaluation of the defect size and the location with the help of FEM analysis.

Development / provisional procurement activity of the ITER divertor outer vertical target Development / provisional procurement activity of the ITER divertor outer vertical target Small divertor mock-ups Small divertor mock-ups Non-destructive examination by using infrared thermography Non-destructive examination by using infrared thermography Development of the first wall of the ITER test blanket module (TBM) Development of the first wall of the ITER test blanket module (TBM) Provisional high heat flux test of the full-poloidal length TBM first wall mock-up Provisional high heat flux test of the full-poloidal length TBM first wall mock-up Development of the DEMO divertor Development of the DEMO divertor Small divertor mock-ups made of ferritic steel with tungsten armor Small divertor mock-ups made of ferritic steel with tungsten armorContents

ITER TBM Test Program ITER TBM Program is to test the necessary functions of DEMO Blanket in the real fusion environment with test module scalable to DEMO blanket. ITER TBM Program is to test the necessary functions of DEMO Blanket in the real fusion environment with test module scalable to DEMO blanket. Demonstration of production of fusion fuel tritium Demonstration of production of fusion fuel tritium Demonstration of extraction of energy Demonstration of extraction of energy Demonstration of shielding performance Demonstration of shielding performance ITER TBM Test Program is one of the most important development step. ITER TBM Test Program is one of the most important development step. Based on the results from the basic R&Ds on material testing and fabrication trial, near-full-scale mock- up has successfully been developed. Based on the results from the basic R&Ds on material testing and fabrication trial, near-full-scale mock- up has successfully been developed. Cross sectional view of ITER

Full poloidal length TBM first wall (FW) mock-up Fabricated FW mockup Cross Section ~18cm 8mm 10 microns front plate rectangular tube 1500mm L x 176mm W 250mm 1500mm WCSB TBM (a sub-module) FW ( F82H) Overall view of the TBM-FW mockup with coolant manifolds front plate - HIP condition : 1100ºC, 150MPa, 2h - 15 rectangular coolant channels

High heat flux test In ~0.5MW/m 2, 30sec, 80 cycles of heat load, hot spot due to bond defect was not observed. Expected heat removal performance was demonstrated. HHF Test Condition Heat Flux: 0.5 MW/m 2 Beam Pulse: 30 s Coolant Inlet P. : 15 MPa Coolant Inlet T.: 280 o C Flow velocity: 2 m/s H + Ion Beam TBM FW Mockup Infrared camera Image Preliminary high heat flux test of the TBM-FW mockup has been carried out under high temperature pressurized coolant condition. Further thermal cycling test of this mockup is planned in this year.

Development / provisional procurement activity of the ITER divertor outer vertical target Development / provisional procurement activity of the ITER divertor outer vertical target Small divertor mock-ups Small divertor mock-ups Non-destructive examination by using infrared thermography Non-destructive examination by using infrared thermography Development of the first wall of the ITER test blanket module (TBM) Development of the first wall of the ITER test blanket module (TBM) Provisional high heat flux test of the full-poloidal length TBM first wall mock-up Provisional high heat flux test of the full-poloidal length TBM first wall mock-up Development of the DEMO divertor Development of the DEMO divertor Small divertor mock-ups made of ferritic steel with monoblock tungsten armor Small divertor mock-ups made of ferritic steel with monoblock tungsten armorContents

Small divertor mock-up for DEMO application As a basic R&D to achieve DEMO divertor, a small mock-up made of F82H with monoblock tungsten armor has been fabricated by using HIP bonding technique. As a basic R&D to achieve DEMO divertor, a small mock-up made of F82H with monoblock tungsten armor has been fabricated by using HIP bonding technique. at 5 MW/m 2 (EB heating) The central two tungsten lamellae were overheated due to the delamination of the HIP bonded interface. Further improvements of the HIP bonding condition for the F82H and tungsten joint are essential. High heat flux test o C x 150MPa x 2h 750 o C x 1.5h

Summary R&D activities on the PFCs for ITER and DEMO reactor have extensively been performed in JAEA. R&D activities on the PFCs for ITER and DEMO reactor have extensively been performed in JAEA. For the ITER divertor components, the braze bonding technique has been optimized. The ITER divertor qualification prototype has successfully been fabricated and soon be high heat flux tested in Efremov institute. For the ITER divertor components, the braze bonding technique has been optimized. The ITER divertor qualification prototype has successfully been fabricated and soon be high heat flux tested in Efremov institute. In addition, the thermal performance of the TBM first wall with full poloidal length have successfully been demonstrated, and also the soundness of the HIP joint of F82H was demonstrated. In addition, the thermal performance of the TBM first wall with full poloidal length have successfully been demonstrated, and also the soundness of the HIP joint of F82H was demonstrated. On the other hand, the HIP bonding condition for the tungsten and F82H joint should be investigated and improved as a bonding method for the DEMO divertor. On the other hand, the HIP bonding condition for the tungsten and F82H joint should be investigated and improved as a bonding method for the DEMO divertor. Further development of the bonding technique should be necessary to realize the DEMO divertor. The development of the structural material (F82H) will be continued, in parallel to the development of the TBM components. Further development of the bonding technique should be necessary to realize the DEMO divertor. The development of the structural material (F82H) will be continued, in parallel to the development of the TBM components.