GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

1 Background: Use of TKR Trigger One-Shots individual TKR strip channels “true” when analog shaped pulse is above threshold. strips in a plane are OR’d.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Summary and Future Plans Eduardo do Couto e Silva Instrument Analysis.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Project Software vrvs meeting X. Chen 1 GLAST LAT Project Software vrvs meeting X. Chen 1 Analyses of Muon Calibration Data Xin Chen.
GLAST LAT ProjectIA Meeting – June 17,2005 E. do Couto e Silva 1 New additions to the main page.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
IA meeting, Feb. 3, 2006 Mutsumi Sugizaki TKR Noise Stdudy 1 LAT TKR Noise Study Current Status Mutusmi Sugizaki (and short comment about TOT=255 event)
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project 1S. Ritz DC1 Closeout Introduction February 2004 Steven Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Summary of Core “Performance Review” for TkrRecon How do we know the Tracking is working?
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
T. Burnett1 GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 9, 2002 SAS Software: Sources Detector geometry model Simulation Event.
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
GLAST LAT Project Instrument Analysis Workshop September 27, 2004 E. do Couto e Silva 1/11 Overview of the Instrument Analysis Workshop Series Eduardo.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope Instrument Science Operations Center
LAT Instrument Test Data Analysis in Context
GLAST LAT tracker signal simulation and trigger timing study
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Overview of Instrument Analysis Effort
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Instrument Analysis Workshop Series
Overview Goal Study GEM variables in SVAC ntuple
Commissioning of the ALICE-PHOS trigger
Imaging crystals with TKR
Mini Tower Preliminary Results
CR Photon Working Group
Integration and Test Organization Chart
Eduardo do Couto e Silva Feb 28, 2006
Status Report and highlights from workshop II
Studies of the Time over Threshold
SVAC Configuration Verification
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument Analysis Workshop 1 SLAC, June 7, 2004

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 2/19 Welcome and Thanks Some people came to this Workshop assuming that –This is an I&T meeting (FALSE) –This is an SAS/offline meeting (FALSE) –Something good may be happening, but they do not have a clear idea of what it is (TRUE) –The weather was going to be nice (TRUE) ….This is the beginning of an important effort within the LAT Collaboration –To support Flight Integration and –To develop ownership of the LAT Instrument Thanks for your support !

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 3/19 Goals for this Workshop Series Familiarizing LAT Collaborators with the –LAT instrument –Front-End Electronics –Trigger and Data Acquisition –Data Analysis Software –Data taking plans during LAT integration using –Cosmic rays –Van de Graaff photons Creating a forum to –exchange knowledge between all subsystems and “hardware and software oriented people” Using simulated and real Data to exercise –reconstruction algorithms (mostly with real data) –data analysis tools to provide feedback to software developers Developing expertise to –uncover and quantify any instrumental effects that could have an impact on the LAT science data –start the work that will evolve into the Science Operations Group of the ISOC –create a core and trained group to participate in the beam tests analysis effort (after instrument delivery) Prepare for Instrument Data Analysis by… Develop ownership of the LAT instrument

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 4/19 The Workshop Series Instrument Analysis Workshop 1 (June 7-8, 2004) –Kick off meeting –Homogenize the knowledge from people who will do the data analysis –Assign “projects” using Monte Carlo simulated data Instrument Analysis Workshop 2 (September, TBR) –Discuss results from projects assigned during Workshop 1 –Discuss results from projects derived from REAL data collected with the Engineering Model 2 (ACD, CAL and TKR) –Develop a list of instrumental effects that could have an impact on science data analysis –Pretty much “our Readiness Review” for Flight Integration Instrument Analysis Workshop 3 (November, TBR) –Analysis of real data from the first two towers Instrument Analysis Workshop 4 (Summer, TBR) –Analysis of real data from XX-towers (TBD) “Instrument Analysis Workshop 5” – Collaboration Meeting (Full LAT- TBD) –LAT Data Analysis (and to validate Monte Carlo simulation) This proposal will be reviewed and discussed Tuesday afternoon

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 5/19 Goals for This Workshop The focus is on simulated data from the first Two Towers Educate people on behavior and/or performance of –TKR Front-End Electronics –CAL Front-End Electronics –Trigger and Data Acquisition system –Reconstruction software Provide hands-on experience –With SAS/I&T analysis files and tools Use the knowledge acquired during the workshop to –Complete MC projects that will be due ~ 6 weeks later (TBR) –Provide input to data taking plans for LAT integration

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 6/19 Who are the people sitting next to you? Software Oriented –Familiar with SAS tools –C++ –ROOT –SAS infrastructure –Want to do data analysis but are not sure what to look for in the instrument Hardware Oriented –Know about –C++ –ROOT –SAS infrastructure –Terribly busy building the instrument, and are having a hard time to get started on the data analysis Data Analysis Oriented –Ready to analyze any data –But are not sure of »what tools to use »where the data are »what to expect from the instrument Information Oriented –Want to learn more about the Instrument –May not do data analysis –Knowledge will benefit their work in the LAT Experts –Know all about it –Please talk to me, I have lots of work for you! The challenge was to design an agenda that would benefit everyone You may fit in one or more categories

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 7/19 The Agenda (1) Position of the Reconstructed Tracks (mm) in the TKR for 3-in-a-row triggers occurring in one Tower only Misreconstructed tracks? Ladder boundaries? Is it a geometrical effect? Sum of the Energy (MeV) in the CAL for 3-in- a-row triggers occurring in one Tower only Are these muons going all the way through the CAL? What some many zero entries? Overview of TKR Reconstruction – Tracy Overview of CAL Energy and Position Measurement – Sasha Two Tower Reconstruction – Leon Description of the Geometry – Anders Description of Cosmic Ray and VDG sources – Xin Overview of TKR SAS analysis during LAT integration – Bill Stay tuned for the following talks…

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 8/19 The Agenda (2) Time-over-Threshold (counts) in the TKR for 3-in-a-row triggers – EM DATA TKR detector and Front end-electronics: which “knobs” to turn? Mutsumi CAL detector and Front end-electronics: which “knobs” to turn? Eric Overview of VDG set-up and accelerator Gary Stay tuned for the following talks… Saturation in the electronics ? Why so many zeroes? CAL Energy Spectrum (MeV) for the VDG Low energy Photon beam ON (OFF) – EM DATA Are these pedestals ? Where should this peak ? How about its width? Why don’t we see  lines ?

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 9/19 The Agenda (3) Number of hits-in-a-row in the TKR for 3-in-a-row triggers – EM DATA Expect 6 hits for this trigger 3 in X and 3 in Y Why less than 6? Reconstructed Track position in the TKR for 3-in-a-row triggers – EM DATA Inefficient ladder, software or hardware problem? Inefficient channels? Overview of Trigger – Gregg/JJ Trigger Event Contribution and Diagnostics – Gregg/JJ Deadtime modeling and Power Density Spectrum - Warren Stay tuned for the following talks…

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 10/19 The Agenda (4) Time-over-Threshold (fC) in the TKR for 3-in-a-row triggers – EM DATA Overview of CAL Energy and Position Measurement – Sasha TKR detector and Front end-electronics: which “knobs” to turn? Mutsumi Overview of Calibrations during LAT integration – Eduardo Overview of SAS Calibration Infrastructure – Joanne Data Taking configurations during LAT integration – Eduardo Stay tuned for the following talks… CAL Energy Spectrum (COUNTS) for the VDG Low energy Photon beam ON – EM DATA Where is the muon peak? What is this ?  2 MIPs? Minimum Ionizing Particle (MIP)?

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 11/19 Tutorials and Discussion Analysis Files –High level variables (merit ntuple) –Low level variables per layer, trigger primitives (SVAC file) File Formats –ROOT –FITS Visualization software –ROOT –HIPPO Event Display –FRED Work in progress, need feedback from USERS to improve tools… Tutorials (close to lunchtime – both days) Explanation of variables and MC files Download and install tools Plot variables and use event display Detailed Discussions (Tuesday after 2:30 pm) Discussions and assignment of projects

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 12/19 Monte Carlo Projects We will present a preliminary list of projects in the next slides and we will review and discuss them tomorrow afternoon THINK about them throughout the Workshop –Do they make sense? –Did we forget something important? EXPLORE the subject you are interested in –Discuss with other people –Ask questions (we are here to learn!) COMMIT to a given subject –Do not need to work alone get your institution involved –Plan to work with other groups if you find it more effective

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 13/19 Monte Carlo Projects (1) TKR –Internal Tower metrology –How precise were the trays manufactured? »Distribution of residuals of center of every SSD w.r.t nominal positions »Systematics with respect to ladder orientation »Intra-tray alignment (e.g. are trays twisted w.r.t. each other?) –Inter tower alignment issues –How are they related to the metrology survey? »Compare numbers from alignment procedure to those from metrology at SLAC –Does the track fit matches where it was supposed to start? »See Leon’s talk –System Performance –Subsystem Performance »Calculate the tracking efficiency of each tower using track segments »Calculate residuals by comparing CAL and TKR locations –Imaging »Make positive and negative images of the ACD tile (to explore ACD efficiency AND the tracking inefficiency and check the coordinate system oriented correctly) »Make positive and negative images of the CAL layers (to expose uniformity of response of the CAL) »Make image of TKR layers to identify location of shorted strips and broken wirebonds See Bill’s talk Preliminary list, we will review it on Tuesday afternoon After long discussions with Bill…

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 14/19 Monte Carlo Projects (2) TKR –Hardware related and/or need real data –Measure hit inefficiencies from high noise level –Count the number of latched triggers corresponding to the number of trigger requests issued –Trigger combination biases –Study the TOT behavior (resolution, uniformity, linearity, saturation) –Study configuration settings effects (pattern recognition) ? (e.g. time delays, GTRC splits) Preliminary list, we will review it on Tuesday afternoon

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 15/19 Monte Carlo Projects (3) CAL –Performance/Calibrations »What is the tracking efficiency? »Can we image the CAL layer by layer (using TKR)? »How well do we find MIPs (e.g. at several angles, within a tower, across towers)? »How do the results from each of the ends of the same crystal compare (e.g. TKR used for muon peak location, how accurate is it)? »What is the light output of tracks crossing diodes? –Hardware related and/or need real data –What is the correlation between first two lower gain ranges? –What is the effect on the data from hit inefficiencies, high noise level and large gain variations? –What are the effects to the data when zero suppression is applied? –How do configuration settings affect the data analyses (e.g. pattern recognition) ? (cross talk and nonlinearities) Preliminary list, we will review it on Tuesday afternoon

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 16/19 Monte Carlo Projects (4) EVT – not details of a subsystem but results from a combined system –Performance »What is a “clean” muon definition? »What are the “zoo” events in Monte Carlo ?(high multiplicity hit and track, “vees” in cosmic rays?) –Hardware related and/or require real data »Can we find gamma rays from showers? »Can we find   ? »What are the “zoo” events in DATA ?(high multiplicity hit and track, “vees” in cosmic rays, neutron events) »Can we find Z>1 tracks in the Ground? Preliminary list, we will review it on Tuesday afternoon

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 17/19 Monte Carlo Projects (5) VDG – Low energy Photons –Performance/Calibration »Can we tell 1 from 2 MIP events? What is the effect of non linearities? »How well can we measure energy for TKR events with and without CAL? »Is the deadtime different between photon and cosmic ray events? –Hardware related and/or need real data »Same as CAL and TKR lists Preliminary list, we will review it on Tuesday afternoon

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 18/19 The LOGO After tutorial 1 you should be able to –Reproduce the logo below –Explain what it means Whoever post the answer first to the Wiki, will get a prize at the group dinner…

GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 19/19 Announcements Please send a copy of your talks to Group 7 pm in Hunan Garden –Confirm with Debbie or Diana during the Coffee break Group Photo –During one of the coffee breaks today (Monday) Project assignments –If you have to leave before the closeout session tomorrow please inform Eduardo on what projects you want to work on