Issues of stability and ground motion in ILC Andrei Seryi SLAC October 17, 2005.

Slides:



Advertisements
Similar presentations
BDS Change Request: Support of Single L* Optics Configuration Shared by both Detectors Glen White, Nick Walker Sept MDI/CFS Ichinoseki.
Advertisements

Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Issues of stability and ground motion in ILC Andrei Seryi SLAC October 17, 2005 Selected pages from: Full talk at
NLC - The Next Linear Collider Project “Slow” Feedback Requirements: Deflections and Luminosity Linda Hendrickson IPBI Meeting, SLAC June 26, 2002.
Luminosity Stability and Stabilisation Hardware D. Schulte for the CLIC team Special thanks to J. Pfingstner and J. Snuverink 1CLIC-ACE, February 2nd,
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Ramila Amirikas, Alessandro Bertolini, Jürgen Eschke,
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Alignment and Beam Stability
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
CERN, BE-ABP (Accelerators and Beam Physics group) Jürgen Pfingstner Orbit feedback design for the CLIC ML and BDS Orbit feedback design for the CLIC ML.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
ILC Feedback System Studies Nikolay Solyak Fermilab 1IWLC2010, Geneva, Oct.18-22, 2010 N.Solyak.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Active Vibration Stabilization for the NLC Final Focus Quads Josef Frisch, Linda Hendrickson, Thomas Himel, Andrei Seryi,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
Andrei Seryi, 10/10/03, PEP-II MAC mtg. 1 PEP-II IR2 alignment S.Ecklund, C.LeCocq, R.Pushor, R.Ruland, A.Seryi, Z.Wolf With big help from A.Acosta, F.Brown,
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
SLAC SD0/QD0 Cryomodule Jitter Tolerance Glen White SLAC March 27 th 2007.
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
FP7: EuCARD after a year of preparation… A.Jeremie.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
From Beam Dynamics K. Kubo
Near IR FF design including FD and longer L* issues
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
EuroTeV WP7 activities in DESY
CLIC-ILC BDS & MDI work.
SD0/QD0 Cryomodule Jitter Tolerance
Updates on IR and FF for super-B factory
Extract from today’s talk given to DCB
BDS civil construction Single IR upgrade scenarios discussion
Presentation transcript:

Issues of stability and ground motion in ILC Andrei Seryi SLAC October 17, 2005

2 17 Oct 05 A.Seryi, SLAC Introduction Goals of this talk –Discuss ILC stability goals, in particular for the beam jitter jitter at the end of the linac, along the BDS and IP –Suggest for discussion the criteria for site stability and for additional jitter of beamline hardware components –Review present status of stability studies and discuss feasibility of achieving the stability goal Will need to refer to the latest studies for ILC, as well as relevant earlier developments for NLC/GLC, CLIC and TESLA, as well as for XFEL

3 17 Oct 05 A.Seryi, SLAC Technical Review Committee 2002 studies Intratrain feedback is a must in TESLA Even with intratrain, noisy site cause Luminosity loss Hardware jitter was not included in simulations ! TRC says that linac quad stability need urgent study Integrated spectra of absolute (solid lines) and relative motion for 50m separation obtained from the models

4 17 Oct 05 A.Seryi, SLAC Beam jitter and its control in ILC Sources of IP beam jitter –motion of beamline components (in linac, BDS, FD), energy jitter, kicker jitter… Motion of beamline components consist of –site ground motion and ILC in-tunnel and near-tunnel hardware noise –additional noise of beamline components including amplification of floor motion supports Approach to IP beam jitter control –fast intra-train feedback to recover luminosity range is finite: ~1-2  in X, ~  in Y, will be discussed below With fast feedback, the requirements to –ground motion; linac and BDS quads jitter and FD has to be determined not from IP jitter, but from diagnostic performance and emittance preservation

5 17 Oct 05 A.Seryi, SLAC ILC jitter goals discussion The large capture range (10s of  ) of fast feedback does not mean that larger jitter is allowed along the machine Many reasons why the jitter should be smaller that beam size –The need to minimize  due to collimator wake-fields, –to provide acceptable conditions for beam diagnostics, –to minimize jitter effects on dispersion free steering, etc. The edge of the comfortable range: jitter < 50%  –the 50% jitter at the end of main linac => 40nm jitter of linac quads BDS (w. nonlinear elements) is more sensitive than weak linac –criteria for BDS must be different, tighter than in linac –may allow beam jitter to grow to ~100% before FD FD contributes one to one to IP jitter, but less relevant –FD jitter of ~100nm should be OK –No active stabilization should be needed (position monitoring useful)

6 17 Oct 05 A.Seryi, SLAC Jitter affecting linac tuning, NLC example P.Tenenbaum, NLC MAC, June 2003 Procedure: –steer to min Q-BPMs –perform DF steering –apply  bumps in Y Quad vibration budget –42nm in X (rms) –11nm in Y (would cause 30% beam jitter at linac exit) Twice larger jitter deteriorates  significantly Would averaging solve this? Effect should be generic – issue for ILC as well

7 17 Oct 05 A.Seryi, SLAC ILC simulations with GM, jitter & feedback Integrated simulations performed by Linda Hendrickson Assumptions –5Hz feedbacks loops, “cascaded”, exp response of 36 5Hz pulses Linac: 5 distributed loops, each with 4 X & 4 Y dipole correctors, and 8 BPMs BDS: 1 loop, 9 BPMs and 9 dipole correctors –IP deflection (X&Y) 5Hz loop, not cascaded, exp 6 pulses Ground motion and component jitter –Ground motion models K and C (fit to KEK and DESY) and B –component jitter (25 nm in BDS including FD, 50 nm in linac) –kicker, current, energy jitter, BPM resolution : kicker jitter (0.1 sigma), current jitter (5%), energy jitter (0.5% uncorrelated amplitude on each klystron, 2 degrees uncorrelated phase on each klystron, 0.5 degrees correlated phase on all klystrons), BPM resolution 100 nm

8 17 Oct 05 A.Seryi, SLAC model K Model K Based on measurements at KEK, in a borehole near Higashi-Odori, Toshiaki Tauchi et al. Close to model C in 1-10Hz, but less noisy above 20Hz (nm) 80m

9 17 Oct 05 A.Seryi, SLAC Beam jitter / assumptions All Jitter Sources & gm K5 Hz ground K only X (  )Y (  )X (  )Y (  ) End Linac e- rms IP e- rms IP 2 beam rms difference IP maximum 2 beam diff Beam jitter / assumptions All Jitter Sources & gm B5 Hz ground B only X (  )Y (  )X (  )Y (  ) End Linac e- rms IP e- rms IP 2 beam rms difference IP maximum 2 beam diff Linda Hendrickson ILC simulations with GM, jitter & feedback Beam jitter / assumptions All Jitter sources & gm C5 Hz ground C only X (  )Y (  )X (  )Y (  ) End Linac e- rms IP e- rms Preliminary results. Statistics for gm C is smaller

10 17 Oct 05 A.Seryi, SLAC ILC simulations, continued ILC simulations are ongoing, more studies are happening as we speak here –In particular, growth of jitter along the BDS is being studied –Luminosity with 5Hz and intratrain feedback is being studied –In particular – observe noticeable luminosity reduction with gm C and K, e.g. Lumi is 37% with 5Hz feedback only ; 84% with ideal intratrain – gm K only 17% with 5Hz feedback only ; 70% with ideal intratrain – gm K and all jitters –Luminosity reduction is due to effects in BDS (not FD, not linac) –More details – see talk of Glen White These ILC simulations, as well as earlier simulations for TRC, allow to discuss stability goal for ILC systems

11 17 Oct 05 A.Seryi, SLAC Discussion of ILC simulation results Linac (driving criteria is jitter) –GM K or C is OK for linac –If GM K or C, then linac component vibration 50nm is a bit too high, wish it to be no more than 30nm BDS (driving criteria is luminosity) –GM K or C is too noisy for BDS, wish to be ~3 quieter –GM B is just fine for BDS, can allow ~3 worse –Component jitter 25nm too high for BDS, wish it would be < 10nm –For FD may allow several times larger, 100nm? Linac and BDS may have different specs for on-the-floor noise –the noise consist of ground noise + noise from nearby utilities, which are different in linac and BDS areas –BDS area may be located in a quieter place than linac average Goals for tunnel floor stability & add. component jitter: –Linac: up to gm K or C & up to 30nm –BDS: up to gm B*3 or gm C/3 & up to 10nm

12 17 Oct 05 A.Seryi, SLAC How to divide vibration budget? Let say the requirement for on the tunnel floor stability in linac area is ground motion C (and gm C /3 in BDS) This motion includes –natural ground motion of the site –added noise by ILC conventional facility and other nearby equipment One can set the budget for added noise to be 1/2 0.5 of gm C and require initial site to be also 1/2 0.5 of gm C, but this way may show limitations in the future We may discuss another approach, when initial site motion is significantly more quiet than gm C, and all vibration budget is given to CF and other added noise

13 17 Oct 05 A.Seryi, SLAC FFTB quad –Small (~2nm at 5Hz) difference to ground (on movers, with water flow, etc.) –Lower frequency is relevant for 5Hz machine ( Hz) but was not studied accurately –The 10nm goal may be achievable (for BDS area in gm B to B*3) 10 nm goal for BDS component jitter

14 17 Oct 05 A.Seryi, SLAC 30 nm goal for linac components jitter Presently, there are insufficient data to find how challenging is this goal It appears to be 5-10 times below what was observed for vibration of quads in cryostats However, present observations were performed in very noisy environment of on-surface labs The measurement methods in-cold are difficult and just being developed Focused engineering can improve stability significantly Need to be optimistic and concentrate our efforts

15 17 Oct 05 A.Seryi, SLAC ILC linac quad stability Recent progress in studies of quad stability in cryomodules –use of piezo sensors –use of wire position system quad cavity TTF cryomodules, since ~1995, were equipped with vibration sensors. Studies at TTF were ongoing in September 2002 [1]. At that time there was still big uncertainty in the measured data, due to not well determined calibration at cold temperature, issues with sensor grounding, measured spectrum being limited to <100Hz, etc. [1] Private communication with DESY engineers Heiner Brueck and Erwin Gadwinkel. HeGRP TRC R2 : “A sufficiently detailed prototype of the main linac module (girder or cryomodule with quadrupole) must be developed to provide information about on-girder sources of vibration.”

16 17 Oct 05 A.Seryi, SLAC XFEL stability goals and ILC XFEL plan to achieve beam jitter goals by both using fast feedback and improving the cryomodule stability: –“Beam jitter stability requirements: 0.1  (or somewhat better) –With 70 nm (rms) quad movement about 0.05  at linac end –1:1 transfer ground to quad assumed, may need redesign of present quad mounting in cryostat –Measurements of quad vibration in cryostat not yet conclusive” –[XFEL WG-Minutes, Oct.2003,

17 17 Oct 05 A.Seryi, SLAC XFEL beam optics to end of linac XFEL XFEL is shorter and has less quads than ILC linac, but focusing is stronger, more quads per km => jitter effects are comparable: R.Brinkmann, ESFRI XFEL Workshop 30/10/2003 Ground motion along XFEL site => 0.1  goal 70nm ground motion jitter =>  120nm quad jitter =>  ground motion K => 0.33  30nm quad jitter => 0.37  => 0.5  goal XFEL ILC Factor of 4

18 17 Oct 05 A.Seryi, SLAC WPM to measure cryomodule vibration A. Bosotti et al. [PAC2005]: use of WPM (wire position monitors) –difficult task, complicated by vibration of wire –Qualitatively, observed less motion near the support post –Data are preliminary –Normalization? e.g. blue at 10Hz: 0.9  m left plot ~14nm right plot A.Bosotti et al., PAC2005

19 17 Oct 05 A.Seryi, SLAC Vibration study at TTF in cold Heiner Brueck et al., TESLA Meeting, Hamburg 03/31/2005 –Piezo sensors (cold) at the quad, in X and Y directions –Sensors on top of the module, on ground, support, +geophone Heiner Brueck, et al.

20 17 Oct 05 A.Seryi, SLAC TTF vibration study – pump modification Decouple pump from cryomodule, use flexible pipe and foam under the pump Heiner Brueck, et al.

21 17 Oct 05 A.Seryi, SLAC TTF vibration study – vertical Heiner Brueck, et al. With or without pump modification => improvement Quad vibration about 3 * tunnel Low f – noise of electronics Horizontal motion about twice larger Also studies forced vibration of HERA dipole cryostat – observed strong (*10) resonance at 14.5 Hz Midnight data may be close to XFEL goal, overall may need up to a factor of 2 improvement to reach 0.1  stability goal at XFEL (not relying on feedback) For ILC would need factor of several improvement

22 17 Oct 05 A.Seryi, SLAC Next slides… Briefly review –site studies –FD stabilization –sensors for IR –noise propagation –equipment noise –etc. Also discuss issues of IR and common collider hall stability

23 17 Oct 05 A.Seryi, SLAC Ellerhoop LHC P4 Near KEK, Kita-Ibaraki Near SLAC Mine near FNAL Site stability studies Many places around the world KEK Ellerhoop

24 17 Oct 05 A.Seryi, SLAC Energen INC. Reaction mass stabilization tests at BNL Stabilization studies Experience invaluable Components of developed hardware may be applicable Extended object SLAC SLAC 1996 CERN, now Annecy UBC SLAC DESY 1995

25 17 Oct 05 A.Seryi, SLAC Development of sensors for IR Nonmagnetic inertial seismometers –SLAC home built – low noise, as good as Mark4 geophone or better –Molecular Electronic Transfer sensor – low noise, tested in 1.2T field, but cannot be cooled Interferometer methods Will need to use these or more advanced sensors to monitor FD motion PMD/eentec SLAC SLAC, UBC, etc

26 17 Oct 05 A.Seryi, SLAC Vibration transmission LA twin tunnel: between tunnels and from surface (figs shown) Results are valuable for ILC Mobility (response / driving force) measured in LA metro twin tunnel test and modeled with 3D code SASSI.

27 17 Oct 05 A.Seryi, SLAC Vibration isolation of vibration sources Should be a standard practice for ILC Vibration on the floor vs distance. For chiller on springs, its vibration effects are indistinguishable on the floor.

28 17 Oct 05 A.Seryi, SLAC Stability of the common collider hall Baseline has two Beam Delivery Systems, two collider halls separated in z by ~130m, for two independent experiments The paradigm of two BDS, two IRs, two collider halls and detector is challenged and likely will be changed The considered alternative is single IR, single or two push-pull detectors, at least at the start of ILC –plan of upgrade to two IRs need to be worked out –Next slide will show an example with single 14mrad IR at start Single collider hall is more challenging for IR stability –With fast feedback, the FD stability goal is ~100nm –It should be achievable for single collider hall –Lower frequency ~0.5Hz? Temperature stability? –Monitoring of FD motion is needed

29 17 Oct 05 A.Seryi, SLAC Tunnel stubs for beam dump Tunnel stubs for future upgrades. At first stage can be used as alcoves for diagnostics electronics, lasers for laser wires, etc. Upgrades & IR stability Example of 14mr single IR and some of possible upgrades The cases B& C may be more challenging for stability, as they may allow construction or assembly activity for second detector A B C

30 17 Oct 05 A.Seryi, SLAC FD magnet stability Stability of FD magnets need to be studied BNL preparing to measure stability of compact SC quads First results with CQS quad will be presented – encouraging results Annecy group is aimed to study FD stability (simulation & experiments) with BNL FD design Studies at ATF2 ? RHIC CQS Evolution of FD design with compact quads, B.Parker et al

31 17 Oct 05 A.Seryi, SLAC IR stability Vibration is not the only concern –Temperature stability? –Wakes heating the IR chamber and deforming it? During 1ms? –SR should be well masked in IR, but may it cause deformations in other parts of BDS? –Example of PEP-II: IR heated by SR from LER and is moving by 0.1 mm as e+ current vary min LER current max LER current Current of Low Energy Ring, slope of the girder measured by HLS and wire, and reconstructed position of FD magnets for min and max LER current

32 17 Oct 05 A.Seryi, SLAC Intratrain feedback Low latency FONT invaluable for ATF2 facility ILC intratrain hardware optimization –BPM location (background) –kicker location (range) Number of intratrain feedbacks –baseline is one at IP –if linac stability is not achieved, may need multiple feedbacks along the ILC? –How more difficult this will be? Was never studied in details. Position scan Angle scan P.Burrows, S.Smith, G.White at al

33 17 Oct 05 A.Seryi, SLAC Fast feedback range If kicker of fast feedback upstream of SD0, for aperture reasons, nonlinear effects limit the safe range of fast feedback Kicker near SD0 –safe range of feedback ~20  X and ~70  Y Kicker near QF1 –safe range of feedback ~5  X and ~10  Y May be possible to place kicker in- bore of SD0? Near SD0 Near QF1

34 17 Oct 05 A.Seryi, SLAC Summary ILC stability goals for the beam, site and hardware suggested beam jitter: –50%  at the end of linac (or in BDS diagnostics) –100%  at the end of BDS, before FD –several  at IP Tunnel floor stability (site + noise of nearby ILC equipment): –Linac area: up to gm K or C –BDS area: up to gm B*3 or gm C/3 Additional noise due to beamline components: –Linac area: up to 30 nm –BDS area : up to 10 nm –FD : up to ~100nm Need to discuss these goals, their feasibility and consequences Many other issues not discussed, e.g. long term stability…