GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR-01967-01Section 03 Science Requirements and Instrument Design.

Slides:



Advertisements
Similar presentations
0 LAT Coordinate System LAT-TD (it’s in CyberDocs) Purpose: The hardware and software designs need a clear, consistent and universally accepted.
Advertisements

GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
S. Ritz 1 Hardware Trigger Throttle Issues Context: the triggers Purpose of throttle on TKR trigger Earlier design using TKR geographic information The.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 S. Ritz 1 GLAST Large Area Telescope: Instrument Design Steven M. Ritz Goddard.
S. Ritz1 Checking Out What is Checked In  Need to optimize balance of checking between users and developers. –infuse more of a culture of detailed checking.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT ProjectTrigger Scheduler, Engines, and Rates 6 Feb 2006 J. Eric Grove Naval Research Lab Washington DC Trigger Scheduler, Engines, and Rates.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
Hardware Failure Impacts Exercises S. Ritz. Issues Recent results from design reliability analysis (system engineering, Thurston et al.) Probabilities.
GLAST LAT Project S. Ritz 1 GLAST Large Area Telescope: Adding Converter to the Blank TKR Planes? Bill Atwood, Tune Kamae, Steve Ritz 4 September 2002.
GLAST LAT Project 1S. Ritz Discussion: To Where From Here? DC1 Closeout Meeting February 13, 2004 S. Ritz Gamma-ray Large Area Space Telescope.
GLAST Science Support Center February 12, 2004 DC1 Closeout Detecting Gamma-Ray Bursts in the DC1 Data David Band (GSSC)
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
HAWC Gus Sinnis VHE Workshop UCLA October, 2005 HAWC: A Next Generation Wide-Field VHE Gamma-Ray Telescope.
Status of Trigger Rate Studies Analysis Group meeting 9 December 2002 D. Wren S. Ritz.
Residual Background events after Rejection Cuts M total background events (GlastReleasev3r3p7) 344 residual events after Bill's rejection cuts. 342.
SVACInstrument Analysis Meeting, September 23, 2005 Anders W. Borgland 1 GEM Discarded Events Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project17 August, 2001 S. Ritz 0 GLAST Large Area Telescope: Status of System-level Performance Simulations UPDATE (to 26 July presentation)
GLAST background review dec Simulating rates: the big picture Incoming rate into the 6 m 2 sphere: is it right? Corresponding trigger rate: implies.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 S. Ritz Backgrounds and Trigger Rates 1 Backgrounds and Trigger Rates on Orbit S. Ritz with many contributions.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
Background runs at the UW “farm” A little background: we have installed the GRID-standard condor from the other UW in Madison. –Currently 6 CPUs available,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST Simulations Theodore E. Hierath Louisiana State University August 20, 2001.
Analysis meeting 11July05 - T. Burnett 1 Status of the Background Review DC2 prep meeting: Switch to CRflux package by Mizuno for charged particles, Earth.
GLAST LAT ProjectBeam Test Meeting 1/21/2006 L. Latronico1 Beam test activity in Italy Integration & test activities –1x1 tower completed and under test.
Introduction to gamma-ray astronomy GLAST-Large Area Telescope Introduction to GLAST Science New way of studying astrophysics Schedule of GLAST project.
Gamma-Ray Telescopes. Brief History of Gamma Ray Astronomy 1961 EXPLORER-II: First detection of high-energy  -rays from space 1967 VELA satelllites:
GLAST Geant4 Simulation Francesco Longo University of Trieste and INFN-Trieste On the behalf of the GLAST Software Group Udine 30/01/03.
Gamma-ray Large Area Space Telescope IEEE Nuclear Science Symposium Wyndham El Conquistador Resort, Puerto Rico October , 2005 The Gamma Ray Large.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
S.Klimenko, December 2003, GWDAW Performance of the WaveBurst algorithm on LIGO S2 playground data S.Klimenko (UF), I.Yakushin (LLO), G.Mitselmakher (UF),
T. Burnett1 GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 9, 2002 SAS Software: Sources Detector geometry model Simulation Event.
GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design.
GLAST's GBM Burst Trigger D. Band (GSFC), M. Briggs (NSSTC), V. Connaughton (NSSTC), M. Kippen (LANL), R. Preece (NSSTC) The Mission The Gamma-ray Large.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Aa GLAST Particle Astrophysics Collaboration Instrument Managed and Integrated at SLAC/Stanford University The Gamma-ray Large Area Space Telescope (GLAST)
1 BFEM Trigger Diagnostics Mar 12, 2002 Tsunefumi Mizuno Note: For reference, this document includes some works already reported (pages 2-5 and 7). The.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Science Overview 1 GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 2 of 12 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
ESAC_3_24_05.ppt 1 GLAST Large Area Telescope Overview and Science Update Peter F. Michelson Stanford University GLAST User’s Committee.
Using Adaptive Tracking To Classify And Monitor Activities In A Site W.E.L. Grimson, C. Stauffer, R. Romano, L. Lee.
1 GLAST Italian meeting Francesco Longo & Carlotta Pittori Udine 11 marzo 2004 V. Cocco, A.Giuliani, P.Lipari, A. Pellizzoni, M.Prest, M.Tavani. E.Vallazza.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST_BGmodel_ ppt Tsunefumi Mizuno 1 Status of the GLAST BG model February 6, 2008 CA-SO Workshop Tsunefumi Mizuno (Hiroshima Univ.)
In high energy astrophysics observations, it is crucial to reduce the background effectively to achieve a high sensitivity, for the source intensity is.
The High Energy Gamma-Ray Sky after GLAST Julie McEnery NASA/GSFC Gamma-ray Large Area Space Telescope.
Throttle Studies David Wren Analysis Group Meeting 22 March 2004.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
Fermi Gamma-ray Space Telescope Searches for Dark Matter Signals Workshop for Science Writers Introduction S. Ritz UCSC Physics Dept. and SCIPP On behalf.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Gamma-ray Large Area Space Telescope -France -Germany -Italy -Japan -Sweden -USA Energy Range 10 keV-300 GeV. GLAST : - An imaging gamma-ray telescope.
After integration and test at SLAC and GSFC, BFEM was shipped to the National Scientific Balloon Facility (NSBF) at Palestine, Texas. The experiment was.
Fermi Gamma-ray Burst Monitor
S. Ritz 1 Onboard Science Processing S. Ritz F-FIDT March 2002.
Report of GLAST Balloon Flight October Annual meeting of Astronomical Society of Japan T. Mizuno and other GLAST Balloon Team
ICARUS T600: low energy electrons
Background Rejection Prep Work
Proposal for LAT Year 1 Data Release Plan
Downlink rates The next slide was presented to Jonathans’ flux review
Performance of the WaveBurst algorithm on LIGO S2 playground data
CR Photon Working Group
Integration and Test Organization Chart
Eduardo do Couto e Silva Feb 28, 2006
Studies of the Time over Threshold
Analysis of GLAST Balloon Experiment Data
Presentation transcript:

GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design Concepts 1 Implemented Maximum Background Fluxes total Integrates to ~10 kHz/m 2 LAT-TD Mizuno et al Note by Allan Tylka 12 May 2000, and presentations by Eric Grove AMS Alcaraz et al, Phys Lett B484(2000)p10 and Phys Lett B472(2000)p215 Comparison with EGRET A-Dome rates provides a conservative ceiling on the total rate. orbit-max fluxes used for trigger rate calculations

GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design Concepts 2 Implemented Average Background Fluxes Integrates to ~4.2 kHz/m 2 orbit-avg fluxes used for downlink and final background rejection calculations

GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design Concepts 3 EGRET A-dome Rates (from D. Bertsch, EGRET team) A-dome has an area of ~6 m 2, so orbit max rate (outside SAA and no solar flares) corresponds to ~16 kHz/m 2 This represents a conservative upper-limit for us, since the A-dome was sensitive down to 10’s of keV. Note peak rate is at (24.7,260) SAA

GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design Concepts 4 Instrument Triggering and Onboard Data Flow Hardware trigger based on special signals from each tower; initiates readout Function: “did anything happen?” keep as simple as possible TKR 3 x y pair planes in a row workhorse  trigger x x x Instrument Total L1T Rate: ** subset of full background rejection analysis, with loose cuts only use quantities that  are simple and robust  do not require application of sensor calibration constants full instrument information available to processors. Function: reduce data to fit within downlink Hierarchical filter process: first make the simple selections that require little CPU and data unpacking. Total L3T Rate: complete event information signal/bkgd tunable, depending on analysis cuts:  cosmic-rays  ~ 1:~few Spacecraft OR (average event size: ~8-10* kbits) **4 kHz average without throttle (1.3 kHz with throttle); peak L1T rate is approximately 12 kHz without throttle and 3.8 kHz with throttle). Upon a L1T, all towers are read out within 20  s Level 1 Trigger CAL: LO – independent check on TKR trigger. HI – indicates high energy event disengage use of ACD. On-board Processing On-board science analysis: transient detection (AGN flares, bursts) *assumes no compression

GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design Concepts 5 Testing Trigger Efficiencies On Orbit Two kinds of inefficiencies Test this on the ground in LAT using cosmic-ray induced muons LOCAL at least 2 methods to measure: spatial distributions of L1T’s compare TKR hits with TKR trigger pattern using both TKR triggers CAL-LO triggers (independent sample!) GLOBAL example: global trigger drops every 10 th trigger. How would we know? Two types of global inefficiencies: Time-dependent monitor pulsar fluxes over time Constant At least 3 methods to measure: count prescales periodic triggers (both hard and soft) use a sensor with a counter independent of trigger system (e.g., ACD tile) to generate heavily prescaled triggers.