3-14-2002Instrument Engineering ARCS Review Engineering Design Ralph Niemann Don Ghilardi Robb Williams.

Slides:



Advertisements
Similar presentations
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Lecture 18. Chemical: XPS.
Overview of the ARCS Project Plan: The View at One Year Doug Abernathy ARCS Instrument Scientist ARCS IDT Meeting Lujan Center, LANL September 30, 2002.
ARCS Sample Manipulation Concept Overview. ARCS Sample Area.
IDT Meeting Welcome Brent Fultz California Institute of Technology Broad-brush overview of Hardware, Software, Management.
Hardware Progress Doug Abernathy ARCS Instrument Scientist ARCS IDT Meeting Lujan Center, LANL September 30, 2002 SNS Instrument SystemsArgonne/Oak Ridge.
Proposal for Convection Absorber Test with Hydrogen at Fermilab Barry Norris Representing colleagues in BD/Cryogenics February 21, 2003.
Status of Procurements for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug. 9, 2004.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Overview of the Schedule and Budget for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown.
Section 6.4 Another Application of Integration. Definition: Work Work generally refers to the amount of effort required to perform a task.
Experimental Facilities DivisionOak Ridge National Laboratory March 2005 ARCS Update Doug Abernathy ARCS Instrument Scientist March 20, 2005 Joint IDT.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Compressor status AWAKE Technical Board meeting 19 May 2015.
HYSPEC Instrument: Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Shielding the Turbomolecular Pump: an update 14 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
Mitglied der Helmholtz-Gemeinschaft ZEA-1 | Technology for Excellent Science SKADI - Report FZJ Meeting Lund Romuald Hanslik FZJ/ZEA-1 1.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Neutron Chopper Technologies Work Package
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
ESS Vacuum Standardization
1 Building Design Progress Dan Wilcox March 2012.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
CERN – Zanon discussions
QXF Coil Fabrication & Tooling Reaction / Impregnation
CBETA Technical Review
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
Component And Instrument Symbols
Engineering Technology Division
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
XFEL Collimation and Beam Switchyard Vacuum Issues
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
SNS PPU Cryomodule Instrumentation
ICS update 7th Experiment Control Workshop
Installation of New Officers
ISRC and LEBT Vacuum System Design
Primary Spectrometer & Sample Environment
Ion Source and LEBT Beam Diagnostics
Safety Readiness Review (SRR) Thomas Hansson, ESH
NSS integrated installation plan workshop Introduction
Mounting & Alignment Malcolm Guthrie
Presentation transcript:

Instrument Engineering ARCS Review Engineering Design Ralph Niemann Don Ghilardi Robb Williams

Instrument Engineering Recent Design Issues Detector Mounting Vacuum Vessel Concepts System Integration

Instrument Engineering Detector Module Mounting 8 Detectors per Module Neutron Shielding Read out card (ROC) mounting Current concept ~35 pounds

Instrument Engineering Module Mounting Assume Man Access from behind for now Potential Access: –From above/below –Remote Access

Instrument Engineering Module Mounting

Instrument Engineering Module Mounting

Instrument Engineering Module Mounting

Instrument Engineering Vacuum Vessel Tank Particulars –70 Cubic Meters –3.9 meter radius –Irregular shape to accommodate building –35,000 pounds

Instrument Engineering Tank Drawing

Instrument Engineering Tank Plan View

Instrument Engineering Sample Gate Concept Ability to change sample without bringing entire vessel to atmosphere Other concepts still need to be investigated.

Instrument Engineering Sample Chamber

Instrument Engineering Sample Chamber

Instrument Engineering Sample Access Hoist for sample equipment Access to sample area from Central Lab Office Miscellaneous tank controls accessible from sample area

Instrument Engineering Pump Access

Instrument Engineering Instrument Shielding Poured in Place High Density Concrete Stackable High Density Concrete Steel Shielding 18” around the beam

Instrument Engineering Fermi Chopper Mounting Remote Adjustment in and out of beam Integrate design with shielding to allow access from the top of shielding

Instrument Engineering

Instrument Engineering Upcoming Efforts Detector Mounting –Test Chamber Detector in Vacuum Module Handling Vacuum Chamber –Tank Access –Installation Issues –“Crispy Mix” Mounting and Vacuum Effects Sample Chamber –Gate Concept –Sample Manipulation –Other Components Collimator “Thimble” System Integration –Conventional Facilities –Safety Regulations