Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

Market Analysis Learning Unit 3.
Transition from Q1- 8th to Q1- 9th edition
Market Operations Standing Committee of the IMO1 Implementation of new Information Disclosure Reports Ken Kozlik July 23, 2003.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
IMO Perspective on Reliability A presentation to the IEEE Toronto Section Forum on Reliable Power Grids in Canada by Dan Rochester, Section Head - Assessments.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
4. Project Investment Decision-Making
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
IMO 18-Month Outlook Presentation to the F&ASC June 25, 2003.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Business cost and revenue
Risk of Infrastructure Failure in the Natural Gas Industry Aileen Alex Energy Information Administration U.S. Department of Energy.
NWSChat (Instant Messaging) Instant Messaging system for the NWS and Partners NWSChat Carlos Diaz June 2009.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Takaful and Mutual Insurance Business Challenges in Mutual Insurance and Takaful Serap Gonulal November 13, 2012.
1 The availability, timeliness and quality of rapid estimates UNCTAD experience Henri Laurencin INTERNATIONAL SEMINAR ON TIMELINESS, METHODOLOGY AND COMPARABILITY.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
The views expressed in this presentation do not necessarily reflect those of the Federal Reserve Bank of New York or the Federal Reserve System Association.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Generation Adequacy Task Force Update to WMS September 14, 2011.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
PJM©2010 PJM Regional Transmission Planning Experience Andrew Ott Senior Vice President, Markets 2010 NASUCA Mid-Year Meeting June 15, 2010.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003.
Addressing Constrained-Off Payments for Intertie Transactions Darren Matsugu, Supervisor - Markets, IESO Presentation to Technical Panel: June 2, 2015.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
EECP External Communications ERCOT Governmental Relations & Communications COPS June 27, 2006.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Sep 22, 2003Market Operations Standing Committee of the IMO1 Change Management: Market Rules Update John MacKenzie, IMO.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
An Overview of Demand Response in California July 2011.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Managing a functional exercise for the first time Graham Leonard, Business Continuity Manager Insights and lessons 17 June 2014.
LOLEv Methodology Details GATF April 5, Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Connecticut Department of Energy and Environmental Protection March 24, 2016 Presentation to the Energy & Technology Committee Informational Forum on Adequacy.
1 Energy Efficiency Opportunities Bubble Chart Background.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
MAPE Publication Neil McAndrews For Bob Ryan of Deutsche Bank.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Changes to Reserve Level Declaration Guidelines
Planning Reserve Margin
Wholesale Electricity Costs
Micro Hydro Power Management
Weekly System Status week 34 (19/08/2019 – 25/08/2019) System Operator
Presentation transcript:

Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity Market Operator June 27, 2002

Forecasts and Assessments 18 - Month Forecast Forecast margins Key messages Outage process Challenges Statistics 18 - Month Forecast Forecast margins Key messages Outage process Challenges Statistics

Reserve Margins

18-Month Outlook Reference scenario assumes: forecast demand based on normal weather existing generation availability per market participants 3000 MW of new/returning generation on dates indicated by market participants generator outage plans as of May 2002 Delayed scenario assumes all new/returning generation delayed by one year. Reference scenario assumes: forecast demand based on normal weather existing generation availability per market participants 3000 MW of new/returning generation on dates indicated by market participants generator outage plans as of May 2002 Delayed scenario assumes all new/returning generation delayed by one year.

18-Month Outlook Basic message: Until generation planned to be placed in-service within the next 12 months actually begins to operate, there will continue to be significant periods when reserves are lower than required (i.e negative reserve margins) Basic message: Until generation planned to be placed in-service within the next 12 months actually begins to operate, there will continue to be significant periods when reserves are lower than required (i.e negative reserve margins)

18-Month Outlook Reserves are required to account for unforeseen events (e.g extreme weather and generator forced outages) Past experience suggests that sufficient external resources should be available to offer into the Ontario market during low reserve periods However, extreme weather or higher than forecast generator forced outages could require emergency operating procedures to be invoked Reserves are required to account for unforeseen events (e.g extreme weather and generator forced outages) Past experience suggests that sufficient external resources should be available to offer into the Ontario market during low reserve periods However, extreme weather or higher than forecast generator forced outages could require emergency operating procedures to be invoked

18-Month Outlook Potential market impacts during low reserve periods include: upward pressure on market prices increased importance of external resources limited opportunities for the IMO to approve the release of generators for planned outages (time stamp is critical) Potential market impacts during low reserve periods include: upward pressure on market prices increased importance of external resources limited opportunities for the IMO to approve the release of generators for planned outages (time stamp is critical)

18-Month Outlook Anticipated market responses include: Ontario generators maximizing their availability to offer in the Ontario market Marketers arranging imports to meet Ontario requirements Consumers taking measures to reduce their consumption Anticipated market responses include: Ontario generators maximizing their availability to offer in the Ontario market Marketers arranging imports to meet Ontario requirements Consumers taking measures to reduce their consumption

18-Month Outlook Market participants are required to provide updated information to the IMO in a timely manner (MR ) Validity of generator adequacy assessments depends on having the most accurate information available (particularly generator in-service dates or return-to-service dates) Market participants are required to provide updated information to the IMO in a timely manner (MR ) Validity of generator adequacy assessments depends on having the most accurate information available (particularly generator in-service dates or return-to-service dates)

Outage Process Challenges Calculation of unavailable capacity Request for outage web form Outage volume Equipment names and cross referencing Outage reporting requirements Challenges Calculation of unavailable capacity Request for outage web form Outage volume Equipment names and cross referencing Outage reporting requirements

Outage Volume

Outage Participants 114 Market Participants with equipment requiring outage reporting 267 non OPG/Hydro One outages in May Co-operation and communication are essential Contact information Provide current information for outage contact 114 Market Participants with equipment requiring outage reporting 267 non OPG/Hydro One outages in May Co-operation and communication are essential Contact information Provide current information for outage contact