P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.

Slides:



Advertisements
Similar presentations
1 MICE Target Status Chris Booth 3 rd March 2004.
Advertisements

MOTION CONTROL ECE 105 Industrial Electronics Engr. Jeffrey T. Dellosa College of Engineering and Information Technology Caraga State University Ampayon,
MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
The MICE Target Lara Howlett University of Sheffield.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
MICE Target Status Chris Booth 30 th March Chris BoothUniversity of Sheffield 2 The challenge ISIS beam shrinks from 73 mm to 55 mm radius during.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Target Status Report Lara Howlett University of Sheffield.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
Data Acquisition Risanuri Hidayat.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
1 Autonomously Controlled Vehicles with Collision Avoidance Mike Gregoire Rob Beauchamp Dan Holcomb Tim Brett.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Progress on Target Design Chris Booth Sheffield 14 th July 2004.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
1 Color Discriminating Tracking System Lloyd Rochester Sam Duncan Ben Schulz Fernando Valentiner.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
MOM report – part I Roumen Tsenov as MOM ( )
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Overview What is Arduino? What is it used for? How to get started Demonstration Questions are welcome at any time.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
MICE Target - Risk Lara Howlett University of Sheffield.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE Target Development Lara Howlett University of Sheffield.
Status of Target Design Chris Booth Sheffield 28 th October 2004.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
CLOSED LOOP SPEED CONTROL OF DC MOTOR WITH PWM TECHNIQUE
KNU RTLAB A Real-Time Linux System For Autonomous Navigation And Flight Attitude Control Of An Uninhabited Aerial Vehicle Charles E. Hall, Jr. Mechanical.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
The Target Drive For The MICE Experiment Control and Infrastructure Optical Readout and Drive Electronics Target Drive A linear electromagnetic drive has.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Chris Booth Sheffield 29th March 2006
Target Installation Plan
Wireless Power Driven Car or Train
SCADA for Remote Industrial Plant
Microcontroller Applications
MICE Target Report Video Conference 29/11/07
Predefined Speed Control of BLDC Motor
Outlines : Introduction . Construction . Control .
Pulse Width Modulation (PWM) Motor Feedback - Shaft Encoder
Status of Target Design
Series 5300 Lithium Cell Formation System
Presentation transcript:

P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006

P J SmithUniversity of Sheffield2 Presentation Overview Actuator Details Target Position Monitoring Control System Power Electronics DAQ (Briefly) Future Work/Conclusions

P J SmithUniversity of Sheffield3 Actuator Details Composed of 24 stacked coils each ~3mm thick From the ‘ electronics ’ point of view it can be effectively be though of as 4 units of 6 coils A A A’ B’ B B CCC’ A A A’ B’ B B CCC’ The device can be driven in a similar fashion to a three phase rotary motor

P J SmithUniversity of Sheffield4 A A A’ B’ B B CCC’ A A A’ B’ B B CCC’ 123 4A4B4C 4C'4B'4A'. Presently all coils are wired in series as a single ‘bank’ The shuttle can be driven in two modes - On Phase Here, accurately knowing the position of the shuttle is critical - Off Phase A A A’ B’ B B CCC’ A A A’ B’ B B CCC’

P J SmithUniversity of Sheffield5 A A A’ B’ B B CCC’ A A A’ B’ B B CCC’ 2A2B2C 2C'2B'2A' 123. A A A’ B’ B B CCC’ A A A’ B’ B B CCC’ 2A2B2C 2C'2B ‘ 2A' Bank System

P J SmithUniversity of Sheffield6 Modes Of Operation PARKNO POWER HOLDOFF-PHASE3 Amps ACTUATE ENABLE OFF-PHASE3 Amps ACTUATEON-PHASE~80 Amps

P J SmithUniversity of Sheffield7 Position Monitoring Previously we had been using three hall switches aligned to a set of small magnets embedded into the shaft to give positional information This has now been replaced by a optical quadrature system that uses three lasers to track a grating attached to the shaft of the shuttle

P J SmithUniversity of Sheffield8 How does it Work? Single Mode Optic Fibers Lenses Grating – Slits at 300 micron spacing Receiver LASER Source Shaft of Shuttle Collimators Multi-mode optical fibres

P J SmithUniversity of Sheffield9 Single mode fibres – transmitting Multimode fibres – collecting Grating

P J SmithUniversity of Sheffield10 Hall SwitchesOptical Position known to about 3mmPosition known to about 150 micron Only provided modulo 6 positional information Absolute position is known Questions about reliability of Hall Switches in Radiation Still Questions about Reliability – but radiation hard components and fibres can be used Long signal cables 50m required in electrically noisy environment Effectively noiseless transmission Position Monitoring

P J SmithUniversity of Sheffield11 The system has proved to be a much better way of ascertaining the shuttles position than the Hall switches BUT there has been both hardware and software ‘ bugs ’ : this system is presently being developed and improved. -Development of ‘ flat ’ windows to improve collimation and light collection -Upgrade of electronics to remove some problems with the index channel -Upgrade of software to ensure that position data is accurately read by other boards Position Monitoring

P J SmithUniversity of Sheffield12 Diagram of the System Laser Collimators Optical Amplifier Quadrature Board -  P Programmable Index Offset -  P Control Board Power Electronics Control Board -  P Current Controller

P J SmithUniversity of Sheffield13 Control System Output from the position system is input into the controller Using PIC processors – Now that we are gaining some experience with these processors we are able to upgrade them. More Speed - 8MIPS. More memory This takes the positional information and other status/inputs and decides what coils in the actuator should be powered and at what current – Uses look-up tables Different lookup tables can represent different actuation depths or actuation profiles.

P J SmithUniversity of Sheffield14 Control System We are also in the process of upgrading the interface between the controller and the power electronics from an electrical interface to an optical one This is a reflection upon the decision to move the power unit into the ISIS ring and also provides a consistent interface

P J SmithUniversity of Sheffield15 Actuator & Optics Power Electronics Control Electronics ISIS HALL MICE HALL 5 metres ~50 metres Cable Optic Fibres

P J SmithUniversity of Sheffield16  Power Electronics  In the lab we have been using a system that allows us to pulse the actuator at up to 10A With this we have achieved an actuation depth of 28mm in 50ms. This was in free air and the coil timings have not yet been optimised – possible room for improvement? The current to the actuator is controlled by superimposing a 20kHz PWM signal onto the coil switching signals. The duty cycle of the PWM determines the ‘ effective ’ current that the actuator sees. An effective current of 2-3 Amps is sufficient to levitate the shuttle

P J SmithUniversity of Sheffield17  Power Electronics  BUT: 10 amps is not enough to actuate the shuttle to specification! – We suspect that ~80 amps is the minimum current that will be required to do this The design of a suitable power stage has been taken on by Daresbury Laboratories in the UK – Steve Griffiths, Jim Cartledge

P J SmithUniversity of Sheffield18  Power Electronics  Daresbury design will centre around a trickle charged capacitor bank as the high currents are only required for a relatively short duty cycle As the current requirement is not yet well specified they are using IGBTs ( Insulated Gate Bipolar Transistor ) that are rated up to 20kHz The idea here is to give us plenty of overhead so if we should find that the actuators current requirement is higher than expected then it will be relatively easy to provide it without a major redesign. We should obtain the first of two power modules from Daresbury by late summer – In time for tests at RAL in October

P J SmithUniversity of Sheffield19  Power Electronics  Much to do on the mechanical design to ensure that the actuator can dissipate the heat when 80 Amps is passed through it. Improve the thermal conduction away from the coils One electronic solution is to run the actuator coils as a series of 2 or 4 banks -This could reduce thermal loading by up to ~50% -But significantly increases the complexity of the controller -Requires more Power Drivers

P J SmithUniversity of Sheffield20 DAQ DAQ was covered at Osaka in more detail by Lara DAQ write individual pulses to file Analysis of individual pulses For each insertion the position is monitored to ~150 microns at 500ns time resolution Analysis of trends over time Future upgrade to an EPICS system so that the target performance can be monitored and recorded by MICE users

P J SmithUniversity of Sheffield21 10 Ampere Pulse – 38mm travel 10 Ampere Pulse – 28mm travel

P J SmithUniversity of Sheffield22 Current & Future Work Much of the electronics is being ‘ upgraded ’ at the moment – Hence the lack of photos and video clips of a working actuator!! -Quadrature boards -Controller boards -Optical Links being installed Starting to take the issues of ‘ noise ’ more seriously as the long term reliability of the electronics is important -Wiring layout -Appropriate shielding All of this should be completed before the July tests.

P J SmithUniversity of Sheffield23 Redesign of optical block to remove alignment/light collection problem This is something that we have only just started to look at – doubtful that the present optical block will be replaced for July – but certainly for the October tests Current & Future Work

P J SmithUniversity of Sheffield24 Conclusion We have had hundreds of recorded pulses from the system with it running at an actuation current of 10A It has been reliably(?) actuated for an average of 45 minutes without dropout at 0.3Hz What we have learnt from this is being recycled back into the next iteration of design for the electronics to make a system that is far more robust and reliable The actuator is being moved from being actuated in open air to being actuated in a vacuum system We are acquiring a Power Supply that should allow us to actuate the shuttle through the required envelope for operation in ISIS – Questions over coil heating yet to be resolved We need to prove the long term reliability of the electronics and the optical system