Yale School of Management 1 Emerging Market Finance: Lecture 10: The Real-Option Approach to Valuation in Emerging Markets.

Slides:



Advertisements
Similar presentations
Real Options Traditional capital budgeting analysis:
Advertisements

Real Options & Business Decision Making John Curtis.
Chap 3 Net Present Value.  Net present value is the single most widely used tool for large investments made by corporations.  Klammer reported a survey.
1 FINANCE 7311 CAPITAL BUDETING. 2 Outline 4 Projects 4 Investment Criteria 4 NPV v. IRR 4 Sources of NPV 4 Project Cash Flow Checklist.
P.V. VISWANATH FOR A FIRST COURSE IN FINANCE 1. 2 Decision Criteria NPV The Payback Rule Accounting Rate of Return IRR Mutually Exclusive Projects The.
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
Investment Analysis Lecture: 8 Course Code: MBF702.
CHAPTER 14 Real Options.
Chapter 9 Project Analysis Chapter Outline
Lecture 8 - Capital Budgeting: Estimating Cash Flows and Analyzing Risk.
CORPORATE FINANCIAL THEORY Lecture 3. Interest Rate Cash Flow Interest Rate and Cash Flow - REALITY Is not guaranteed Has many different sources.
Investment Analysis Lecture: 9 Course Code: MBF702.
Chapter 8: Strategy and Analysis Using NPV
Real Options The Right to do Something Real. Introduction The classical DCF valuation method involves a comparison between the cost of an investment project.
Project Interactions, Side Costs, and Side Benefits 05/05/08 Ch. 6.
Chapter 4 Real Options and Project Analysis
CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Identifying embedded options Valuing real options in projects.
Chap 5 Numerical Methods for Simple Options.  NPV is forced to treat future courses of action as mutually exclusive, ROA can combine them into a single.
FIN 453: Cases In Strategic Corporate Finance 1 REAL OPTIONS OLD FASHION IDEAS FOR NEW METHODOLIGIES IN CAPITAL BUDGETING.
Capital Budgeting Risk Analysis 1Finance - Pedro Barroso.
FINA 522: Project Finance and Risk Analysis Lecture 12 Updated: 19 May 2007.
1 International Project Evaluation and Real Options Global Financial Management Campbell R. Harvey Fuqua School of Business Duke University
Copyright © 2001 by Harcourt, Inc.All rights reserved. CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating.
Copyright © 2003 Pearson Education, Inc.Slide 17-1 Chapter 17 Real Options.
Real Options and Other Topics in Capital Budgeting
4. Project Investment Decision-Making
Corporate Valuation, , p. 1 Institut for Regnskab, Tom Hansen Last session: The 5 steps Workshop Dialogue and coaching Exercise 12.4 This lecture:
Three-way choice Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous.
Advanced Corporate Finance Lecture 08.1 and 09 Capital Structure and Bond Valuation (Continued) Fall, 2010.
Luiz Eduardo Teixeira Brandão PUC-Rio Davis Machado da Silva Teixeira Embratel S.A. B ID P RICE D ETERMINATION IN A T ELECOM A UCTION.
Capital Budgeting Investment Rules
Option Theory and Housing Jeff Kelsh. Housing  Owning a house is a right and not an obligation, therefore it is an option.  Option to buy or rent 
Risk Management & Real Options VIII. The Value of Flexibility Stefan Scholtes Judge Institute of Management University of Cambridge MPhil Course
Valuing real options1 From financial options to real options 3. Real option valuations Prof. André Farber Solvay Business School ESCP March 10,2000.
McGraw-Hill/Irwin Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. 8-0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition.
Concession Length and Investment Timing Flexibility Chiara D’Alpaos, Cesare Dosi and Michele Moretto.
Copyright © 2003 McGraw Hill Ryerson Limited 8-1 prepared by: Carol Edwards BA, MBA, CFA Instructor, Finance British Columbia Institute of Technology Fundamentals.
Steve Paulone Facilitator Sources of capital  Two basic sources – stocks (equity – both common and preferred) and debt (loans or bonds)  Capital buys.
FIN 614: Financial Management Larry Schrenk, Instructor.
1 Practical Problems in Capital Budgeting Lecture 3 Fall 2010 Advanced Corporate Finance FINA 7330 Ronald F. Singer.
CHAPTER 13 Option Pricing with Applications to Real Options
MINICASE.
Chapter 6 Investment Decision Rules
CORPORATE FINANCE III ESCP-EAP - European Executive MBA 24 Nov a.m. London Project Appraisal-Dealing with uncertainty I. Ertürk Senior Fellow in.
12-1 Capital Budgeting and Financial Planning LECTURE 22 Course Instructor: M. Jibran Sheikh.
Lecture 7 and 8 Rules of Capital Budgeting Corporate Finance FINA 4332 Ronald F. Singer Fall, 2010.
Real Options Chapter 8 A 4-Step Process for Valuing Real Options.
FIN 614: Financial Management Larry Schrenk, Instructor.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
© Copyright 2004, Alan Marshall1 Real Options in Capital Budgeting.
13-1 CHAPTER 13 Real Options and Other Topics in Capital Budgeting Identifying embedded options Valuing real options in projects Evaluating projects with.
Real Options Thinking IOM580 Hiroshi Ochiumi 1. Traditional NPV Analysis Discounts future cash flows to their present value. In 1970, 57% of large corporations.
Dr. M. Fouzul Kabir Khan Professor of Economics and Finance North South University Lecture 5: Project Appraisal Under Uncertainty.
Capital Budgeting and Financial Planning Course Instructor: M.Jibran Sheikh.
CAPITAL BUDGETING &FINANCIAL PLANNING. d. Now suppose this project has an investment timing option, since it can be delayed for a year. The cost will.
Lecture 03.0 Project analysis Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin.
Contemporary Engineering Economics
1 Real Options Ch 13 Fin The traditional NPV rule is a passive approach because … The traditional NPV approach assumes  mangers do not have influence.
Young Li, Barclay James, Ravi Madhavan, & Joseph Mahoney 2007 Advances in Strategic Management REAL OPTIONS: TAKING STOCK AND LOOKING AHEAD.
1 CHAPTER 12 Real Options Real options Decision trees Application of financial options to real options.
U8-1 UNIT 8 Project Valuation Should we build this plant?
Copyright © 2002 South-Western Financial options Black-Scholes Option Pricing Model Real options Decision trees Application of financial options.
1 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating projects with embedded options Valuing real options in projects.
Real Options in Project Evaluation: Project Timing Stephen Gray Campbell R. Harvey.
and Cross-Border Investment Strategy
Copyright © 2014 by Nelson Education Ltd.
CHAPTER 14 Real Options.
Chapter 32 Valuing Flexibility Instructors:
CHAPTER 12 Other Topics in Capital Budgeting
CHAPTER 13 Other Topics in Capital Budgeting
Presentation transcript:

Yale School of Management 1 Emerging Market Finance: Lecture 10: The Real-Option Approach to Valuation in Emerging Markets

Yale School of Management 2 The Limitations of Simple NPV Simple NPV-Analysis: Treat investment as one-off decision:  Project stays constant; cannot be adapted. Treat uncertainty as an exogenous factor Decision Trees and real options Managers respond to risk-factors: Integrate strategy and capital budgeting: What is the value of flexibility and responsiveness?

Yale School of Management 3 Investment under Uncertainty: The Simple NPV Rule T Period Initial Investment I Revenue if Demand is high Revenue if Demand is low 50% Cost of Capital = 10% NPV = - I + 100/0.1 = I Invest if I < 1000

Yale School of Management 4 Investment under Uncertainty: Delay T Period - I Revenue if Demand is high Revenue if Demand is low 50% Strategy: Wait one Period Case 1: I > 800, do not invest if demand is low NPV = (- I ) = I Demand

Yale School of Management 5 Investment under Uncertainty: Delay (2) T Period - I Revenue if Demand is high Revenue if Demand is low 50% Strategy: Wait one Period Case 2: I < 800, always invest NPV = (- I )= I 1.1 Demand 0 0

Yale School of Management 6 Summary of Strategies Decision ruleNPV (1)Simple NPV I (2)Delay if I > 800 (3)Delay if I < 800 Delay is never optimal if I < 800 Delay is better than investing now if I > 833 Investment is never optimal if I > 1200

Yale School of Management 7 Comparison of both Strategies I NPV I I > 1200: 833 < I < 1200: I < 833: Never invest Wait; invest if demand is high Invest now ( I)/ (1200-I)/2.2 Vertical distance =value of flexibility

Yale School of Management 8 1If 833 < I < 1000 Investment now has positive NPV = I However:Waiting is optimal in order to see how uncertainty over demand resolves. Benefits from waiting: receive information to avoid loss. Costs of waiting: delay of receiving cash flows. Investment in positive NPV projects is not always optimal: the flexibility gained from waiting has a positive value. Note:Critical point is 833, not 800, why? Results of Comparison (1)

Yale School of Management 9 2.If 1000 < I < 1200 Investment now has negative NPV. However:The project should not be abandoned: if demand turns out high later, it has a positive NPV. Negative NPV-projects should be delayed, but not always be dismissed. Results of Comparison (2)

Yale School of Management 10 The project can be broken down into two components:  The investment possibility itself Has a Simple NPV of 1000-I  The flexibility of the project from the option to delay investment Value of Flexibility is: =Max (Value of investment later - Value of investing now, 0) Total NPV is the value of the whole project: Total NPV = Simple NPV + Value of Flexibility  Investing immediately ignores that option of delay is valuable  Decisions must be based on total NPV The value of flexibility is never negative Total NPV leads always to the correct decision Total NPV and Simple NPV Incorporating the Value of Flexibility

Yale School of Management 11 If I<833, invest now, hence option to delay has no value. If 1000>I>833, then:  Value of investing now = I  Expected value of investing later is (1200-I)/2.2  Value of flexibility is then: So, with I=833, the value of flexibility is zero, with I=1000 it increases to 91. If 1200> I>1000, the value of flexibility is simply (1200-I)/2.2.  How does this change if the investment becomes more risky? Compute the Value of Flexibility

Yale School of Management 12 How to Use Total NPV Assume I=900>833, hence value of flexibility positive.  Value of following optimal strategy = Total NPV  Value of investing now = Simple NPV  Value of flexibility = 80/2.2=36.4  Should you invest now? Investing now gives =100,  Simple NPV =100>0 Investing later gives:  Total NPV= Simple NPV+ Value of Flexibility = = Total NPV > Simple NPV, therefore delay!  Deciding on the basis of Simple NPV ignores that investing now “kills the option”;

Yale School of Management 13 The Impact of Volatility How does the value of flexibility depend on uncertainty? Compare previous case with situation of more volatile prices: Revenue (High Demand) = 150 Revenue (Low Demand) = 50 Expected revenue is unchanged ( = 100). Volatility is higher.

Yale School of Management 14 Flexibility in a Volatile Environment Value of Flexibility I Prices 150/50 Prices 120/ Flexibility has a higher value in a more volatile environment

Yale School of Management 15 The Option to Abandon Assume same scenario as before, but no option to delay Revenue (High Demand)= 120 Revenue (Low Demand)= 80 Investment outlay I=1010 If there is no option to delay, NPV=1000-I = -10  Do not invest! Assume assets have a scrap value:  At the end of the period:scrap value = 910  After the first period:scrap value = 0

Yale School of Management 16 High revenue state (120):  PV (Cash Flow) = 1200 > 910  Continue after period 1!  Receive: in period 1 Low revenue state (80):  PV (Cash Flows) = 800 < 910  Divest and abandon project in period 1!  Receive: in period 1 With option to abandon, NPV=40 Invest: Option to abandon makes the project viable. The Option to Abandon

Yale School of Management 17 Flexibility and Project Design Many projects have built-in flexibility:  Options to contract or expand.  Possibility to abandon if the assets have values outside the project (secondary market).  Development opportunities: Sequence of models of the same product. Oil fields. In many cases the project can be designed to be more flexible:  Leasing contracts.  Make or buy decisions.  Scale versus adaptability.