K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
POSTER TEMPLATE BY: Presentations.com POSTER TEMPLATE BY: Presentations.com Outlet Inlet n’=375 n=150 n φ =75 (dφ=1.2 ⁰ ) Extra Terms.
K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab,
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
K. McDonald 2 nd Oxford-Princeton Targetry Workshop 6 Nov 2008 High-Power Targets for Superbeams and Neutrino Factories (and Muon Colliders) K.T. McDonald.
Harold G. Kirk Brookhaven National Laboratory High-Power Targets H.G. Kirk Applications of High-Intensity Proton Accelerators FNAL October 20, 2009.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
Additional Calculations of the MERIT Mercury Jet Using the UCLA HIMAG Code Neil Morley and Manmeet Narula Fusion Science and Technology Group, UCLA
KT McDonald 4 th High-Power Targetry Workshop May 2, The High-Power Target System for a Muon Collider or Neutrino Factory K. McDonald Princeton.
K.T. McDonald June 18, 2009 DUSEL FNAL 1 Strategies for Liquid Argon Detectors at DUSEL Kirk T. McDonald Princeton University (June 18, 2009)
1 Optical Diagnostic Results of MERIT (Mercury Intense Target) Experiment at CERN H. Park, H. Kirk, T.Tsang, K. McDonald, F. Ladeinde NFMCC Meeting Fermilab,
Managed by UT-Battelle for the Department of Energy Using Lead-Bismuth Eutectic in MERIT Syringe Pump Van Graves October, 2007.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
K. McDonald EURO Meeting 26 Mar 2009 High-PowerTargets for Neutrino Beams and Muon Colliders K.T. McDonald Princeton U. EURO Meeting CERN, March 26, 2009.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
The TT2A Experiment A Proposal to the ISOLDE and Neutron Time of Flight Experiments Committee
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Initiatives in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon. OX11 0QX, UK.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
1 Optical Diagnostic Results of MERIT Experiment and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University.
KT McDonald MAP Winter Meeting (SLAC) December 5, Solid Target Options for an Intense Muon Source K. McDonald Princeton U. (December 5, 2014) MAP.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
K. McDonald Target Studies Meeting June 29, Materials for the Target System Internal Shield K. McDonald Princeton U. (June 27, 2010) Iron Plug Proton.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
K. McDonald NFMCC Collaboration Meeting Jan 14, The Capture Solenoid as an Emittance-Reducing Element K. McDonald Princeton U. (Jan. 14, 2010)
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Gallium as a Possible Target Material for a Muon Collider or Neutrino Factory X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA J.S. Berg, H.G. Kirk,
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Report to MUTAC LBNL April 25, 2005.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Simulation of High-Power Mercury Jet Targets for Neutrino Factory and Muon Collider R. Samulyak, 1,2 H.C. Chen, 1 H.G. Kirk, 2 K.T. McDonald 3 1 Stony.
1 NFMCC Friday Meeting January 4, 2008 Optical Diagnostic Results of MERIT Experiment at CERN HeeJin Park.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Other R&D Harold G. Kirk Brookhaven National Lab.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
BNL solenoid capture workshop: magnet challenges are not trivial Summarized by Tengming Shen
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
MERIT Scientific goals and importance
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
W. T. Weng Brookhaven National Laboratory
Presentation transcript:

K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the experiment already provides proof-of-principle of a free mercury jet target for megawatt proton beams. Considerable system engineering is needed before an actual jet target station could be built: 20-T magnet, tungsten-carbide(?) shield, mercury delivery and collection system, remote handling system, radioisotope processing, …….. Desirable to improve jet quality, and to explore viability of jet axis at 100 mrad to magnetic axis, as proposed in Feasibility Study 2. Would also be good to verify feasibility of recovery of the mercury jet in an open pool. An opportunity exists to conduct non-beam studies with the MERIT equipment after it is shipped from CERN to ORNL ~ Jan 2009 (presentation by V. Graves). Such studies would begin with no magnetic field (jet quality, Hg pool), followed by studies with the MERIT magnet powered to 15 (or even 20) T at a new fusion power test facility at ORNL.

K. McDonald Muon Collaboration Meeting 19 Mar 2008 Neutrino Factory Feasibility Study 2 Infrastructure studies based on SNS mercury target experience. Should be extended during the International Design Study. Considerable engineering support needed to go beyond Study 2.

K. McDonald Muon Collaboration Meeting 19 Mar 2008 Liquid lead-bismuth target (~ 300  C) at PSI for 1MW ~DC 600 MeV. SINQ -- Another MW Target System

K. McDonald Muon Collaboration Meeting 19 Mar 2008 Issues from MERIT: Jet Quality, Vertical Height 0 T 10 T Jet quality poor in zero magnetic field, and improves (as expected) with increasing field. Jet vertical height times nozzle diameter, and little affected by magnetic field. Simulations predict that vertical expansion of jet would be small, and would vary as B 2. Suggests that 180  bend before nozzle leads to vertical expansion of jet. Interesting hydrodynamic issues, but may be best to focus of aspects relevant to Factory/Muon Collider – where no 180  bend is contemplated.

K. McDonald Muon Collaboration Meeting 19 Mar 2008

Features of the Study 2 Target Design Mercury jet with 1-cm diameter, 20 m/s velocity, at 100 mrad to magnetic axis. Proton beam at 67 mrad to magnetic axis. Iron plug at upstream end of capture solenoid to reduce fringe-field effect on shape of free jet. Mercury collected in a pool in ~ 4 T magnetic field. Issues: Jet quality after emerging from long cylindrical nozzle in iron plug. Splash in mercury pool should not extend up into nominal beam region.

K. McDonald Muon Collaboration Meeting 19 Mar 2008 CERN was Proof of Principle not Prototype CERN used a 180  bend in the mercury delivery path because CERN would not permit any mercury-wetted connections to be made at CERN Syringe Pump Secondary Containment Jet Chamber Proton Beam Solenoid

K. McDonald Muon Collaboration Meeting 19 Mar 2008 Could Reuse MERIT Equipment to Study Jet Issues without Beam At a facility suitable for more general handling of mercury, could connect the mercury test volume to the mercury pump by hoses so that mercury enters at one end of magnet and exits at the other. Could study jet quality in nozzles with no sharp bends. Could use optical diagnostics with both side and top views. Could add iron plugs to the MERIT magnet to study effect of field on a jet at 100 mrad (instead of 33 mrad as in CERN). Could also study collection of the jet in a mercury pool.

K. McDonald Muon Collaboration Meeting 19 Mar 2008

Lead-Bismuth Alloys Lead-bismuth alloys are solid are room temperature, but liquefy at  C. Easier to contain a target “spill” if material solidifies at room temperature. More radioisotope production with Pb-Bi than with Hg (but “trivial” compared to a reactor). Boiling of liquid target by proton beam (> 4 MW) less of an issue than with mercury. Design studies for MERIT-like tests mandated by the NFMCC. Some Pb-Bi alloys wet quartz, so difficult to use with optical diagnostics. Woods metal (Low 158) does not wet glass (Palmer), but contains cadmium. Pb-Bi-Sn alloys melt as low as 95  C. Lab tests will be done soon on wetting of quartz by several low melting alloys.

K. McDonald Muon Collaboration Meeting 19 Mar 2008 Summary Liquid-target MHD simulations are ongoing and should continue to be supported. Studies of radiation damage of solid-target candidates are ongoing, largely without NFMCC support. Systems engineering of a 4 MW target facility should be supported in the context of the IDS or other muon-based accelerator feasibility study. Hardware studies of jet (and splash) quality in configurations close to those of Feasibility Study 2 could be performed with MERIT equipment at ORNL. Design studies for a MERIT-like experiment with a liquid Pb-Bi alloy are underway. Next Targetry Workshop: 1-2 May, 2008, Oxford, UK