Working together for clean air Approved Regional Method (ARM) Demonstration Puget Sound Clean Air Agency Mike Gilroy, Erik Saganic Puget Sound Clean Air.

Slides:



Advertisements
Similar presentations
Harmonization of Parts 60 and 75
Advertisements

EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS.
Northwest Airquest Annual Meeting NAAQS Update December, 2006 Bruce Louks, Idaho Dept. of Environmental Quality All slides in this presentation are taken.
Although this monitor is owned and operated by the State of Missouri, significant research was conducted with this technology for fence-line monitoring.
Ambient Air Monitoring for the Revised Lead NAAQS Daniel Garver US EPA Region 4.
Status of 8-Hour Ozone NAAQS Program in Clark County Presentation to Air Quality Forum May 10, 2005.
Quality Assurance for Tribal FIFRA Enforcement Grants David R. Taylor EPA Region 9 Quality Assurance Office.
PM-2.5 FEM Requirements for Met One BAM Glenn Gehring, Technology Specialist Tribal Air Monitoring Support (TAMS) Center
AQS Concepts. In This Section We Will Talk About AQS Concepts 2 AQS Background History AQS as part of a monitoring program Types of Information in AQS.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Working Together for Clean Air PM 2.5 Continuous Methods Lynnwood, Washington Site.
1 AQS Ambient Monitoring Topics AQS Conference August 20, 2008 David Lutz.
1 Guest Speaker: Bill Frietsche US EPA.  April 7: QA Systems, EPA definitions, PQAOs and common sense – Mike Papp  April 14: Routine Quality Control.
What to compare against the validation templates (see templates in course webpage: Resources/Validation%20Templates%20from%20Red.
1 Emission and Air Quality Trends Review Washington July 2013.
Overview and Status of Lead NAAQS Review and Overview of Agency Technical Documents on Lead NAAQS Monitoring Issues Kevin Cavender and Joann Rice Presented.
1 Key Monitoring Issues Status of PM 2.5 monitoring methodologies Criteria for acceptance of monitors and sites Special considerations for comparing ambient.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Introduction to Standard Reports. Standard Reports 2 How to get information out of AQS Standard Reports Site / Monitor Metadata Detail Data Reports “
Melinda Ronca-Battista, ITEP, TAMS Center Tribal Air Monitoring and QA Requirements for NAAQS- Comparable Data.
HD 2007 Rule Diesel Fuel Sulfur Testing and Sampling Methods and Requirements US EPA Office of Transportation and Air Quality November 20, 2002.
1 Guest Speaker: Brandy Toft Leech Lake Ojibwe.  Overview of FRM/FEM/ARM status, requirements, and reporting  QC (routine checks, audits, and method-
Timely Policy-Related Monitoring Issues 2013 NACAA Spring Meeting May 6-8, 2013 Richard A. “Chet” Wayland Air Quality Assessment Division U.S. EPA OAQPS.
 April 7: QA Systems, EPA definitions, PQAOs and common sense – Mike Papp  April 14: Routine Quality Control and Data Management (1-pt QC, flow rate,
Recent Developments in Transportation Conformity Beverly Chenausky Multimodal Planning Division – Air Quality Breakout Session: Transportation Conformity/Air.
Quality Control/ Quality Assurance Annabelle Allison ITEP/TAMS Center.
Proposed Revisions to Ambient Air Monitoring Regulations, and Proposed FY2007 Air Monitoring Guidance WESTAR Spring Business Meeting March 28, 2006.
Working together for clean air Tacoma Clean Air Performance Commitment May 2010.
Quality Control – Part II Tim Hanley EPA Office of Air Quality Planning and Standards.
Emergency Air Monitoring During Wildfires Jim Homolya USEPA Office of Air Quality Planning and Standards Research Triangle Park, NC.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
EPA Region 9 Meredith Kurpius August 19, Status of Tribal Air Monitoring Value of tribal monitoring Used to protect public health on tribal land.
Appendix A: Calculations for Data Quality Assessment QC check statistics Precision calcs Bias calcs PM stats Reporting: quarterly and annual.
CARB Continuous PM 2.5 Monitoring Activity (BAM’s) Reggie Smith California Air Resources Board.
Overview and Status of Lead NAAQS Review and Overview of Agency Technical Documents on Lead NAAQS Monitoring Issues Kevin Cavender and Joann Rice Presented.
USEPA REGION 4 Quality Management Plan ( For training purposes only)
PM 2.5 Continuous FEMs; Update and Assessments For AMTAC April 12, 2011 Kate Hoag – US EPA, Region 9.
Designations for 24-Hour PM2.5 NAAQS: Overview and Guidance Amy Vasu PM2.5 Workshop June 20-21, 2007.
An Overview of EPA’s Quality Assurance Guidance for Ambient Air Quality Monitoring Data Data Analysis and Interpretation February 12 – 14, 2008, Tempe,
Dirk Felton RTP, NC February 12-13, 2008 Air Quality Data Summit: Session: Inventory of Data Systems Data provider perspectives.
 April 7: QA Systems, EPA definitions, PQAOs and common sense – Mike Papp  April 14: Routine Quality Control and Data Management (1-pt QC, flow rate,
Model For Relating PM 2.5 Federal Reference Method & Nephelometer Measurements Presented by Jenny Parikh.
NAAQS and Criteria Pollutant Trends Update US EPA Region 10.
Federal Equivalent Methods and Federal Reference Methods Tim Hanley U.S. EPA OAQPS.
ECOS Information Session Draft EPA Quality Documents February 13, 2013 Presented by EPA Quality Staff, Office of Environmental Information For meeting.
NATIONAL TRIBAL FORUM ON AIR QUALITY 2013 Establishment of a PM 2.5 Monitoring Network on the Colville Reservation.
Exceptional Events and Fire Policy Presented by Don Hodge, U.S. EPA Region 9 Interagency Air and Smoke Council meeting May 2, 2012 Disclaimer: Positions.
Measurement Quality Objectives = Data Validation Requirements Excerpted from EPA QA Handbook Volume II (aka “Redbook”)
Quality Management Plans (QMPs) and Quality Assurance Project Plans (QAPPs) Danny France and Greg Noah EPA Region 4, SESD December 6, 2006.
PM 2.5 Continuous FEMs; Update and Assessments For NESCAUM Monitoring Meeting April 29, 2011 Tim Hanley – US EPA, OAQPS 1.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
PM Methods Update and Network Design Presentation for WESTAR San Diego, CA September 2005 Peter Tsirigotis Director Emissions, Monitoring, and Analysis.
Working together for clean air Preliminary Analysis of PM 2.5 Speciation Data in Puget Sound Puget Sound Clean Air Agency Mike Gilroy, Erik Saganic Puget.
Module 11 Module I: Terminology— Data Quality Indicators (DQIs) Melinda Ronca-Battista ITEP Catherine Brown U.S. EPA.
Working together for clean air New source apportionment approaches to estimate diesel Puget Sound Clean Air Agency Erik Saganic Puget Sound Clean Air Agency.
EPA’s White Paper and Workshop on Background Ozone NASA AQAST 10 th Semiannual Meeting – 1/6/16.
Supplier Performance Development Process
Implementation of Exceptional and Natural Events Policies and Rules in Arizona Ira Domsky, Deputy Director February 25, 2009.
Department of Air Quality Exceptional Event Streamlining, Standardization & Coordination CDAWG November, 2015 Clark County.
Ozone and Lead Monitoring Issues Under Revised NAAQS Monitoring Steering Committee June 21-22, 2007 Washington, DC Phil Lorang, OAQPS.
Annual Air Monitoring Data Certification and Concurrence Process 1.
Orientation to Quality Assurance
Preparing A Useful 5-Year Network Assessment
of Key Characteristics
Proposed Ozone Monitoring Revisions Ozone Season and Methods
Emission and Air Quality Trends Review
Continuous PM2.5 Monitoring
A New Tool for Evaluating Candidate PM FEM and PM2.5 ARM Monitors
2017 Summer Wildfire Smoke Updates
2017 Summer Wildfire Smoke Updates
Presentation transcript:

Working together for clean air Approved Regional Method (ARM) Demonstration Puget Sound Clean Air Agency Mike Gilroy, Erik Saganic Puget Sound Clean Air Agency Mike Gilroy, Erik Saganic

Overview Definition of the ARM Sites and Instruments that may apply ARM Tools Preliminary Results Definition of the ARM Sites and Instruments that may apply ARM Tools Preliminary Results

What is the “ARM”? The Approved Regional Method EPA established in 40 CFR 58, Appendix C, Section 2.4 Defined in CFR as “Approved regional method (ARM) means a continuous PM 2.5 method that has been approved specifically within a State or local air monitoring network for purposes of comparison to the NAAQS and to meet other monitoring objectives. ” The Approved Regional Method EPA established in 40 CFR 58, Appendix C, Section 2.4 Defined in CFR as “Approved regional method (ARM) means a continuous PM 2.5 method that has been approved specifically within a State or local air monitoring network for purposes of comparison to the NAAQS and to meet other monitoring objectives. ”

Pertinent Information (Source: 40 CFR 58, Appendix C, Section 2.4) Applications can be accepted as of 09/28/06 to EPA-ORD. Must meet Class III FEM guidelines. However, if low levels are typical, may approve large bias. 30% collocation of “required FRM/FEM/ARM sites” rounded up with 1 in 6 collocated frequency ≥ 7.5% of sites for the comparison requires a collocated candidate ARM for Coefficient of Variation (CV) calculations. Applications can be accepted as of 09/28/06 to EPA-ORD. Must meet Class III FEM guidelines. However, if low levels are typical, may approve large bias. 30% collocation of “required FRM/FEM/ARM sites” rounded up with 1 in 6 collocated frequency ≥ 7.5% of sites for the comparison requires a collocated candidate ARM for Coefficient of Variation (CV) calculations.

Pertinent Information (Source: 40 CFR 58, Appendix C, Section 2.4) Data can be recalculated in non-linear fashion Details must be included in Agency QAPP and ARM application to ORD. Section “ The ARM must be capable of providing for flow audits, unless by its inherent measurement principle, measured flow is not required.” Need: 1-2 FRMs and 1-2 candidate monitors for each ARM. Validate periodically with changing aerosols and instrument performance. Data can be recalculated in non-linear fashion Details must be included in Agency QAPP and ARM application to ORD. Section “ The ARM must be capable of providing for flow audits, unless by its inherent measurement principle, measured flow is not required.” Need: 1-2 FRMs and 1-2 candidate monitors for each ARM. Validate periodically with changing aerosols and instrument performance.

Pertinent Information (Source: 40 CFR 58, Appendix C, Section 2.4) Yearly assessments Network assessments every 5 years Data Duration: 1 year (seasons) ≥ 90 sample sets required ≥ 20 per season required Up to 2 CBSA/CSA & 1 Rural or MSA, 1 of each in areas already approved If WA DoE already accepted, than can go straight to Region X office for approval External audits are required as an FEM. Yearly assessments Network assessments every 5 years Data Duration: 1 year (seasons) ≥ 90 sample sets required ≥ 20 per season required Up to 2 CBSA/CSA & 1 Rural or MSA, 1 of each in areas already approved If WA DoE already accepted, than can go straight to Region X office for approval External audits are required as an FEM.

Our Objectives Collect 1-year of precision collocated data for all perspective ARM samplers To package all our applicable data for analysis Determine if the data meets regulations To compile all the necessary QAPP’s Submit the data package for approval if all the data meets regulations Collect 1-year of precision collocated data for all perspective ARM samplers To package all our applicable data for analysis Determine if the data meets regulations To compile all the necessary QAPP’s Submit the data package for approval if all the data meets regulations

PSCAA Sites with Recent FRM Data Snohomish County (Possibly non-attainment): Marysville (Wood Smoke Aerosol) Darrington (Wood Smoke Aerosol) Lynnwood (Wood Smoke Aerosol) – Analysis no longer on-going Pierce County (Will be non-attainment): South Tacoma (Wood Smoke Aerosol) King County (Attainment): Lake Forest Park (Wood Smoke Aerosol) Seattle – Duwamish (Industrial Aerosol) Snohomish County (Possibly non-attainment): Marysville (Wood Smoke Aerosol) Darrington (Wood Smoke Aerosol) Lynnwood (Wood Smoke Aerosol) – Analysis no longer on-going Pierce County (Will be non-attainment): South Tacoma (Wood Smoke Aerosol) King County (Attainment): Lake Forest Park (Wood Smoke Aerosol) Seattle – Duwamish (Industrial Aerosol)

Other Recent FRM Data Available in Washington Clark County Vancouver – (Urban Residential Aerosol – Wood smoke)  Data good only through 2004 King County Seattle – Beacon Hill (Urban Residential Aerosol) Okanogan Twisp – Rural site (Wood smoke/Forest fire Aerosol?)  Data good only through 2004 Spokane County Spokane – Ferry Street (Aerosol type - Industrial?) Yakima County Yakima (Aerosol type – Industrial/Agricultural?)  Data good only through 2004 Clark County Vancouver – (Urban Residential Aerosol – Wood smoke)  Data good only through 2004 King County Seattle – Beacon Hill (Urban Residential Aerosol) Okanogan Twisp – Rural site (Wood smoke/Forest fire Aerosol?)  Data good only through 2004 Spokane County Spokane – Ferry Street (Aerosol type - Industrial?) Yakima County Yakima (Aerosol type – Industrial/Agricultural?)  Data good only through 2004

Sites in WA since 2004 with FRM data that does not meet ARM requirements Benton County Kennewick (Discontinued after 2005, ran only 1/6 sampling) Spokane County Spokane – Monroe Street (Discontinued after 2005, ran only 1/6 sampling) Benton County Kennewick (Discontinued after 2005, ran only 1/6 sampling) Spokane County Spokane – Monroe Street (Discontinued after 2005, ran only 1/6 sampling)

PSCAA Potential Candidate ARMs by Site Darrington Nephelometer (ongoing) Lake Forest Park Nephelometer (ongoing) TEOM (ongoing) Lynnwood Nephelometer (Old Data) FDMS-TEOM (Old Data) TEOM (Old Data) Marysville Nephelometer (ongoing) TEOM (ongoing) Seattle – Duwamish Nephelometer (ongoing) FDMS-TEOM (after a year of data completion) TEOM (older data) South Tacoma Nephelometer (ongoing) TEOM (ongoing) Darrington Nephelometer (ongoing) Lake Forest Park Nephelometer (ongoing) TEOM (ongoing) Lynnwood Nephelometer (Old Data) FDMS-TEOM (Old Data) TEOM (Old Data) Marysville Nephelometer (ongoing) TEOM (ongoing) Seattle – Duwamish Nephelometer (ongoing) FDMS-TEOM (after a year of data completion) TEOM (older data) South Tacoma Nephelometer (ongoing) TEOM (ongoing)

Other WA Potential Candidate ARMs by Site Beacon Hill Nephelometer (ongoing) TEOM (ongoing) Spokane – Ferry Street Nephelometer (ongoing) TEOM (ongoing) Vancouver TEOM (2004 only) Yakima Nephelometer (2004 only) Twisp Nephelometer (2004 only) Beacon Hill Nephelometer (ongoing) TEOM (ongoing) Spokane – Ferry Street Nephelometer (ongoing) TEOM (ongoing) Vancouver TEOM (2004 only) Yakima Nephelometer (2004 only) Twisp Nephelometer (2004 only)

Tools for the ARM Templates are available that contain all the details necessary to apply for the application Excel file with calculations built in Word Document to describe the sites, methods, descriptions, QA procedures, etc. Templates are available that contain all the details necessary to apply for the application Excel file with calculations built in Word Document to describe the sites, methods, descriptions, QA procedures, etc.

Example of Excel Summary Tab – Marysville Nephelometer

Will any instruments be approved? Preliminary correlations indicate yes. However, as aerosols change overtime, there may be difficulty for surrogate analyzers (like the nephelometer).  There is a 30% collocated FRM requirement in the network that would monitor this issue. Preliminary correlations indicate yes. However, as aerosols change overtime, there may be difficulty for surrogate analyzers (like the nephelometer).  There is a 30% collocated FRM requirement in the network that would monitor this issue.

Word Document Example

Summary In Washington state, we have a few analyzers that we will aim to achieve ARM status: Nephelometer TEOM TEOM-FDMS Preliminary analysis indicates the data fits the criteria, but we are at the mercy of EPA-ORD Evolving aerosols are still of some concern and sites may loose ARM status In Washington state, we have a few analyzers that we will aim to achieve ARM status: Nephelometer TEOM TEOM-FDMS Preliminary analysis indicates the data fits the criteria, but we are at the mercy of EPA-ORD Evolving aerosols are still of some concern and sites may loose ARM status