X-Ray Diagnostics for the LCLS Jan. 19-20, 2004 UCLA.

Slides:



Advertisements
Similar presentations
Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Advertisements

Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
1 Optimal focusing lattice for XFEL undulators: Numerical simulations Vitali Khachatryan, Artur Tarloyan CANDLE, DESY/MPY
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
BROOKHAVEN SCIENCE ASSOCIATES CD2 LATTICE IMPROVEMENTS Accelerator Systems Advisory Committee April 23-24, 2007 Stephen Kramer for the NSLS-II Design Team.
SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Performance Analysis Using Genesis 1.3 Sven Reiche LCLS Undulator Parameter Workshop Argonne National Laboratory 10/24/03.
Undulator Physics Requirements April 7, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Undulator Overview FEL Performance Assessment
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
Wrap-up 20 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Spontaneous Radiation at LCLS Sven Reiche UCLA - 09/22/04 Sven Reiche UCLA - 09/22/04.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Undulator Specifications Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Heinz-Dieter Nuhn 1 Undulator Plans June 2009 FAC Undulator Commissioning Heinz-Dieter Nuhn – LCLS Undulator Group Leader June.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
USING A MICRO FABRICATED UNDULATOR TO BRIDGE THE FOUR DECADE GAP BETWEEN REGULAR PURE PERMANENT MAGNET UNDULATORS AND INVERSE COMPTON SCATTERING SOURCES.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
Alignment and Beam Stability
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
SuperConducting Undulator (SCU) R&D Motivation and Status P. Emma For the SCU R&D collaboration: ANL, LBNL, SLAC June 27, 2014.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Undulator parameters choice/wish based on a simplified XFEL cost model Jürgen Pfingstner 29 st of July 2015.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
LCLS-II Physics Meeting, May 08, 2013 LCLS-II Undulator Tolerances Heinz-Dieter Nuhn LCLS-II Undulator Physics Manager May 8, 2013.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
FEL Simulations: Undulator Modeling Sven Reiche Start-end Workshop DESY-Zeuthen 08/20/03.
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
Slice Parameter Measurements at the SwissFEL Injector Test Facility
AD & I : BDS Lattice Design Changes
SCU Next Phase Meeting July 8, 2014.
Phase Adjustments: K vs
Beam-Based Alignment Results
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
Gain Computation Sven Reiche, UCLA April 24, 2002
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Linac Diagnostics Commissioning Experience
DTL M. Comunian M. Eshraqi.
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
Undulator Physics Diagnostics / Commissioning Strategy Heinz-Dieter Nuhn, SLAC / SSRL August 11, 2004 Undulator Overview FEL Parameters Diagnostics and.
Final Break Length Choice AC Conductivity Wakefields
Electron Collider Ring Magnets Preliminary Summary
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

X-Ray Diagnostics for the LCLS Jan , 2004 UCLA

General Assumptions (See CDR) Undulators Fixed in Position –Exception: Small motion for alignment Fixed Gap Undulators Permanent Magnet Quads Cavity BPMs following each undulator and prior to the 1 st Full suite of diagnostics every third undulator

Current Thinking Use NdFeB –Radiation Damage Issue Real benefit of Sm 2 Co 17 still no known Must determine acceptable losses APS is doing this for operational reasons 7 Additional undulators planned for use in regular maintenance schedule –Temperature Compensation Sm 2 Co 17 slightly more than a factor of 2 better. Not enough.

Current Thinking K Adjustment/Control Strategy Cant (mrad) Horizontal alignment accuracy (mm)  B eff /B eff over 10 mm Range of hort. motion (mm) for  B eff /B eff = ±1.5x10 -3 (±5.5x10 -4 ) b Incremental thickness (mm) of mech. shims x10 -3 ±5.0 (±1.8) x10 -3 ±3.3 (±1.2) x10 -3 ±2.5 (±0.9)0.020 a All calculations were made according to a tolerance of 1.5x10 -4 and a total range of  1.5x10 -3 (  20 Gauss) for  B eff /B eff. Spacer thickness steps were chosen to allow full compensation at half travel of the total range of motion. b The range of horizontal motion listed in the parentheses corresponds to ±1°C temperature compensation. To allow for temperature compensation of ±1°C the additional range of motion listed in parentheses should be provided.

Effect of K Errors

Undulator segment tolerances ParameterSpecified Value Trajectory excursion (both planes) 2  m Radiation amplitude deviation2% Phase slippage between undulators10° a Vertical positioning error 50  m a Total allowed phase slippage including all errors. The error in the effective magnetic field Beff, totally dominates the contributions.

Phase Error Correction Applied

Calculated gain length and increase in saturation length using a random uniform distribution of K values from one undulator to the next with end-phase corrections applied for the LCLS beam parameters. a  K/K Gain length (m) b Increase in sat. length (m) c ±3.5x * - ±7.0x ~ 1.7 m ±10.0x ~ 3.4 m a Normalized beam emittance was 1.5 mm-mrad, beam energy spread 2.1x10 -4, FODO lattice strength m -1, and peak current 3.5 kA. Other parameters same as in Table 1. b The gain length was derived over the next-to-last super period of six undulators. c The increase in saturation length was estimated near 100 m by determining how much additional distance was needed to reach the same level of ln|J| 2. * Same value as for  K/K = 0.

Current Thinking Undulator System Fully Installed on day 1 Start at 800 eV –Why?

UNDULATOR mm Horizontal Steering Coil Vertical Steering Coil Beam Position Monitor 852 X-Ray Diagnostics Quadrupoles Cell structure of the LCLS Undulator Line 33 Undulators ~ 130-m Overall Length Pioneering Science and Technology Office of Science U.S. Department of Energy

PRIOR WORK FOR INTRA-UNDULATOR DIAGNOSTICS (CDR April 2002) Electron Beam Diagnostics (Section 8.11, Glenn Decker and Alex Lumpkin) Table 8.9 Undulator electron beam diagnostics Type QuantityLocationBXY Notes *Beam position monitor48All stationsCavity / Button combo OTR imaging diagnostic13Every third stationThin aluminum foil screen Wire scanners4Upstream of Undulator segments *Cherenkov Detectors33All stationsFused silica / PMT combo *Current Monitors2Upstream/downstream of undulator Toroid transformer * Non-intercepting X-ray Diagnostics (Section 8.13, Efim Gluskin and Petre Ilinski)  On-axis diagnostics Diamond (111), 4 – 9 keV, cooled silicon PIN diode.  Off-axis diagnostics Hole crystal, 2  = 90 , CCD detector.

ENTRANCE SECTION

Gamma Ray Detector

Issues Quad Fixed to the Undulator –Has implications on using the cant for tuning Requires separate motion Tunnel Temperature Control –Would like better than +/- 0.2 Degrees C. Supports will probably need this or better 800 eV –Makes life very difficult for the x-ray diagnostics –Would prefer to start a > 2 KeV

Issues Motion Capability –We need some for K tuning but… –Do we need the ability to completely remove the undulators? Aside: 0.1 G deflects the 14 GeV beam by ~1.5 um in 3.7 m. High Power Damage –Can we even make a diagnostic that is both useful and can handle the power densities of the FEL?

Issues Radiation Damage –We will use NdFeB –We must protect the undulator from radiation This has implications on intraundulator interceptive diagnostics Canted Poles –BBA There will be some arbitrary offset and anle through the undulator How does this impact the K tuning?