8-Nov-06 GDE Valencia Global Design Effort 1 MDI Related Potential Design Changes Barry Barish Caltech / GDE 8-Nov-06.

Slides:



Advertisements
Similar presentations
The ILC low power option Andrei Seryi SLAC ILC08 and LCWS08 November 17, 2008 Photo: Dan Chusid, 2003.
Advertisements

10-Nov-06 GDE Valencia Global Design Effort 1 Road to Beijing and Beyond Barry Barish Caltech / GDE 10-Nov-06.
Considerations on ILC Crossing Angle K. Yokoya LCWS13, BDS, Tokyo Univ. 2013/11/12 LCWS Yokoya1 Motivation Gamma-gamma collider CLIC.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
11-Nov-06 ILCSC - Valencia Global Design Effort 1 GDE Report and Discussion of Costs Barry Barish Caltech / GDE 6-Nov-06.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
September 20, 2006 Global Design Effort 1 Process of change of BDS baseline to 14/14 configuration BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto,
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
November 07, 2006 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
Philip Burrows SiD Meeting, SLAC 27/10/06 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University.
Minimum Machine Definition: Next Steps Nick Walker AS TAG leaders meeting
ILC-GDE Meeting Beijing Feb Effect of MDI Design on BDS Collimation Depth Frank Jackson ASTeC Daresbury Laboratory Cockcroft Institute.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Status of GDE BDS Design Talk based on several talks presented by BDS area leaders Andrei Seryi, Hitoshi Yamamoto, Deepa Angal-Kalinin at and after Vancouver.
1 Gamma Gamma Collider Physics Report Tim Barklow SLAC Apr 18, 2009.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Integration Ideas for the Central Region Some old some new
News and brief overview of Beamline plans for the next few months
Beam Delivery System Schedule at ILC2010
Extract from today’s talk given to DCB
BDS civil construction Single IR upgrade scenarios discussion
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

8-Nov-06 GDE Valencia Global Design Effort 1 MDI Related Potential Design Changes Barry Barish Caltech / GDE 8-Nov-06

8-Nov-06 GDE Valencia Global Design Effort 2 Outline Context of Design Changes under Consideration Changes Accepted –2x20 mr  14x14mr –Surface Detector Assembly –Reduced Muon Shield Changes being Considered –Reduce # Bunches by 2 –Single IR with Push-Pull Detectors Timescale & Plans for RDR Comment on Longer Term Issues and Plans

8-Nov-06 GDE Valencia Global Design Effort 3 Vancouver Cost Data

8-Nov-06 GDE Valencia Global Design Effort 4 Costs by Area System

8-Nov-06 GDE Valencia Global Design Effort 5 Costs by Technical & Global System

8-Nov-06 GDE Valencia Global Design Effort 6 Vancouver  Valencia Cost Reduction Design Scope Component Costs Physics Scope No big ticket items! Just lots of  1% effects Cost are too high !

8-Nov-06 GDE Valencia Global Design Effort 7 Design Changes Under Consideration RDR MBCCB 2  14mr IRs supported central injectorssupported Removal of service tunnelrejected conventional e+ sourcerejected RF unit modifications (24  26 cav/klys) supportedsubmitted reduced RF in DR (6  9mm  z ) supportedin prep DR race-track lattice (CFS)supportedin prep reduced static cryo overheadsupportedin prep removal linac RF overheadsupportedin prep single-stage bunch compressorrejected e- source: common pre-acceleratorsupportedin prep

8-Nov-06 GDE Valencia Global Design Effort 8 MDI Related Design Changes Some cost / performance design changes would affect physics performance or reach. We are trying to pick items without major impact or are reversible changes –Two detectors preserved; but no small crossing angle beam; (immature design, high cost, small physics loss) –Reduced Muon Shield; (add later, if needed) –Detector Mounting on Surface; (has schedule benefits) –Energy reach: maintain 500 GeV (but redefine performance at that energy) –Peak Luminosity; (reduce for initial running; but, upgradeable) –Two detectors preserved, but one beam line + push-pull These are being fully discussed and coordinated with the Physics Community –MDI Panel; WWS; Physics Parameter Group

8-Nov-06 GDE Valencia Global Design Effort 9 Vancouver Baseline Two IRs with 20mrad and 2mrad crossing angle Two collider halls separated longitudinally by 138m 20mr IR 2mr IR FF E-collim.  -collim. Diagnostics BSY tune-up dump grid is 100m*5m

8-Nov-06 GDE Valencia Global Design Effort 10 Vancouver Costs for BDS Cost drivers –CF&S –Magnet system –Vacuum system –Installation –Dumps & Collimators Total Cost Additional costs for IR20 and IR2

8-Nov-06 GDE Valencia Global Design Effort 11 2/20 mrad  14/14 mrad Motivation –Reduce costs 2 mrad beam line expensive, risky, especially extraction line Common collider hall –Advantages Improved radiation conditions in the extraction lines Better performance of downstream diagnostics Easier design and operation of extraction optics and magnets Reduced back scattering from extraction line elements –Disadvantages Impact on physics (appears minor at present). Simpler incoming beam optics R&D on small crossing angles will continue as alternative

8-Nov-06 GDE Valencia Global Design Effort 12 2/20 mrad  14/14 mrad Design & cost of 14/14 with common collider hall & z=0 –Design of 14mr beamline is similar to 20mrad –The cost reduction in this configuration is ~16% Physics/Detector Community (MDI – WWS) –“With this limited information, the MDI panel thinks that the 14mrad is acceptable as the baseline at this time. However, we would like to stress that the 2mrad crossing angle is clearly desirable than larger crossing angles for the slepton search, and R&Ds related to 2mrad should be encouraged. ”

8-Nov-06 GDE Valencia Global Design Effort 13 Muon walls Baseline configuration: 18m and 9m walls in each beamline Scheme of a muon wall installed in a tunnel widening which provide passage around the wall Purpose: –Personnel Protection: Limit dose rates in one IR from other IR –Physics: Reduce the muon background in the detectors

8-Nov-06 GDE Valencia Global Design Effort 14 Reduced Muon Walls Considerations –The estimation of 0.1% beam halo population is conservative and not supported by any simulations –The min muon wall for personnel protection is 5m –Detector can tolerate higher muon flux. –Cost of long muon spoilers is substantial, dominated by material cost –Alternatives – muon spoilers need study The caverns will be built for full length walls, allowing upgrade if higher muons flux would be measured MDI panel accepted this change.

8-Nov-06 GDE Valencia Global Design Effort 15 BDS Layout for New Baseline IP2 IP1 10m 1km beam dump service hall alcoves 9m shaft for BDS access polarimeter laser borehole muon wall tunnel widening

8-Nov-06 GDE Valencia Global Design Effort 16 Hall Designs for two IRs Valencia Vancouver

8-Nov-06 GDE Valencia Global Design Effort 17 On-surface Detector Assembly Vancouver WBS considered the underground halls sized at 32m (W) x 72m (L) each to allow underground assembly of the largest considered detector. Conventional Facilities Schedule gives detector hall is ready for detector assembly 5 yrs from project start –If so, cannot fit our goal of “7years until first beam” and “8years until physics run” Surface assembly allows to save years and allows to fit into this goal –The collider hall size may be smaller (~40-50%) in this case –A building on surface is needed, but savings may be still substantial Optimization needs to be done

8-Nov-06 GDE Valencia Global Design Effort 18 CMS assembly approach Assembled on the surface in parallel with underground work Allows pre-commissioning before lowering Lowering using dedicated heavy lifting equipment Potential for big time saving Reduce size of underground hall required On-surface assembly

8-Nov-06 GDE Valencia Global Design Effort 19 Cost details of new 14/14 baseline Updates from CF&S Magnets to be included Should we go to a single IR and push pull system and save 30% of BCD costs?

8-Nov-06 GDE Valencia Global Design Effort 20 Push-Pull Evaluation Initiated by GDE & WWS at the end of September Detailed list of questions to be studied developed: Large group of accelerator and detector colleagues, from ILC and other projects, is participating in design and discussion of these question The task force of detector experts was formed to contribute to detailed evaluation of the whole set of technical issues

8-Nov-06 GDE Valencia Global Design Effort 21 Would 1 IR lead to 1 Detector? NO! We have no intention of going to one detector. In my opinion, the case for two detectors is much stronger, if it does not require a second expensive beam line However, it the burden on the detector community is to develop two complementary detectors.

8-Nov-06 GDE Valencia Global Design Effort 22 Seryi - Some Questions Is there, in the beamline, a natural breaking point? Do we need to redesign the beamline to optimize location of breaking point? Is part of beamline (part of FD) remains in detector when it moves? What vacuum connections are needed in breaking point? Do we have to use the same L* for either detector or it can be different? How the connections of electrical, cryo, water, gas, etc, systems are arranged?

8-Nov-06 GDE Valencia Global Design Effort 23 Is there, in the beamline, a natural breaking point? –yes, it can be arranged, between QD0 and QF1 Do we need to redesign the beamline to optimize location of breaking point? –yes and a first version of optics already produced Is part of beamline (part of FD) remains in detector when it moves? –yes, this seems to be the most optimal way What vacuum connections are needed in breaking point? –two vacuum valves with RF-shield, details are being worked out Do we have to use the same L* for either detector or it can be different? –Different L* is possible, but same L* gives benefits and may save time How the connections of electrical, cryo, water, gas, etc, systems are arranged? –Part of electronics and services can be placed on a platform which moves with detector. Flexible connections to stationary systems needed. Seryi - Some Questions

8-Nov-06 GDE Valencia Global Design Effort 24 Seryi - More Questions What is the suitable way to move (rails, air-pads) the detector? For quick change-over, do we need to make detector self shielding? What are the design changes needed to make the detector self shielded? If there is a need in shielding wall between detectors, what is the method of its removal and assembly? What arrangements or reinforcements (such as imbedded steel) are needed for the floor of the collider hall? Is there a need to open detector when it is on the beamline, or it would be only opened in the off-beamline position?

8-Nov-06 GDE Valencia Global Design Effort 25 What is the suitable way to move (rails, air-pads) the detector? –air-pads seems as a possibility For quick change-over, do we need to make detector self shielding? –It would help, but self-shielding is not absolutely required for quick change-over What are the design changes needed to make the detector self shielded? –For GLD/SiD/LDC, self-shielding has been shown in simulations. For the fourth detector concept (double solenoid with no iron), implementing self-shielding may be difficult If there is a need in shielding wall between detectors, what is the method of its removal and assembly? –The shielding wall, if needed, can consist of two parts and move on air- pads in hours What arrangements or reinforcements (such as imbedded steel) are needed for the floor of the collider hall? –Steel plates (~5cm thick, welded) to cover the collider hall floor Is there a need to open detector when it is on the beamline, or it would be only opened in the off-beamline position? –Opening one beamline desirable, certain design optimization needed Seryi - More Questions

8-Nov-06 GDE Valencia Global Design Effort 26 M. Woodley IR 14 mrad 14 mrad ILC FF9 hybrid (x 2) 14 mrad (L* = 5.5 m) dump lines e-e+ hybrid “BSY” (x 2) 2226 m ΔZ ~ -650 m w.r.t. ILC2006c Upgrade to 1 TeV COM involves adding magnets only … no geometry changes Total Z-length is 4452 m (2 IRs: 5100m) Single IR BDS Configuration

8-Nov-06 GDE Valencia Global Design Effort 27 Seryi (Joint BDIR/GDE/WWS/MDI)

8-Nov-06 GDE Valencia Global Design Effort 28 Reduced # Bunches Impact of ILC operation with a reduced number of bunches Introduction As a possible cost reduction option, a proposal to operate with half the number of bunches (approximately 1330 bunches) over the same train length (one ms) is being considered. Because of a factor of two reduction in the size of the RF system, this modification will result in a net savings of 2-3% of the total project cost. Although the peak luminosity of the machine will be reduced by a factor of two, a relatively straightforward upgrade of the RF system can fully restore the machine’s luminosity performance to that of the current baseline.

8-Nov-06 GDE Valencia Global Design Effort 29 Reduced Bunches – WWS Questions The technical merits of the reduced number of bunches: We understand there are several merits to the reduced number of bunches. We would like to know how critical they actually are. Are they something we do not have solutions now which are solved by halving the number of bunches? Could you indicate the level of current difficulties? E.g. : –ECE in the dumping ring, extraction kicker, and multi-bunch instabilities. –Positron source target –Other possible merits A reduction of the number of bunches does certainly relax several technical challenges for other parts of the machine, most notably the damping rings (instabilities, kickers etc.), the positron target and the main power dumps. But we would like to stress that our current scenario still maintains the specification at the original full current, so we assume these problems would be solved at some point.

8-Nov-06 GDE Valencia Global Design Effort 30 More Questions from WWS The RF upgrade to recover the 'full luminosity' –Required hardware –Amount of work needed to install them –Realistic upgrade schedule –Changes required elsewhere of the machine associated with the upgrade –Cost needed for the upgrade, and how it compares to installing the 'full RF' as the baseline from the start –Realistic scenario after the start of the baseline machine when the upgrade is proposed, approved, funded, and the upgrade work can begin. Discussed at GDE RDR Management meeting and preliminary replies given to WWS

8-Nov-06 GDE Valencia Global Design Effort 31 Luminosity Model – ½ RF Scenario Full rf system yearpeak Lavail% peaklum/yrint lum 12.00E+3310%80%3.57E E+3330%80%3.22E E E+3470%80%1.63E E E+3480% 2.86E E+41 Half rf system yearpeak Lavail% peaklum/yrint lum 12.00E+3310%80%3.57E E+3330%80%3.22E E E+3470%80%1.25E E E+3480% 1.57E E E+3480% 1.72E E+41 tor

8-Nov-06 GDE Valencia Global Design Effort 32 Plans until Beijing (Feb. '07) NovemberDecemberJanuaryFebruary Valencia Further cost consolidation CCR preparation & submission Cost & Design Freeze 30/11 Prepare for Full Cost Review SLAC Cost Review 14-16/12 MAC 10-12/01/07 Final cost corrections and documentation Agency cost briefings Beijing: RDR draft published RDR final editing RDR prepare 1 st drafts

8-Nov-06 GDE Valencia Global Design Effort 33 What Happens after Beijing? Public Release of Draft RDR and Preliminary Costing at Beijing –Cost Reviews, etc –Finalize RDR by Summer 2007? Enter into Engineering Design Phase –Planning underway internally –Design will evolve through value engineering and R&D program, –Some potential changes will effect MDI and we will need to continue close collaboration –General Goal is to have Construction Proposal ready by 2010

8-Nov-06 GDE Valencia Global Design Effort 34 Conclusions The ILC design must be systematically studied for cost vs performance to determine RDR design, and to defend it For the RDR, we have selected a dozen or so potential changes that can result in cost savings of 1% or more. Other changes need more time or engineering details to pursue and have been deferred until after the RDR Some changes effect physics or detectors and we are working those with the MDI and WWS.